# US 2019/0357149 A1 · Full-Duplex Transmission Control Method, User Equipment, and Base Station

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0357149 A1
- Document ID: US20190357149A1
- Status: Published application
- Kind: A1
- Application number: 15/750,746
- Filed: 2015-08-07
- Published: 2019-11-21
- Earliest claimed: 2015-08-07
- Assignees: Huawei Technologies Co., Ltd.
- Applicants: Huawei Technologies Co., Ltd.
- Inventors: Lili Zhang
- Web page: https://patentgrep.com/patent/US20190357149A1

## CPC

- H04L 5/0044: {Allocation of payload; Allocation of data channels, e.g. PDSCH or PUSCH}
- H04W 52/146: {Uplink power control}
- H04L 1/0005: {applied to payload information}
- H04L 5/16: Half-duplex systems; Simplex/duplex switching; Transmission of break signals {non-automatically inverting the direction of transmission}
- H04W 52/0216: {using a pre-established activity schedule, e.g. traffic indication frame}
- H04W 52/0229: {where the received signal is a wanted signal}
- H04W 52/04: Transmission power control [TPC]
- H04W 72/21: in the uplink direction of a wireless link, i.e. towards the network
- H04W 72/23: in the downlink direction of a wireless link, i.e. towards a terminal
- H04L 5/1423: {for simultaneous baseband signals}
- Y02D 30/70: in wireless communication networks
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

A full-duplex transmission control method, user equipment, and a base station, where the full-duplex transmission control method includes obtaining, by user equipment, a first time resource unit, correcting, by the user equipment according to a power offset obtained by the user equipment, first uplink transmission power used for half-duplex transmission to obtain second uplink transmission power used for the full-duplex transmission when the user equipment obtains, from the first time resource unit, included scheduling grant information indicating full-duplex transmission, and transmitting, by the user equipment, an uplink signal in the first time resource unit or a second time resource unit according to the second uplink transmission power, where the second time resource unit is a time resource unit that is after the first time resource unit in terms of time.

## Claims

### Claim 1

A full-duplex transmission control method, comprising:
obtaining, by user equipment, a first time resource block;
correcting, by the user equipment according to a power offset obtained by the user equipment, first uplink transmission power used for half-duplex transmission to obtain second uplink transmission power used for full-duplex transmission when the user equipment obtains, from the first time resource block, scheduling grant information indicating the full-duplex transmission; and
transmitting, by the user equipment, an uplink signal in the first time resource block or a second time resource block; according to the second uplink transmission power, wherein the second time resource block is a time resource block that is after the first time resource block in terms of time.

### Claim 2 (depends on 1)

The method according to claim 1, wherein obtaining the first time resource block comprises:
detecting, by the user equipment in a third time resource block that is before the first time resource block, whether there is uplink scheduling information indicating to perform transmission in the first time resource block or the second time resource block;
detecting, by the user equipment in the first time resource block or a fourth time resource block that is before the first time resource block, whether there is downlink scheduling information indicating to perform the transmission in the first time resource block or the second time resource block, wherein the third time resource block and the fourth time resource block are two different time resource blocks; and
determining, by the user equipment that the first time resource block comprises the scheduling grant information indicating the full-duplex transmission when the uplink scheduling information is detected in the third time resource block, a quantity of time resource blocks between the first time resource block and the third time resource block meets a preconfigured difference value, and the downlink scheduling information is detected in the first time resource block or the fourth time resource block; and
determining, by the user equipment, that the first time resource block does not comprise the scheduling grant information indicating the full-duplex transmission when the uplink scheduling information is not detected in the third time resource block, the quantity of time resource blocks between the first time resource block and the third time resource block docs not meet the preconfigured difference value, or the downlink scheduling information is not detected in the first time resource block or the fourth time resource block.

### Claim 3 (depends on 1)

The method according to claim 1, wherein obtaining the first time resource block comprises:
detecting, by the user equipment in the first time resource block, whether there is uplink feedback information corresponding to downlink data information transmission in a fifth time resource block that is before the first time resource block;
detecting, by the user equipment, in the first time resource block or a fourth time resource block that is before the first time resource block, whether there is downlink scheduling information indicating to perform transmission in the first time resource block or the second time resource block, wherein the fourth time resource block and the fifth time resource block are two different time resource blocks;
determining, by the user equipment, that the first time resource block comprises the scheduling grant information indicating the full-duplex transmission if when the uplink feedback information corresponding to the downlink data information transmission in the fifth time resource block is detected in the first time resource block, a quantity of time resource blocks between the first time resource block and the fifth time resource block meets a preconfigured difference value, and the downlink scheduling information is detected in the first time resource block or the fourth time resource block; and
determining, by the user equipment, that the first time resource block does not comprise the scheduling grant information indicating the full-duplex transmission when the uplink feedback information is not detected in the first time resource block, the quantity of time resource blocks between the first time resource block and the fifth time resource block does not meet the preconfigured difference value, or the downlink scheduling information is not detected in the first time resource block or the fourth time resource block.

