# US 2019/0317123 A1 · Integrated cellular tower monitoring system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0317123 A1
- Document ID: US20190317123A1
- Status: Published application
- Kind: A1
- Application number: 14/157,775
- Filed: 2014-01-17
- Published: 2019-10-17
- Earliest claimed: 2014-01-17
- Inventors: Terrance O'Brien Woodbridge
- Web page: https://patentgrep.com/patent/US20190317123A1

## CPC

- G01P 15/18: in two or more dimensions
- G08B 19/00: Alarms responsive to two or more different undesired or abnormal conditions, e.g. burglary and fire, abnormal temperature and abnormal rate of flow
- G06F 21/87: by means of encapsulation, e.g. for integrated circuits
- G08B 25/08: using communication transmission lines {(G08B13/19658, G08B21/0286, G08B25/016 take precedence)}
- H04B 17/104: {of other parameters, e.g. DC offset, delay or propagation times}
- H04B 17/16: Test equipment located at the transmitter
- H04B 17/18: Monitoring during normal operation
- G01P: MEASURING LINEAR OR ANGULAR SPEED, ACCELERATION, DECELERATION, OR SHOCK; INDICATING PRESENCE, ABSENCE, OR DIRECTION, OF MOVEMENT (measuring or recording blood flow A61B5/02, A61B8/06; monitoring speed or deceleration of electrically-propelled vehicles B60L3/00; vehicle lighting systems adapted to indicate speed B60Q1/54; determining position or course in navigation, measuring ground distance in geodesy or surveying G01C; combined measuring devices for measuring two or more variables of movement G01C23/00; measuring velocity of sound G01H; measuring velocity of light G01J7/00; measuring direction or velocity of solid objects by reception or emission of radiowaves or other waves and based on propagation effects, e.g. Doppler effect, propagation time, direction of propagation, G01S; measuring speed of nuclear radiation G01T; measuring acceleration of gravity G01V; {measuring or recording the speed of trains B61L23/00; speed indicators incorporated in motor vehicles B60K35/00; measuring frequency or phase G01R; traffic control G08G})
- G08B: SIGNALLING SYSTEMS, e.g. PERSONAL CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H04B: TRANSMISSION

## Abstract

A dynamic and expandable communication tower monitoring unit includes a set of programmable modules for returning information about the electrical, environmental, structural, and communications status of a cellular tower, its components and ancillary service and carrier equipment. The monitoring unit processes programmable analog, digital, thermistor, voltage and trending inputs. Key features include an accelerometer-based structural sensor (“twist and sway”), a grounding integrity system for multiple tenants, and a second secure-feedback module (“watchdog circuit”) that provides an extra layer of protection in case of the system-wide electrical and/or communications failure. An operating system provides a series of control screens that allow for remote and local control of input and output variables for each tower.

## Claims

### Claim 1

A system for monitoring a communications tower including:
a) an enclosure for said monitoring system, said enclosure including a tower monitoring unit;
b) a power supply connected to said tower monitoring unit;
c) a set of analog inputs operatively connected to said tower monitoring unit;
d) a set of digital inputs operatively connected to said tower monitoring unit;
e) a module for connecting an external network to said tower monitoring unit;
f) said module for providing said set of analog inputs with at least one transponder, said transponder providing information regarding external environmental conditions to at least one dry or one digital input.

### Claim 2 (depends on 1)

The system as recited in claim 1, further including a traffic monitoring module connected to one of said set of digital inputs.

### Claim 3 (depends on 1)

The system as recited in claim 1, further including an equipment tamper switch operatively connected to one of said digital or said analog inputs.

### Claim 4 (depends on 1)

The system as recited in claim 1, further including a backup battery monitoring system.

### Claim 5 (depends on 1)

The system as recited in claim 1, further including an on-site camera operatively connected to one of said dry or digital inputs.

### Claim 6 (depends on 1)

The system as recited in claim 1, wherein said tower monitoring unit comprises a programmed microcontroller.

### Claim 7 (depends on 1)

The system as recited in claim 1, further including a module for detecting the twist and sway in the tower.

### Claim 8 (depends on 7)

The system as recited in claim 7, wherein said twist and sway detecting module including a detector with a set of accelerometers.

### Claim 9 (depends on 8)

The system as recited in claim 8, wherein said twist and sway detecting module is operatively connected to said system by a series of digital inputs.

### Claim 10 (depends on 1)

The system as recited in claim 1, further including at least one thermistor input and at least one voltage input.

### Claim 11 (depends on 8)

The system as recited in claim 8, wherein said twist and sway detecting module provides raw data to said tower monitoring unit.

### Claim 12 (depends on 8)

The system as recited in claim 8, wherein said accelerometers are placed an optimal distance up the tower.

### Claim 13 (depends on 1)

The system as recited in claim 1, wherein said power supply is 24 volts or less.

### Claim 14 (depends on 1)

The system as recited in claim 1, further including a module for controlling and monitoring the tower lights.

### Claim 15 (depends on 1)

The system as recited in claim 1, further including an air conditioning monitoring module.

### Claim 16 (depends on 1)

The system as recited in claim 1, further including a ground monitoring unit.

### Claim 17 (depends on 16)

The system as recited in claim 16, wherein said ground monitoring unit includes a reference ground.

### Claim 18 (depends on 17)

The system as recited in claim 17, wherein said ground monitoring unit is coupled to a set of analog inputs.

### Claim 19 (depends on 18)

The system as recited in claim 18, wherein said ground monitoring unit includes a set of ground monitoring units for individual carriers.

### Claim 20 (depends on 16)

The system as recited in claim 16, further including a grounding alarm system.

### Claim 21 (depends on 1)

The system as recited in claim 1 further including a generator monitoring module.

### Claim 22

A tower monitoring system comprising:
a) an enclosure;
b) a power source;
c) a set of analog inputs;
d) a set of digital inputs;
e) a set of thermistor inputs
f) a set of voltage inputs;
g) a microcontroller connected to said dry inputs, said digital inputs and said environmental inputs;
h) a driver circuit for operating a series of relays;
wherein said microcontroller executes a set of instructions on a central processing unit to provide said data from said digital and analog inputs to an operating platform program, wherein said platform program executes instructions that provide said data from said digital and dry inputs to a graphic user interface.

### Claim 23

A method for setting up a cellular tower monitoring system at a site, said system including a controller contained with an enclosure, said controller including a controller with a CPU connected to a data center via a network, including the steps of:
preloading information at a data center;
mounting and powering a site enclosure;
calling into data center and bringing said controller online;
confirming that the controller is online and ready for testing; and
running site testing, including the following tests:
i. testing a monitoring circuit;
ii. testing contact points;
iii. running through all contact points;
iv. running through all intrusion points; and
v. testing FAA lighting.

### Claim 24 (depends on 23)

The method as recited in claim 23, further including tests on a generator.

### Claim 25 (depends on 24)

The method as recited in claim 24, further including the following tests:
a. AC fail test;
b. remote generator start test;
c. fuel level test;
d. backhaul failure;
e. T1/T3 failure; and
f. Dark fiber test.