# US 2019/0317539 A1 · System and method of power control for an energy storage charging station

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0317539 A1
- Document ID: US20190317539A1
- Status: Published application
- Kind: A1
- Application number: 16/452,102
- Filed: 2019-06-25
- Published: 2019-10-17
- Earliest claimed: 2014-06-20
- Assignees: General Electric Company
- Applicants: General Electric Company
- Inventors: Santosh Sambamoorthy Veda; Robert Dean King; Irene Michelle Berry; Zhi Zhou; Matthew Christian Nielsen; Lembit Salasoo
- Web page: https://patentgrep.com/patent/US20190317539A1

## CPC

- G05F 1/66: Regulating electric power
- G05F 1/70: Regulating power factor; Regulating reactive current or power
- G06F 1/26: Power supply means, e.g. regulation thereof (for memories G11C)
- G06Q 50/06: Energy or water supply
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/008: Circuit arrangements for power supply or distribution technologies responsive to energy trading
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 3/16: by adjustment of reactive power
- H02J 3/322: {the battery being on-board an electric or hybrid vehicle, e.g. vehicle to grid arrangements [V2G], power aggregation, use of the battery for network load balancing, coordinated or cooperative battery charging}
- H02J 3/388: Arrangements for the handling of islanding, e.g. for disconnection or for avoiding the disconnection of power
- H02J 13/00: Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
- H02J 13/1321: {using a wired telecommunication network or a data transmission bus}
- H02J 13/1331: {using wireless data transmission}
- H02J 13/14: the power network being locally controlled, e.g. home energy management systems [HEMS]
- H02J 13/333: the equipment forming part of substations
- H02J 3/00144: {using phasor measuring units [PMU]}
- H02J 7/50: acting upon multiple batteries simultaneously or sequentially
- H02J 2105/10: Local stationary networks having a local or delimited stationary reach
- H02J 2105/12: supplying households or buildings
- H02J 2105/51: {according to a condition being electrical}
- H02J 2105/52: for limitation of the power consumption in the networks or in one section of the networks, e.g. load shedding or peak shaving
- Y02B 70/30: Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y02E 40/30: Reactive power compensation
- Y02E 40/70: Smart grids as climate change mitigation technology in the energy generation sector
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02P 80/10: Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
- Y02T 10/70: Energy storage systems for electromobility, e.g. batteries
- Y02T 10/7072: Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
- Y02T 90/12: Electric charging stations
- Y02T 90/14: Plug-in electric vehicles
- Y02T 90/16: Information or communication technologies improving the operation of electric vehicles
- Y02T 90/167: Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
- Y04S 10/123: the energy generation units being or involving renewable energy sources
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S 20/12: Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
- Y04S 20/221: General power management systems
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- Y04S 30/12: Remote or cooperative charging
- Y04S 40/124: using wired telecommunication networks or data transmission busses
- Y04S 40/126: using wireless data transmission
- Y04S 50/10: Energy trading, including energy flowing from end-user application to grid
- G05F: SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02T: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A system includes a control unit having one or more processors and a communication interface. The communication interface is configured to communicate with one or more charging stations that are electrically coupled to receive electrical power from a power distribution grid and that are configured to selectively charge one or more energy storage devices connected to the charging stations. The one or more processors are configured to generate first control signals for communication by the communication interface to the one or more charging stations to control transfer of reactive and/or active power from the charging stations to the power distribution grid. The control signals are generated based at least in part on a load cycle profile of one or more electric machines electrically coupled to the power distribution grid.

## Claims

### Claim 1

A system comprising:
a control unit comprising one or more processors and a communication interface operably coupled to the processor, wherein the communication interface is configured to communicate with one or more charging stations electrically coupled to receive electrical power from a power distribution grid and configured to selectively charge one or more energy storage devices connected to the one or more charging stations,
wherein the one or more processors of the control unit are configured to generate first control signals for communication by the communication interface to the one or more charging stations to control transfer of at least one of reactive power or active power from the one or more charging stations to the power distribution grid based at least in part on a load cycle profile of one or more electric machines electrically coupled to the power distribution grid.

### Claim 2 (depends on 1)

The system of claim 1, wherein the load cycle profile includes information of one or more times when the one or more electric machines are scheduled to draw electrical power from the power distribution grid and one or more magnitudes of the electrical power to be drawn by the one or more electric machines from the power distribution grid at the one or more times.

### Claim 3 (depends on 1)

The system of claim 1, wherein the one or more electric machines are discrete electric machines other than charging stations.

### Claim 4 (depends on 1)

The system of claim 1, wherein the one or more electric machines are discrete electric machines other than charging stations, and the load cycle profile includes information of one or more times when the one or more electric machines are scheduled to draw electrical power from the power distribution grid and one or more magnitudes of the electrical power to be drawn by the one or more electric machines from the power distribution grid at the one or more times.

