# US 2019/0316796 A1 · Heat Pump and Air Conditioning Grading Systems and Methods

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0316796 A1
- Document ID: US20190316796A1
- Status: Published application
- Kind: A1
- Application number: 16/453,384
- Filed: 2019-06-26
- Published: 2019-10-17
- Earliest claimed: 2014-05-07
- Assignees: Emerson Climate Technologies, Inc.
- Applicants: Emerson Climate Technologies, Inc.
- Inventors: Fadi Mohammad ALSALEEM
- Web page: https://patentgrep.com/patent/US20190316796A1

## CPC

- F24F 11/38: Failure diagnosis
- F24F 3/044: Systems in which all treatment is given in the central station, i.e. all-air systems
- F24F 11/30: for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F 11/64: using pre-stored data
- G01K 13/00: Thermometers specially adapted for specific purposes
- G01K 17/08: based upon measurement of temperature difference {or of a temperature}
- G01M 99/005: {Testing of complete machines, e.g. washing-machines or mobile phones (testing of machine parts G01M13/00; testing of electric apparatus or components G01R31/50)}
- G01R 21/00: Arrangements for measuring electric power or power factor (G01R7/12 takes precedence)
- F24F 11/32: Responding to malfunctions or emergencies
- F24F 11/52: Indication arrangements, e.g. displays
- F24F 2110/00: Control inputs relating to air properties
- F24F 2110/10: Temperature
- F24F 2130/00: Control inputs relating to environmental factors not covered by group F24F2110/00
- F24F 2130/10: Weather information or forecasts
- F24F 2140/50: Load
- F24F 2140/60: Energy consumption
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)
- G01K: MEASURING TEMPERATURE; MEASURING QUANTITY OF HEAT; THERMALLY-SENSITIVE ELEMENTS NOT OTHERWISE PROVIDED FOR (radiation pyrometry G01J5/00)
- G01M: TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)

## Abstract

An expectation module determines an expected average power consumption of a heat pump for a predetermined period as a function of indoor and outdoor temperatures of the building during the predetermined period. A difference module determines a power difference between an average power consumption of the heat pump during the predetermined period and the expected average power consumption of the heat pump for the predetermined period. A grade determination module determines a grade of the heat pump for the predetermined period based on the power difference of the predetermined period. A reporting module generates a displayable report including the grade of the heat pump for the predetermined period.

## Claims

### Claim 1

A grading system, comprising:
a difference module that determines a power difference between an actual average power consumption of a heat pump of a building during a predetermined period and an expected average power consumption of the heat pump for the predetermined period;
a grade determination module that determines a grade of the heat pump for the predetermined period based on the power difference, a split temperature of the heat pump during the predetermined period, a liquid temperature of the heat pump during the predetermined period, a return air temperature of the heat pump during the predetermined period, and a discharge temperature of the heat pump during the predetermined period;
a capacity module that determines a capacity score for the heat pump during the predetermined period based on the power difference, the split temperature of the heat pump during the predetermined period, the liquid temperature of the heat pump during the predetermined period, the return air temperature of the heat pump during the predetermined period, and the discharge temperature of the heat pump during the predetermined period;
an airflow module that determines an airflow score for the heat pump during the predetermined period based on the power difference, the split temperature during the predetermined period, the liquid temperature during the predetermined period, the return air temperature during the predetermined period, and the discharge temperature during the predetermined period,
wherein the grade determination module determines the grade of the heat pump for the predetermined period as a function of the power difference, the capacity score, and the airflow score; and
a reporting module that generates a displayable report including the grade of the heat pump for the predetermined period.

### Claim 2 (depends on 1)

The grading system of claim 1 further comprising:
a reference module that determines at least one reference temperature for the heat pump during the predetermined period based on an outdoor ambient temperature during the predetermined period,
wherein the capacity module determines the capacity score further based on the at least one reference temperature for the heat pump during the predetermined period.

### Claim 3 (depends on 2)

The grading system of claim 2 wherein the capacity module determines the capacity score for the heat pump during the predetermined period based on:
a first difference between the liquid temperature and the return air temperature; and
a second difference between the discharge temperature and the return air temperature.

### Claim 4 (depends on 3)

The grading system of claim 3 wherein:
the reference module determines first, second, and third reference temperatures for the heat pump during the predetermined period based on the outdoor ambient temperature during the predetermined period,
wherein the capacity module determines the capacity score for the heat pump during the predetermined period as a function of a third difference between (a) the split temperature and (b) the first reference temperature, a fourth difference between (a) the first difference and (b) the second reference temperature, and a fifth difference between (a) the second difference and (b) the third reference temperature.

### Claim 5 (depends on 1)

The grading system of claim 1 further comprising:
a reference module that determines at least one reference temperature for the heat pump during the predetermined period based on an outdoor ambient temperature during the predetermined period,
wherein the airflow module determines the airflow score further based on the at least one reference temperature for the heat pump during the predetermined period.

