# US 2019/0319464 A1 · Method for operating ess at optimal efficiency

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0319464 A1
- Document ID: US20190319464A1
- Status: Published application
- Kind: A1
- Application number: 16/467,079
- Filed: 2017-12-06
- Published: 2019-10-17
- Earliest claimed: 2016-12-09
- Assignees: Hyosung Heavy Industries Corporation
- Applicants: Hyosung Heavy Industries Corporation
- Inventors: Sang Hui PARK; Geon Ho AN
- Web page: https://patentgrep.com/patent/US20190319464A1

## CPC

- H02J 3/32: using batteries or super capacitors with converting means
- Y02E 40/10: Flexible AC transmission systems [FACTS]
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A method of operating an ESS with optical efficiency in accordance with the present invention, comprising steps of: collecting charge/discharge efficiency data of a PCS; collecting charge/discharge efficiency data of a battery depending on current state of charge of the battery; creating charge/discharge efficiency data of a unit BESS including the PCS and the battery by using the collected data; determining optimal charge/discharge levels of at least two unit-BESSs included in the ESS by using charge/discharge efficiency data of the at least two unit-BESSs to satisfy commanded input/output power values of the whole ESS at a current point of time; and charging or discharging the at least two unit-BESSs depending on the determined optimal charge/discharge power values.

## Claims

### Claim 1

A method of operating an ESS with optical efficiency, comprising steps of:
collecting charge/discharge efficiency data of a PCS as S10;
collecting charge/discharge efficiency data of a battery depending on current state of charge of the battery as S20;
creating charge/discharge efficiency data of a unit BESS including the PCS and the battery by using the collected data as S40;
determining optimal charge/discharge levels of at least two unit-BESSs included in the ESS by using charge/discharge efficiency data of the at least two unit-BESSs to satisfy commanded input/output power values of the whole ESS at a current point of time as S60; and
charging or discharging the at least two unit-BESSs depending on the determined optimal charge/discharge power values as S80.

### Claim 2 (depends on 1)

The method of claim 1, wherein the step of creating charge/discharge efficiency data of each of the unit-BESSs includes steps of:
dividing a current-SOC section of a battery included in the each of the unit-BESSs into multiple current-SOC subsections; and
drawing relationships between target-SOC of the battery and charge/discharge efficiency of the each unit BESS by combining a relationship between the target-SOC of the battery and charge/discharge efficiency of the battery with that between the target-SOC of the battery and charge/discharge efficiency of the PCS in charge of the battery with respect to the individual current-SOC subsections.

### Claim 3 (depends on 2)

The method of claim 2, wherein the step of creating charge/discharge efficiency data of a unit BESS further includes steps of:
dividing a charge/discharge efficiency level section in the relationships between the target-SOC of the battery and the charge/discharge efficiency of the unit-BESSs into multiple subsections; and
linearizing the relationships between the target-SOC of the battery and the charge/discharge efficiency of the unit-BESSs in the divided multiple subsections.

### Claim 4 (depends on 3)

The method of claim 3, wherein at the step of determining optimal charge/discharge levels of at least two unit-BESSs, optical charge/discharge levels of the at least two unit-BESSs is determined by using the linearized relationships between the target-SOC of the battery and the charge/discharge efficiency of the unit-BESSs in the divided multiple subsections with respect to the individual current-SOC subsections corresponding to the current-SOC of the battery at a specific point of time.

### Claim 5 (depends on 3)

The method of claim 3, wherein the step of determining optimal charge/discharge levels of at least two unit-BESSs determines optimal charge/discharge levels in accordance with following equations.

### Claim 6 (depends on 3)

The method of claim 3, further including a step of:
receiving input/output power values of the whole ESS at a current point of time and obtaining information on current charge/discharge levels of batteries equipped in the at least two unit-BESSs at the current point of time.

### Claim 7 (depends on 1)

The method of claim 1, wherein, after the step of charging or discharging the unit-BESSs, a step of receiving input/output power values of the whole ESS at a next time and obtaining information on current charge/discharge levels of batteries equipped in the at least two unit-BESSs at the next time is performed and returns to the step of determining optimal charge/discharge levels of at least two unit-BESSs.

### Claim 8

A method of operating each of multiple unit-BESSs in an ESS equipping the multiple unit EBSSs composed of individual PCSs and individual batteries with optimal efficiency, comprising steps of:
collecting charge/discharge efficiency data of the PCS;
collecting charge/discharge efficiency data of a battery depending on current-SOC of the battery;
dividing a current-SOC section of the collected charge/discharge efficiency data of the battery into multiple current-SOC subsections;
drawing relationships between target-SOC of the battery and charge/discharge efficiency of the unit-BESSs by combining a relationship between the target-SOC of the battery and charge/discharge efficiency of the battery with that between the target-SOC of the battery and charge/discharge efficiency of the PCS in charge of the battery with respect to the individual current-SOC subsections;
dividing a charge/discharge efficiency level section in the relationships between the target-SOC of the battery and the charge/discharge efficiency of the unit-BESSs into multiple subsections; and
linearizing the relationships between the target-SOC of the battery and the charge/discharge efficiency of the unit-BESSs in the multiple subsections.

### Claim 9 (depends on 8)

The method of claim 8, after the step of linearizing, further performing a step of forming a table by parameterizing the linearized straight line.
