# US 2019/0320366 A1 · Method for controlling handover, user equipment, base station, and radio communication system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0320366 A1
- Document ID: US20190320366A1
- Status: Published application
- Kind: A1
- Application number: 16/455,795
- Filed: 2019-06-28
- Published: 2019-10-17
- Earliest claimed: 2010-02-25
- Assignees: Sony Corporation
- Applicants: Sony Corporation
- Inventors: Hiroaki TAKANO
- Web page: https://patentgrep.com/patent/US20190320366A1

## CPC

- H04W 36/0072: {of resource information of target access point}
- H04L 1/0046: {Code rate detection or code type detection (H04L1/0038 takes precedence; detection of the data rate H04L25/0262; for packet format H04L1/0091)}
- H04L 5/0007: {the frequencies being orthogonal, e.g. OFDM(A) or DMT}
- H04L 5/001: {the frequencies being arranged in component carriers}
- H04L 5/0053: {Allocation of signalling, i.e. of overhead other than pilot signals}
- H04W 72/12: Wireless traffic scheduling
- H04W 72/23: in the downlink direction of a wireless link, i.e. towards a terminal
- H04W 72/541: using the level of interference
- H04L 5/006: {Quality of the received signal, e.g. BER, SNR, water filling}
- H04W 36/0085: {Hand-off measurements}
- H04W 36/08: Reselecting an access point
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

Provided is a method for controlling a handover from a first base station to a second base station by a user equipment that performs radio communication over a communication channel formed by aggregating a plurality of component carriers, wherein scheduling information on each component carrier is transmitted to the user equipment according to either of a straight scheduling method and a cross scheduling method, and the method includes at the first base station, commanding first the user equipment to perform a handover from the first base station to the second base station on a second component carrier to be operated according to the straight scheduling method in the second base station, when it is determined that a handover on a first component carrier following the cross scheduling method is to be executed.

## Claims

### Claim 1

(canceled)

### Claim 2

A user equipment, comprising:
one or more circuits configured to
perform radio communication with a first base station over a communication channel formed by carrier aggregation of a plurality of component carriers;
control a handover from the first base station to a second base station, wherein
the one or more circuits are further configured to
receive, from the first base station, scheduling information of a first component carrier of the plurality of component carriers according to a cross scheduling method, and scheduling information of a second component carrier of the plurality of component carriers according to a straight scheduling method;
receive a command, from the first base station, to perform the handover of the communication channel formed by carrier aggregation of the plurality of component carriers;
cause transfer of the first component carrier of the plurality of component carriers in the first base station to a first transferred component carrier in the second base station; and
stop reception of the scheduling information of the first component carrier of the plurality of component carriers in the first base station.

### Claim 3 (depends on 2)

The user equipment according to claim 2, wherein the one or more circuits are further configured to:
measure a channel quality of the communication channel formed by carrier aggregation of the plurality of component carriers; and
transmit measurement information of the channel quality to the first base station.

### Claim 4 (depends on 2)

The user equipment according to claim 2, wherein scheduling information of the first transferred component carrier in the second base station is according to the straight scheduling method.

### Claim 5 (depends on 2)

The user equipment according to claim 2, wherein the one or more circuits are further configured to cause transfer of the second component carrier in the first base station to a second transferred component carrier in the second base station after causing the transfer of the first component carrier.

### Claim 6

A base station, comprising:
one or more circuits configured to
perform radio communication with a user equipment over a communication channel formed by carrier aggregation of a plurality of component carriers; and
control a handover to another base station by the user equipment, wherein
the one or more circuits are further configured to
transmit scheduling information of a first component carrier of the plurality of component carriers according to a cross scheduling method, and scheduling information of a second component carrier of the plurality of component carriers according to a straight scheduling method;
command the user equipment to perform the handover of the communication channel formed by carrier aggregation of the plurality of component carriers, such that transfer of the first component carrier of the plurality of component carriers in the base station to a first transferred component carrier in the other base station is caused; and
stop transmission of the scheduling information of the first component carrier of the plurality of component carriers in the base station.

### Claim 7 (depends on 6)

The base station according to claim 6, the one or more circuits are further configured to:
receive measurement information from the user equipment; and
determine whether the handover is necessary according to the measurement information transmitted from the user equipment.

### Claim 8 (depends on 6)

The base station according to claim 6, wherein scheduling information of the first transferred component carrier in the other base station is according to the straight scheduling method.

### Claim 9 (depends on 6)

The base station according to claim 6, wherein transfer of the second component carrier in the base station to a second transferred component carrier in the other base station is caused after the transfer of the first component carrier is caused.

### Claim 10

A method for controlling a handover from a first base station to a second base station by a user equipment that performs radio communication over a communication channel formed by carrier aggregation of a plurality of component carriers, the method comprising:
receiving, by the user equipment from the first base station, scheduling information of a first component carrier of the plurality of component carriers according to a cross scheduling method, and scheduling information of a second component carrier of the plurality of component carriers according to a straight scheduling method;
receiving, by the user equipment from the first base station, a command to perform the handover of the communication channel formed by carrier aggregation of the plurality of component carriers;
causing, by the user equipment, transfer of the first component carrier of the plurality of component carriers in the first base station to a first transferred component carrier in the second base station; and
stopping, by the user equipment, reception of the scheduling information of the first component carrier of the plurality of component carriers in the first base station.

### Claim 11 (depends on 10)

The method according to claim 10, further comprising:
measuring, by the user equipment, a channel quality of the communication channel formed by carrier aggregation of the plurality of component carriers; and
transmitting, by the user equipment to the first base station, measurement information of the channel quality.

### Claim 12 (depends on 10)

The method according to claim 10, wherein scheduling information of the first transferred component carrier in the second base station is according to the straight scheduling method.

### Claim 13 (depends on 10)

The method according to claim 10, further comprising:
causing, by the user equipment, transfer of the second component carrier in the first base station to a second transferred component carrier in the second base station after causing the transfer of the first component carrier.

### Claim 14

A method for controlling a handover from a first base station to a second base station by a user equipment that performs radio communication over a communication channel formed by carrier aggregation of a plurality of component carriers, the method comprising:
transmitting, from the first base station to the user equipment, scheduling information of a first component carrier of the plurality of component carriers according to a cross scheduling method, and scheduling information of a second component carrier of the plurality of component carriers according to a straight scheduling method;
commanding, by the first base station, the user equipment to perform the handover of the communication channel formed by carrier aggregation of the plurality of component carriers, such that transfer of the first component carrier of the plurality of component carriers in the first base station to a first transferred component carrier in the second base station is caused; and
stopping, by the first base station, transmission of the scheduling information of the first component carrier of the plurality of component carriers in the first base station.

### Claim 15 (depends on 14)

The method according to claim 14, further comprising:
receiving, by the first base station, measurement information from the user equipment; and
determining, by the first base station, whether the handover is necessary according to the measurement information transmitted from the user equipment.

### Claim 16 (depends on 14)

The method according to claim 14, wherein scheduling information of the first transferred component carrier in the second base station is according to the straight scheduling method.

### Claim 17 (depends on 14)

The method according to claim 14, wherein transfer of the second component carrier in the first base station to a second transferred component carrier in the second base station is caused after the transfer of the first component carrier is caused.