### Claim 6 (depends on 5)

The grading system of claim 5 wherein the airflow module determines the airflow score for the heat pump during the predetermined period based on:
a first difference between the liquid temperature and the return air temperature; and
a second difference between the discharge temperature and the return air temperature.

### Claim 7 (depends on 6)

The grading system of claim 6 wherein:
the reference module determines first, second, and third reference temperatures for the heat pump during the predetermined period based on the outdoor ambient temperature during the predetermined period; and
the airflow module determines the airflow score for the heat pump during the predetermined period as a function of a third difference between (a) the split temperature and (b) the first reference temperature, a fourth difference between (a) the first difference and (b) the second reference temperature, and a fifth difference between (a) the second difference and (b) the third reference temperature.

### Claim 8 (depends on 1)

The grading system of claim 1 wherein the grade determination module sets the grade of the heat pump for the predetermined period based on 100 minus the power difference minus the capacity score minus the airflow score.

### Claim 9 (depends on 1)

The grading system of claim 1 further comprising an expectation module that determines the expected average power consumption of the heat pump of the building for the predetermined period as a function of an outdoor temperature of the building during the predetermined period.

### Claim 10

A grading method, comprising:
determining a power difference between an actual average power consumption of a heat pump of a building during a predetermined period and an expected average power consumption of the heat pump for the predetermined period;
determining a grade of the heat pump for the predetermined period based on the power difference, a split temperature of the heat pump during the predetermined period, a liquid temperature of the heat pump during the predetermined period, a return air temperature of the heat pump during the predetermined period, and a discharge temperature of the heat pump during the predetermined period;
determining a capacity score for the heat pump during the predetermined period based on the power difference, the split temperature of the heat pump during the predetermined period, the liquid temperature of the heat pump during the predetermined period, the return air temperature of the heat pump during the predetermined period, and the discharge temperature of the heat pump during the predetermined period;
determining an airflow score for the heat pump during the predetermined period based on the power difference, the split temperature during the predetermined period, the liquid temperature during the predetermined period, the return air temperature during the predetermined period, and the discharge temperature during the predetermined period,
wherein determining the grade of the heat pump for the predetermined period comprises determining the grade of the heat pump for the predetermined period as a function of the power difference, the capacity score, and the airflow score; and generating a displayable report including the grade of the heat pump for the predetermined period.

### Claim 11 (depends on 10)

The grading method of claim 10 further comprising:
determining at least one reference temperature for the heat pump during the predetermined period based on an outdoor ambient temperature during the predetermined period; and
determining the capacity score further based on the at least one reference temperature for the heat pump during the predetermined period.

### Claim 12 (depends on 11)

The grading method of claim 11 wherein determining the capacity score for the heat pump during the predetermined period comprises determining the capacity score for the heat pump during the predetermined period based on:
a first difference between the liquid temperature and the return air temperature; and
a second difference between the discharge temperature and the return air temperature.

### Claim 13 (depends on 12)

The grading method of claim 12 wherein:
determining at least one reference temperature includes determining first, second, and third reference temperatures for the heat pump during the predetermined period based on the outdoor ambient temperature during the predetermined period; and
determining the capacity score for the heat pump during the predetermined period comprises determining the capacity score for the heat pump during the predetermined period as a function of a third difference between (a) the split temperature and (b) the first reference temperature, a fourth difference between (a) the first difference and (b) the second reference temperature, and a fifth difference between (a) the second difference and (b) the third reference temperature.

### Claim 14 (depends on 10)

The grading method of claim 10 further comprising:
determining at least one reference temperature for the heat pump during the predetermined period based on an outdoor ambient temperature during the predetermined period; and
determining the airflow score further based on the at least one reference temperature for the heat pump during the predetermined period.

### Claim 15 (depends on 14)

The grading method of claim 14 wherein determining the airflow score for the heat pump during the predetermined period comprises determining the airflow score for the heat pump during the predetermined period based on:
a first difference between the liquid temperature and the return air temperature; and
a second difference between the discharge temperature and the return air temperature.

### Claim 16 (depends on 15)

The grading method of claim 15 wherein:
determining at least one reference temperature comprises determining first, second, and third reference temperatures for the heat pump during the predetermined period based on the outdoor ambient temperature during the predetermined period; and
determining the airflow score for the heat pump during the predetermined period comprises determining the airflow score for the heat pump during the predetermined period as a function of a third difference between (a) the split temperature and (b) the first reference temperature, a fourth difference between (a) the first difference and (b) the second reference temperature, and a fifth difference between (a) the second difference and (b) the third reference temperature.

### Claim 17 (depends on 10)

The grading method of claim 10 wherein determining the grade of the heat pump comprises setting the grade of the heat pump for the predetermined period based on 100 minus the power difference minus the capacity score minus the airflow score.

### Claim 18 (depends on 10)

The grading method of claim 10 further comprising determining the expected average power consumption of the heat pump of the building for the predetermined period as a function of an outdoor temperature of the building during the predetermined period.