### Claim 4

(canceled)

### Claim 5 (depends on 2)

The method according to claim 2, wherein before correcting the first uplink transmission power used for the half-duplex transmission, the method further comprises:
obtaining, by the user equipment from the uplink scheduling information in the third time resource block, the first uplink transmission power used for the half-duplex transmission, or obtaining, by the user equipment from a fifth time resource block that is before the first time resource block, the first uplink transmission power used for the half-duplex transmission; and
obtaining, by the user equipment, the power offset in a predefined manner, or obtaining the power offset from the first time resource block or the fourth time resource block.

### Claim 6 (depends on 2)

The method according to claim 2, wherein the uplink signal comprises:
uplink data information that the uplink scheduling information in the third time resource block instructs to transmit in the first time resource block or the second time resource block; or
uplink feedback information in the first time resource block corresponding to downlink data information in a fifth time resource block that is before the first time resource block.

### Claim 7 (depends on 2)

The method according to claim 2, wherein when the uplink scheduling information is detected in the third time resource block, the quantity of time resource blocks meets the preconfigured difference value, the downlink scheduling information is detected in the first time resource block or the fourth time resource block, and after detecting whether there is the uplink scheduling information, the method further comprises canceling, by the user equipment according to a power offset comprised in the downlink scheduling information, uplink data information transmission that the uplink scheduling information in the third time resource block instructs to perform in the first time resource block or the second time resource block when the power offset comprised in the downlink scheduling information comprises a preconfigured offset value with a special definition.

### Claim 8 (depends on 1)

The method according to claim 1, wherein the power offset is obtained by the user equipment in a predefined manner, wherein the power offset is detected by the user equipment from downlink scheduling information in die first time resource block or from scheduling grant information in each of multiple configured time resource blocks, wherein the multiple configured time resource blocks are a subset of a set of all grant time resource blocks in which the full-duplex transmission can be detected, and wherein before correcting the first uplink transmission power used for the half-duplex transmission, the method further comprises triggering, by the user equipment, the power offset to be used when the power offset is obtained by the user equipment in the predefined manner and when detecting corresponding trigger signaling from the scheduling grant information in the first time resource block or that in a time resource block that is before the first time resource block.

### Claim 9 (depends on 8)

The method according to claim 8, wherein obtaining the power offset in the predefined manner comprises:
receiving, by the user equipment, broadcast signaling or dedicated signaling from a base station; and
obtaining, by the user equipment, the power offset using the broadcast signaling or the dedicated signaling.

### Claim 10 (depends on 8)

The method according to claim 8, wherein detecting the power offset comprises:
detecting, by the user equipment, the power offset from information newly added to the scheduling grant information; or
detecting, by the user equipment, the power offset from original information redefined in the scheduling grant information.

### Claim 11 (depends on 1)

The method according to claim 1, wherein obtaining the first time resource block comprises:
detecting, by the user equipment in the first time resource block, whether there are uplink scheduling information and downlink scheduling information;
determining, by the user equipment that the first time resource block comprises the scheduling grant information indicating the full-duplex transmission when both the uplink scheduling information and the downlink scheduling information are detected in the first time resource block; and
determining that the first time resource block does not comprise the scheduling grant information indicating the full-duplex transmission, when at most, one piece of scheduling information in the uplink scheduling information or the downlink scheduling information is detected in the first time resource block.

### Claim 12

(canceled)

### Claim 13 (depends on 1)

The method according to claim 1, wherein after correcting the first uplink transmission power used for the half-duplex transmission, the method further comprises:
obtaining, by the user equipment, a modulation and coding scheme (MCS) offset that matching the power offset; and
correcting, by the user equipment according to the MCS offset, a first MCS index used for the half-duplex transmission to obtain a second MCS index used for the full-duplex transmission.

### Claim 14 (depends on 13)

The method according to claim 13, wherein obtaining the MCS offset matching the power offset comprises:
receiving, by the user equipment, the MCS offset using broadcast signaling or dedicated signaling; or
obtaining, by the user equipment, the MCS offset using a predefined mutual matching relationship between the power offset and the MCS offset.

### Claim at position 15

-23. (canceled)

### Claim 24

User equipment, comprising:
a memory comprising instructions; and
a processor coupled to the memory, wherein the instructions cause the processor to be configured to:
obtain a first time resource block;
correct, according to a power offset obtained by the user equipment, first uplink transmission power used for half-duplex transmission to obtain second uplink transmission power used for full-duplex transmission when scheduling grant information indicating the full-duplex transmission is obtained from the first time resource block; and
transmit an uplink signal in the first time resource block or a second time resource block according to the second uplink transmission power, wherein the second time resource block is a time resource block that is after the first time resource block in terms of time.