### Claim 5 (depends on 1)

The system of claim 1, wherein:
the load cycle profile includes: first information of one or more first times when the one or more electric machines are scheduled to draw electrical power from the power distribution grid and one or more magnitudes of the electrical power to be drawn by the one or more electric machines from the power distribution grid at the one or more first times; and second information of one or more second times when the one or more electric machines are scheduled to transfer electrical power back to the power distribution grid and one or more magnitudes of the electrical power to be transferred back to the power distribution grid by the one or more electric machines at the one or more second times;
the one or more processors of the control unit are configured to generate the first control signals based at least in part of the first information; and
the one or more processors are further configured to generate second control signals, based at least in part on the second information, for communication by the communication interface to the one or more charging stations to control the one or more charging stations to charge the one or more energy storage devices with electrical power drawn from the power distribution grid.

### Claim 6 (depends on 5)

The system of claim 5, wherein the one or more electric machines are discrete electric machines other than charging stations.

### Claim 7 (depends on 6)

The system of claim 6, wherein each of the one or more magnitudes of the electrical power to be drawn by the one or more electric machines from the power distribution grid at the one or more first times and each of the one or more magnitudes of the electrical power to be transferred back to the power distribution grid by the one or more electric machines at the one or more second times is at least one megawatt.

### Claim 8 (depends on 7)

The system of claim 7, wherein the system is disposed in a mine, the one or more energy storage devices are configured for deployment in electric mine vehicles for providing on-board electrical power at least for vehicle propulsion, and the electric machines comprise mining equipment other than the electric mine vehicles.

### Claim 9 (depends on 1)

The system of claim 1, wherein the one or more processors of the control unit are configured to:
conduct a real-time load assessment of the power distribution grid based on at least one of a voltage measurement, a current measurement, a power measurement, or a frequency measurement of electrical power associated with the power distribution grid; and
generate the first control signals further based on the load assessment.

### Claim 10 (depends on 9)

The system of claim 9, wherein the one or more processors of the control unit are configured to:
determine a capacity of the one or more charging stations to transfer the at least one of reactive power or active power to the power distribution grid, based at least in part on one or more charging profiles of the energy storage devices; and
generate the first control signals further based on the capacity that is determined.

### Claim 11 (depends on 1)

The system of claim 1, wherein the control unit is housed within one of the one or more charging stations.

### Claim 12 (depends on 1)

The system of claim 1, wherein:
the one or more charging stations comprises a plurality of charging stations; and
the control unit is a centralized control unit located remote from the charging stations.

### Claim 13 (depends on 12)

The system of claim 12, wherein each charging station includes a respective local control unit configured to receive the first control signals from the centralized control unit and to transfer to the power distribution grid the at least one of reactive power or active power based at least in part on the first control signals.

### Claim 14

A method comprising:
with one or more processors of a control unit, generating first control signals for controlling transfer of at least one of reactive power or active power from one or more charging stations to a power distribution grid that is electrically coupled to the one or more charging stations, the one or more charging stations configured to selectively charge one or more energy storage devices connected to the one or more charging stations, wherein the first control signals are generated based at least in part on a load cycle profile of one or more electric machines electrically coupled to the power distribution grid; and
with a communication interface of the control unit that is operably coupled to the one or more processors, communicating the first control signals to the one or more charging stations.

### Claim 15 (depends on 14)

The method of claim 14, wherein the load cycle profile includes information of one or more times when the one or more electric machines are scheduled to draw electrical power from the power distribution grid and one or more magnitudes of the electrical power to be drawn by the one or more electric machines from the power distribution grid at the one or more times.

### Claim 16 (depends on 14)

The method of claim 14, wherein the one or more electric machines are discrete electric machines other than charging stations.

### Claim 17 (depends on 14)

The method of claim 14, wherein the load cycle profile includes information of one or more times when the one or more electric machines are scheduled to draw electrical power from the power distribution grid and one or more magnitudes of the electrical power to be drawn by the one or more electric machines from the power distribution grid at the one or more times, and wherein the one or more electric machines are discrete electric machines other than charging stations.

### Claim 18 (depends on 17)

The method of claim 17, wherein each of the one or more magnitudes of the electrical power to be drawn by the one or more electric machines from the power distribution grid at the one or more times is at least one megawatt.

### Claim 19 (depends on 14)

The method of claim 14, wherein:
the load cycle profile includes: first information of one or more first times when the one or more electric machines are scheduled to draw electrical power from the power distribution grid and one or more magnitudes of the electrical power to be drawn by the one or more electric machines from the power distribution grid at the one or more first times; and second information of one or more second times when the one or more electric machines are scheduled to transfer electrical power back to the power distribution grid and one or more magnitudes of the electrical power to be transferred back to the power distribution grid by the one or more electric machines at the one or more second times;
the first control signals are generated based at least in part on the first information; and
the method further comprises:
with the one or more processors, generating second control signals based at least in part on the second information to control the one or more charging stations to charge the one or more energy storage devices with electrical power drawn from the power distribution grid; and
with the communication interface, communicating the second control signals to the one or more charging stations.

### Claim 20 (depends on 14)

The method of claim 14, wherein the load cycle profile includes information of how much power the one or more electric machines are expected to draw from the power distribution grid when the one or more electric machines are operational.