# US 2019/0316978 A1 · System and method for monitoring fastener tension

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0316978 A1
- Document ID: US20190316978A1
- Status: Published application
- Kind: A1
- Application number: 15/951,320
- Filed: 2018-04-12
- Published: 2019-10-17
- Earliest claimed: 2018-04-12
- Assignees: General Electric Company
- Applicants: General Electric Company
- Inventors: Miguel Angel Escapita Flores; Alejandro Torres Bahena
- Web page: https://patentgrep.com/patent/US20190316978A1

## CPC

- G01L 5/243: {using washers}
- G01L 1/16: using properties of piezoelectric devices
- G01L: MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE (weighing G01G)

## Abstract

A system for monitoring fastener tension includes a fastener clamping a first member to a second member. A load monitoring sensor is interposed between a nut and the second member, and outputs an electrical signal upon changes in fastener tension. A signal collection hub is connected to the load monitoring sensor so that the electrical signal is transmitted from the load monitoring sensor to the signal collection hub. The signal collection hub collects and converts electrical signals into a data package. A processor transforms the data package into a digital representation of mechanical data. The mechanical data is compared to a predetermined mechanical limit value by the processor. If a value of the mechanical data is equal to or less than the predetermined mechanical limit value then an indication is generated to indicate that the fastener should be serviced.

## Claims

### Claim 1

A system for monitoring fastener tension, the system comprising:
a fastener clamping a first member to a second member, the fastener including a nut proximate to the second member and a washer interposed between the nut and the second member;
a load monitoring sensor interposed between the nut and the second member, the load monitoring sensor outputting an electrical signal upon changes in fastener tension;
a signal collection hub operatively connected to the load monitoring sensor so that the electrical signal is transmitted from the load monitoring sensor to the signal collection hub, the signal collection hub collects and converts one or more electrical signals into a data package; and
a processor operatively connected to the signal collection hub so that the data package is transmitted from the signal collection hub to the processor, the processor transforms the data package into a digital representation of mechanical data, the mechanical data is compared to a predetermined mechanical limit value by the processor, and if a value of the mechanical data is equal to or less than the predetermined mechanical limit value then an indication is generated to indicate that the fastener should be serviced.

### Claim 2 (depends on 1)

The system of claim 1, wherein the first member and the second member are wind turbine parts or wind turbine foundation parts.

### Claim 3 (depends on 1)

The system of claim 1, wherein the load monitoring sensor is a piezoelectric sensor.

### Claim 4 (depends on 1)

The system of claim 1, wherein the load monitoring sensor is operatively connected to the signal collection hub via a wired link or a wireless link, or the signal collection hub is operatively connected to the processor via a wired link or a wireless link.

### Claim 5 (depends on 1)

The system of claim 1, wherein each of a plurality of fasteners has a load monitoring sensor.

### Claim 6 (depends on 1)

The system of claim 1, wherein the mechanical data is one or more tension values, and the predetermined mechanical limit value is a tension value at or below which the fastener should be re-tensioned, re-torqued or replaced.

### Claim 7

A method for monitoring fastener tension, a fastener clamps a first member to a second member, the fastener includes a nut proximate to the second member and a washer interposed between the nut and the second member, the method comprising:
obtaining one or more signals from one or more load monitoring sensors, each of the load monitoring sensors are interposed between the nut and the second member, each of the load monitoring sensors outputs a signal upon changes in fastener tension;
transmitting the one or more signals to a signal collection hub;
collecting the one or more signals in the signal collection hub;
converting the one or more signals into a data package;
transmitting the data package to a processor;
converting the one or more signals with the processor into mechanical data values;
comparing the mechanical data values to a predetermined mechanical limit value;
generating an indication if a value of the mechanical data values is equal to or less than the predetermined mechanical limit value, the indication is a notification that the fastener should be serviced.

### Claim 8 (depends on 7)

The method of claim 7, wherein the mechanical data is one or more tension values, and the predetermined mechanical limit value is a tension value at or below which the fastener should be re-tensioned, re-torqued or replaced.

### Claim 9 (depends on 8)

The method of claim 8, wherein the first member and the second member are wind turbine parts or wind turbine foundation parts.

### Claim 10 (depends on 8)

The method of claim 8, wherein each of the one or more load monitoring sensors is a piezoelectric sensor.

### Claim 11 (depends on 8)

The method of claim 8, wherein the one or more load monitoring sensors transmit the one or more signals to the signal collection hub via a wired link or a wireless link.

### Claim 12 (depends on 8)

The method of claim 8, wherein the signal collection hub transmits the data package to the processor via a wired link or a wireless link.

### Claim 13

A method for monitoring fastener tension in a wind turbine, a fastener clamps a bolted joint of the wind turbine, the method comprising:
obtaining one or more signals from one or more load monitoring sensors, each of the load monitoring sensors are placed around a portion of the fastener, each of the load monitoring sensors outputs a signal upon changes in fastener tension;
transmitting the one or more signals to a signal collection hub;
converting the one or more signals into a data package;
transmitting the data package to a processor;
converting the one or more signals with the processor into mechanical data values;
comparing the mechanical data values to a predetermined mechanical limit value;
generating an indication if a value of the mechanical data values is equal to or less than the predetermined mechanical limit value, the indication is a notification that the fastener should be serviced.

### Claim 14 (depends on 13)

The method of claim 13, wherein the signal collection hub collects the one or more signals and subsequently converts the one or more signals into the data package.

### Claim 15 (depends on 13)

The method of claim 13, wherein the mechanical data is one or more tension values, and the predetermined mechanical limit value is a tension value at or below which the fastener should be re-tensioned, re-torqued or replaced.

### Claim 16 (depends on 13)

The method of claim 13, wherein the bolted joint fastens a tower of the wind turbine to a supporting surface.

### Claim 17 (depends on 13)

The method of claim 13, wherein the bolted joint fastens joints in a tower, tower section, hub, rotor or nacelle of the wind turbine.

### Claim 18 (depends on 13)

The method of claim 13, wherein each of the one or more load monitoring sensors is a piezoelectric sensor.

### Claim 19 (depends on 13)

The method of claim 13, wherein the one or more load monitoring sensors transmit the one or more signals to the signal collection hub via a wired link or a wireless link, or the signal collection hub transmits the data package to the processor via a wired link or a wireless link.

### Claim 20 (depends on 13)

The method of claim 13, wherein multiple fasteners are monitored and the multiple fasteners are separated into groups, and each of the groups have a different predetermined mechanical limit value.