### Claim 25 (depends on 24)

The user equipment according to claim 24, wherein the instructions further cause the processor to be configured to:
detect, in a third time resource block that is before the first time resource block, whether there is uplink scheduling information indicating to perform transmission in the first time resource block or the second time resource block;
detect, in the first time resource block or a fourth time resource block that is before the first time resource block, whether there is downlink scheduling information indicating to perform the transmission in the first time resource block or the second time resource block, wherein the third time resource block and the fourth time resource block are two different time resource blocks;
determine that the first time resource block comprises the scheduling grant information indicating the full-duplex transmission when the uplink scheduling information is detected in the third time resource block, a quantity of time resource blocks between the first time resource block and the third time resource block meets a preconfigured difference value, and the downlink scheduling information is detected in the first time resource block or the fourth time resource block; and
determine that the first time resource block does hot comprise the scheduling grant information indicating the full-duplex transmission when the uplink scheduling information is not detected in the third time resource block, the quantity of time resource blocks between the first time resource block and the third time resource block does not meet the preconfigured difference value, or the downlink scheduling information is not detected in the first time resource block or the fourth time resource block.

### Claim 26 (depends on 24)

The user equipment according to claim 24, wherein the instructions further cause the processor to be configured to:
detect, in the first time resource block, whether there is uplink feedback information corresponding to downlink data information transmission in a firth time resource block that is before the first time resource block;
detect, in the first time resource block or a fourth time resource block that is before the first time resource block, whether there is downlink scheduling information indicating to perform transmission in the first time resource block or the second time resource block, wherein the fourth time resource block and the fifth time resource block are two different time resource blocks;
determine that the first time resource block comprises foe scheduling grant information indicating the full-duplex transmission when the uplink feedback information corresponding to the downlink data information transmission in the fifth time resource block is detected in the first time resource block, a quantity of time resource blocks between the first time resource block and the fifth time resource block meets a preconfigured difference value, and the downlink scheduling information is detected in the first time resource block or the fourth time resource block; and
determine that the first time resource block does not comprise the scheduling grant information indicating the full-duplex transmission when the uplink feedback information is not detected in the first time resource block, the quantity of time resource blocks between the first time resource block and the fifth time resource block does not meet the preconfigured difference value, or the downlink scheduling information is not detected in the first time resource block or the fourth time resource block.

### Claim 27

(canceled)

### Claim 28 (depends on 25)

The user equipment according to claim 25, wherein the instructions further cause the processor to be configured to:
obtain, from the uplink scheduling information in the third time resource block or from a fifth time resource block that is before the First time resource block, the first uplink transmission power used for the half-duplex transmission before correcting the first uplink transmission power used for the half-duplex transmission; and
obtain the power offset in a predefined manner or from the first time resource block or the fourth time resource block.

### Claim 29 (depends on 25)

The user equipment according to claim 25, wherein the uplink signal comprises:
uplink data information that the uplink scheduling information in the third time resource block instructs to transmit in the first time resource block or the second time resource block; or
the uplink feedback information in the first time resource block corresponding to downlink data information in a fifth time resource block that is before the first time resource block.

### Claim 30

(canceled)

### Claim 31 (depends on 24)

The user equipment according to claim 24, wherein the instructions further cause the processor to be configured to:
obtain the power offset in a predefined manner;
detect the power offset from downlink scheduling information in the first time resource block, or detect the power offset from scheduling grant information in each of multiple configured time resource blocks, wherein the multiple configured time resource blocks are a subset of a set of all grant time resource blocks in which the full-duplex transmission can be detected; and
trigger the power offset to come into effect before correction the first uplink transmission power used for the half-duplex transmission when the power offset is obtained by the user equipment in the predefined manner and corresponding trigger signaling is detected from the scheduling grant information in the first time resource block or that in a time resource block that is before the first time resource block.

### Claim at position 24

-33. (canceled)

### Claim 34 (depends on 24)

The user equipment according to claim 24, wherein the instructions further cause the processor to be configured to;
detect, in the first time resource block, whether there are uplink scheduling information and downlink scheduling information;
determine that the first time resource block comprises the scheduling grant information indicating the full-duplex transmission when both the uplink scheduling information and the downlink scheduling information are detected in the first time resource block; and
determine that the first time resource block does not comprise the scheduling grant information indicating the full-duplex transmission when at most one piece of scheduling information in the uplink scheduling information or the downlink scheduling information is detected in the first time resource block.

### Claim 35

(canceled)

### Claim 36 (depends on 24)

The user equipment according to claim 24, wherein the instructions further cause the processor to be configured to:
obtain a modulation and coding scheme (MCS) offset matching the power offset after the first uplink transmission power used for the half-duplex transmission; and
correct, according to the MCS offset, a first MCS index used for the half-duplex transmission to obtain a second MCS index used for the full-duplex transmission.

### Claim at position 28

-46. (canceled)
