# US 2019/0319875 A1 · Inter-chassis link failure management system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0319875 A1
- Document ID: US20190319875A1
- Status: Published application
- Kind: A1
- Application number: 15/951,009
- Filed: 2018-04-11
- Published: 2019-10-17
- Earliest claimed: 2018-04-11
- Assignees: Dell Products L.P.
- Applicants: Dell Products L.P.
- Inventors: Senthil Nathan Muthukaruppan; Karthi Kaliyamoorthy
- Web page: https://patentgrep.com/patent/US20190319875A1

## CPC

- H04L 45/28: using route fault recovery
- H04L 43/0811: by checking connectivity
- H04L 45/245: {Link aggregation, e.g. trunking}
- H04L 69/40: for recovering from a failure of a protocol instance or entity, e.g. service redundancy protocols, protocol state redundancy or protocol service redirection (management of faults, events, alarms or notifications in data switching networks H04L41/06)
- H04L 12/4641: {Virtual LANs, VLANs, e.g. virtual private networks [VPN] (LAN interconnection over a bridge based backbone H04L12/462; encapsulation techniques H04L12/4633; routing of packets H04L45/00; packet switches H04L49/00; virtual private networks for security H04L63/0272)}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

An Inter-Chassis Link (ICL) failure management system includes a first switch device and a second switch device coupled together by an Inter-Chassis Link (ICL) that is included in a control network and that is configured to provide a primary control channel for transmitting control information between the first switch device and the second switch device. A third switch device is coupled to each of the first switch device and the second switch device by a first aggregated link. When the first switch device determines that the ICL is unavailable, it causes a first port and a second port that provide the first aggregated link to be added to the control network to provide a primary backup control channel. The first switch device may then send control information to the second switch device through the primary backup control channel via the first port and the second port.

## Claims

### Claim 1

An Inter-Chassis Link (ICL) failure management system, comprising:
a first switch device;
a second switch device that is coupled to the first switch device by an Inter-Chassis Link (ICL) that is included in a control network and that is configured to provide a primary control channel for transmitting control information between the first switch device and the second switch device; and
a third switch device that is coupled to each of the first switch device and the second switch device by a first aggregated link, wherein the first switch device is configured to:
determine that the ICL is unavailable;
cause a first port and a second port that provide the first aggregated link to be added to the control network to provide a primary backup control channel; and
send control information to the second switch device through the primary backup control channel via the first port and the second port.

### Claim 2 (depends on 1)

The system of claim 1, wherein each of the first switch device and the second switch device are configured to:
select, prior to determining the unavailability of the ICL, the first aggregated link as the primary backup control channel.

### Claim 3 (depends on 2)

The system of claim 2, further comprising:
a fourth switch device that is coupled to each of the first switch device and the second switch device by a second aggregated link, wherein each of the first switch device and the second switch device are configured to:
select, prior to determining the unavailability of the ICL, the second aggregated link as a secondary backup control channel.

### Claim 4 (depends on 1)

The system of claim 1, wherein the causing the first port and the second port that provide the first aggregated link to be added to the control network includes:
sending, to the third switch device, an instruction to split the first aggregated link to provide the first port and the second port.

### Claim 5 (depends on 1)

The system of claim 1, wherein the first switch device is configured to add the first port to the control network, and wherein the second switch device is configured to add the second port to the control network.

### Claim 6 (depends on 1)

The system of claim 1, wherein the first switch device is configured to:
determine that the ICL has become available following its unavailability;
cause the first port and the second port to be removed from the control network; and
send control information to the second switch device through the ICL.

### Claim 7

An Information Handling System, comprising:
a processing system; and
a memory system that is coupled to the processing system and that is configured to execute instructions from the memory system to provide an Inter-Chassis Link (ICL) failure management engine that is configured to:
determine that an ICL, which is included in a control network and configured to provide a primary control channel for transmitting control information to a first switch device, is unavailable;
cause a first port and a second port, which provide a first aggregated link to a second switch device, to be added to the control network to provide a primary backup control channel; and
send control information to the first switch device through the primary backup control channel via the first port and the second port.

### Claim 8 (depends on 7)

The IHS of claim 7, wherein the ICL failure management engine is configured to:
select, prior to determining the unavailability of the ICL, the first aggregated link as the primary backup control channel.

### Claim 9 (depends on 8)

The IHS of claim 8, wherein the ICL failure management engine is configured to:
select, prior to determining the unavailability of the ICL, a second aggregated link to a third switch device as a secondary backup control channel.

### Claim 10 (depends on 9)

The IHS of claim 9, wherein the ICL failure management engine is configured to:
determine that the primary backup control channel is unavailable;
cause a third port and a fourth port, which provide the second aggregated link to the third switch device, to be added to the control network as the secondary backup control channel; and
send control information to the first switch device through the secondary backup control channel via the third port and the fourth port.

### Claim 11 (depends on 7)

The IHS of claim 7, wherein the causing the first port and the second port that provide the first aggregated link to be added to the control network includes:
sending, to the second switch device, an instruction to split the first aggregated link to provide the first port and the second port.

### Claim 12 (depends on 7)

The IHS of claim 7, wherein the ICL failure management engine is configured to add the first port to the control network, and wherein the first switch device is configured to add the second port to the control network.

### Claim 13 (depends on 7)

The IHS of claim 7, wherein the ICL failure management engine is configured to:
determine that the ICL has become available following its unavailability;
cause the first port and the second port to be removed from the control network; and
send control information to the first switch device through the ICL.

### Claim 14

A method for Inter-Chassis Link failure management, comprising:
determining, by a first switch device, that an Inter-Chassis Link (ICL) is unavailable, wherein the ICL is included in a control network and configured to provide a primary control channel for transmitting control information to a second switch device;
causing, by the first switch device, a first port and a second port to be added to the control network to provide a primary backup control channel, wherein the first port and the second port provide a first aggregated link to a third switch device; and
sending, by the first switch device, control information to the second switch device through the primary backup control channel via the first port and the second port.

### Claim 15 (depends on 14)

The method of claim 14, further comprising:
selecting, by the first switch device prior to determining the unavailability of the ICL, the first aggregated link as the primary backup control channel.

### Claim 16 (depends on 15)

The method of claim 15, further comprising:
selecting, by the first switch device prior to determining the unavailability of the ICL, a second aggregated link to a fourth switch device as a secondary backup control channel.

### Claim 17 (depends on 16)

The method of claim 16, further comprising:
determining, by the first switch device, that the primary backup control channel is unavailable;
causing, by the first switch device, a third port and a fourth port to be added to the control network as the secondary backup control channel, wherein the third port and the fourth port provide the second aggregated link to the fourth switch device; and
sending, by the first switch device, control information to the first switch device through the secondary backup control channel via the third port and the fourth port.

### Claim 18 (depends on 14)

The method of claim 14, wherein the causing the first port and the second port that provide the first aggregated link to be added to the control network includes:
sending, by the first switch device to the third switch device, an instruction to split the first aggregated link to provide the first port and the second port.

### Claim 19 (depends on 14)

The method of claim 14, wherein the first switch device adds the first port to the control network, and wherein the second switch device adds the second port to the control network.

### Claim 20 (depends on 14)

The method of claim 14, further comprising:
determining, by the first switch device, that the ICL has become available following its unavailability;
causing, by the first switch device, the first port and the second port to be removed from the control network; and
sending, by the first switch device, control information to the second switch device through the ICL.
