# US 2019/0319528 A1 · Switching Power Supply with a Measuring and Calculating Process for the Switching Times

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0319528 A1
- Document ID: US20190319528A1
- Status: Published application
- Kind: A1
- Application number: 16/380,077
- Filed: 2019-04-10
- Published: 2019-10-17
- Earliest claimed: 2018-04-11
- Assignees: TDK Corporation
- Applicants: TDK Corporation
- Inventors: Ken MATSUURA; Min LIN
- Web page: https://patentgrep.com/patent/US20190319528A1

## CPC

- H02M 7/219: in a bridge configuration
- H02M 1/083: {for the ignition at the zero crossing of the voltage or the current}
- H02M 1/088: for the simultaneous control of series or parallel connected semiconductor devices
- H02M 7/217: using semiconductor devices only
- H02M 7/2195: {the switches being synchronously commutated at the same frequency of the AC input voltage}
- H02M 1/0009: {Devices or circuits for detecting current in a converter}
- H02M 1/0058: {by employing soft switching techniques, i.e. commutation of transistors when applied voltage is zero or when current flow is zero (using an auxiliary actively switched resonant commutation circuit connected to an intermediate DC voltage or between two push-pull branches of an inverter bridge H02M7/4811; in resonant inverters H02M7/4815; in inverters operating from a resonant DC source H02M7/4826)}
- H02M 1/0064: {Magnetic structures combining different functions, e.g. storage, filtering or transformation}
- H02M 1/4208: {Arrangements for improving power factor of AC input}
- H02M 1/4233: {using a bridge converter comprising active switches}
- H02M 1/44: Circuits or arrangements for compensating for electromagnetic interference in converters or inverters
- Y02B 70/10: Technologies improving the efficiency by using switched-mode power supplies [SMPS], i.e. efficient power electronics conversion e.g. power factor correction or reduction of losses in power supplies or efficient standby modes
- Y02P 80/10: Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
- H02M: APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF (transformers H01F; dynamo-electric converters H02K47/00; controlling transformers, reactors or choke coils, control or regulation of electric motors, generators or dynamo-electric converters H02P)
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A switching power supply includes a power converter with an inductor and first and second switches that converts a voltage Vac to a voltage Vdc, a detector with a winding that detects zero timing of an inductor current, and a driving signal generator that switches on the second switch based on the zero timing and then switches on the first switch. The driving signal generator ends a period T2 before the zero timing by executing a measuring process for an on period T1 of the second switch, a process that calculates the period T2 from T2=T1×|Vac|/(Vdc−|Vac|)−Tc using a correction time Tc, a process that switches on the first switch for only the period T2, a process that measures an elapsed time between the periods T2 and T1, and a process that changes the correction time Tc so that the elapsed time becomes a target time.

## Claims

### Claim 1

A switching power supply comprising:
a power converter that includes a series circuit with a boost inductor, to which an input voltage Vi is applied, and a switch, and a synchronous rectifier connected to a junction between the boost inductor and the switch, and converts the input voltage Vi to an output voltage Vo which is outputted;
a zero current detector that includes a detection winding, which is magnetically coupled to the boost inductor and outputs a zero current detection signal whose voltage value changes in proportion to a voltage across the boost inductor, and detects zero timing at which an inductor current flowing in the boost inductor becomes zero;
a controller that executes an on/off control process that sets the switch in an on state based on the zero timing, causes energy to accumulate in the boost inductor, switches the switch from the on state into an off state, then sets the synchronous rectifier in a synchronous rectification state to have the energy discharged from the boost inductor to cause the power converter to output the output voltage Vo; and
a voltage meter that measures the input voltage Vi and the output voltage Vo,
wherein the controller causes a second on period T2, where the synchronous rectifier is set in the synchronous rectification state, to end before the zero timing by executing:
a first measuring process that measures a first on period T1 where the switch is set in an on state;
a second on period calculating process that calculates, when a correction time for the second on period T2 is expressed as “Tc”, the second on period T2 according to a following expression
T2=T1×|Vi|/(Vo−|Vi|)−Tc;
the on/off control process that sets the synchronous rectifier in the synchronous rectification state for only the second on period T2 calculated by the second on period calculating process;
a second measuring process that measures an elapsed time from an end of the second on period T2 to a start of the first on period T1; and
a correction time changing process that changes the correction time Tc so that the elapsed time measured by the second measuring process becomes a target time set in advance.

### Claim 2 (depends on 1)

The switching power supply according to claim 1,
wherein during the correction time changing process, the controller calculates, when the correction time Tc used when calculating a length T2 of the second on period T2 in an immediately preceding execution of the second on period calculating process is expressed as Tcn-1, the target time is expressed as target time Ttg, and the elapsed time Td2 measured in an immediately preceding execution of the second measuring process is expressed as Td2n-1, the correction time Tc as a new correction time Tcn based on a following equation to change the correction time Tc used in the second on period calculating process executed following the correction time changing process.
Tcn=Tcn-1+Ttg−Td2n-1
