# US 2019/0376702 A1 · Method for sequencing compressor operation based on space humidity

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0376702 A1
- Document ID: US20190376702A1
- Status: Published application
- Kind: A1
- Application number: 16/547,306
- Filed: 2019-08-21
- Published: 2019-12-12
- Earliest claimed: 2016-10-05
- Assignees: Johnson Controls Technology Company
- Applicants: Johnson Controls Technology Company
- Inventors: Nathan T. Ostrye; Aron Marc Seiler; Christopher R. Amundson; Tyler Paddock
- Web page: https://patentgrep.com/patent/US20190376702A1

## CPC

- F24F 3/153: with subsequent heating, i.e. with the air, given the required humidity in the central station, passing a heating element to achieve the required temperature
- F24F 3/1405: {in which the humidity of the air is exclusively affected by contact with the evaporator of a closed-circuit cooling system or heat pump circuit}
- F24F 11/30: for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F 11/83: by controlling the supply of heat-exchange fluids to heat-exchangers
- F24F 11/84: using valves
- F24F 11/85: using variable-flow pumps
- F24F 2110/20: Humidity
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)

## Abstract

A multi-circuit refrigeration system includes a first plurality of compressors, a second plurality of compressors, and a control panel. The control panel is configured to receive an input related to humidity from a humidity sensor or humidistat. Based on the input, the control panel is configured to sequence operation of the first plurality of compressors and the second plurality of compressors between a balanced mode and a clustered mode. In the balanced mode, a first compressor of the first plurality of compressors and a first compressor of second plurality of compressors are energized before a second compressor of the first plurality of compressors or a second compressor of the second plurality of compressors is energized. In the clustered mode, the first compressor and the second compressor of the first plurality of compressors are energized before the first compressor or the second compressor of the second plurality of compressors is energized.

## Claims

### Claim 1

A method for operating compressors of a multi-circuit refrigeration system, comprising:
receiving an input related to humidity from a humidity sensor or humidistat; and
based on the input, sequencing operation of a first plurality of compressors of a first refrigeration circuit and a second plurality of compressors of a second refrigeration circuit between a balanced mode and a clustered mode, wherein sequencing compressors in the balanced mode comprises:
energizing a first compressor of the first plurality of compressors and a first compressor of the second plurality of compressors before energizing a second compressor of the first plurality of compressors or a second compressor of the second plurality of compressors,
and wherein sequencing compressors in the clustered mode comprises:
energizing the first compressor and the second compressor of the first plurality of compressors before energizing the first compressor or the second compressor of the second plurality of compressors.

### Claim 2 (depends on 1)

The method of claim 1, comprising changing the sequencing operation of the first plurality of compressors and the second plurality of compressors during operation of the multi-circuit refrigeration system, wherein the sequencing operation is changed between the balanced mode and the clustered mode.

### Claim 3 (depends on 2)

The method of claim 2, comprising setting a transition mode of changing the sequencing operation, wherein the transition mode is selectable between a smooth transition mode and a rapid transition mode, wherein the smooth transition mode prioritizes minimizing wear on compressors when changing the sequencing operation of the first plurality of compressors and the second plurality of compressors, and wherein the rapid transition mode prioritizes minimizing time until the first plurality of compressors and the second plurality of compressors are energized according to a new sequence.

### Claim 4 (depends on 3)

The method of claim 3, wherein changing the sequencing operation according to the rapid transition mode does not shut down an energized compressor of the first plurality of compressors or the second plurality of compressors before the energized compressor has been operating for a minimum operational run time.

### Claim 5 (depends on 1)

The method of claim 1, wherein the first plurality of compressors and the second plurality of compressors are sequenced according to the clustered mode when the input indicates that dehumidification is requested, and wherein the first plurality of compressors and the second plurality of compressors are sequenced according to the balanced mode when the input indicates that dehumidification is not requested.

### Claim 6 (depends on 1)

The method of claim 1, comprising:
compressing a first gaseous refrigerant into a first compressed refrigerant via the first plurality of compressors of the first refrigeration circuit;
compressing a second gaseous refrigerant into a second compressed refrigerant via the second plurality of compressors of the second refrigeration circuit;
directing a portion of the first compressed refrigerant along a reheat circuit from at least one compressor of the first plurality of compressors to the reheat heat exchanger;
transferring heat via a reheat heat exchanger from the portion of the first compressed refrigerant of the first refrigeration circuit to supply air provided to a conditioned space to warm the supply air;
sequencing operation of the first and second pluralities of compressors in the clustered mode when the input indicates that dehumidification is requested; and
sequencing operation of the first and second pluralities of compressors in the balanced mode when the input indicates that only cooling is requested.
