# US 2019/0316457 A1 · Systems and Methods for Optimizing Rate of Penetration in Drilling Operations

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0316457 A1
- Document ID: US20190316457A1
- Status: Published application
- Kind: A1
- Application number: 15/954,758
- Filed: 2018-04-17
- Published: 2019-10-17
- Earliest claimed: 2018-04-17
- Assignees: Saudi Arabian Oil Company
- Applicants: Saudi Arabian Oil Company
- Inventors: Mohammed Murif Al-Rubaii; Ossama R. Sehsah; Eno Itam Omini
- Web page: https://patentgrep.com/patent/US20190316457A1

## CPC

- E21B 44/00: Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B 44/06: in response to the flow or pressure of the motive fluid of the drive
- E21B 21/08: Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure (valve arrangements therefor E21B21/10)
- E21B 45/00: Measuring the drilling time or rate of penetration
- E21B 47/09: Locating or determining the position of objects in boreholes or wells {, e.g. the position of an extending arm}; Identifying the free or blocked portions of pipes
- E21B 49/005: {Testing the nature of borehole walls or the formation by using drilling mud or cutting data}
- E21B 3/04: Rotary tables
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

Systems and methods for predicting an efficient hole cleaning in vertical, deviated, and horizontal holes by developing a hole cleaning model that combines hole cleaning and drilling rate to optimize performance. Specifically by ensuring optimum mud rheology values that have an influence on drilling mud from the aspects of ECD, cuttings transport, shear thinning, and thixotropic, and developing an effective hole cleaning model by utilizing carrying capacity index (CCI) and cutting concentration in annulus (CCA).

## Claims

### Claim 1

A method of drilling a borehole with a drill tool of a drilling system that uses drilling mud to transport cuttings of a formation to surface, the method comprising:
receiving a plurality of input parameters of a drilling operation conducted with the drilling system, the input parameters at least including a cuttings parameter related to the cuttings produced in the drilling operation;
determining a current concentration of the cuttings in the drilling operation at least near the drill tool based on the obtained parameters;
determining a desired rate of penetration for the drilling operation based on the determined concentration; and
altering a current rate of penetration based on the determined rate.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
determining a carrying capacity index based on the plurality of input parameters;
determining a desired rate of penetration for the drilling operation based on the determined cutting concentration in annulus; and
altering a current rate of penetration based on the determined rate.

### Claim 3 (depends on 1)

The method of claim 1, wherein obtaining the input parameters comprises obtaining one or more of: a weight of the drilling mud, flow rate of the drilling mud, the current rate of penetration of the drilling system, a depth of the borehole, a depth of the drill tool of the drilling system, a density of the cuttings, a diameter of the cuttings, an eccentricity factor of the borehole, and a porosity of the formation.

### Claim 4 (depends on 1)

The method claim 1, wherein determining the current concentration of the cuttings in the drilling operation at least near the drill tool based on the current parameters comprises using a volumetric flow rate of the drilling mud, a volumetric flow rate of the cuttings, and a relationship between slip velocity and axial velocity in the determination.

### Claim 5 (depends on 4)

The method of claim 4, wherein determining the current concentration of the cuttings in the drilling operation at least near the drill tool based on the current parameters further comprises using in the determination one or more of:
an area of an annulus at least near the drill tool, an eccentricity of the borehole, a surface area of the drill tool of the drilling system, and a porosity of the formation.

### Claim 6 (depends on 1)

The method of claim 1, wherein the input parameters further comprise hole size, mud type, footage, hours spent for drilling the footage, mud density in pounds per cubic feet (pcf) and pounds per gallon (ppg), funnel viscosity, plastic viscosity (PV) in centipoise (cp), yield point (YP) in lb/100 sqft, weight of blend (WOB) in Klb, revolutions per minute (RPM), stand pipe pressure in psi, torque in lbf·ft, total flow area of the bit in square inches, initial gel and final gel types, and flow rate of the mud pump.

### Claim 7 (depends on 6)

The method of claim 6, further comprising:
calculating rate of penetration (ROP), consistency index (K), fluid behavior index (n), Φ600 and Φ300, apparent and effective viscosities, cutting diameter (i.e. ROP/RPM), annular velocity (Vann), critical velocity (Vc), cutting rise velocity (Vcr), cutting slip velocity (Vs), consistency index to the power n (Kn), velocity of nozzles, pressure drop at the drilling bit, hydraulic horsepower (HHP), hydraulic horse power per square inch (HSI), jet impact force (Fj), transport ratio (TR), Vcr/Vann ratio and dc/OH ratio, PV/YP, YP/PV, Gi/Gf, Gf/Gi, K(1-(dc/OH){circumflex over ( )}n), modified carrying capacity index (MCCI), and drilling specific energy (DSE) based on the input parameters.

### Claim 8 (depends on 7)

The method of claim 7, further comprising:
determining the transport ratio is less than a predetermined threshold value;
altering the GPM in order to increase the current concentration of the cuttings to above 5%.

### Claim 9 (depends on 7)

The method of claim 7, further comprising:
determining that YP/PV is less than a predetermined threshold value;
altering the YP/PV in order to reach a YP/PV value of at least 3.

### Claim 10 (depends on 9)

The method of claim 9, further comprising:
determining that GPM is less than a predetermined threshold value;
altering the GPM in order to reach a GPM value of at least 1200.

### Claim 11 (depends on 1)

A program storage device having program instructions stored thereon for causing a programmable control device to perform a method of drilling a borehole according to claim 1.

### Claim 12

A drilling system for drilling a borehole with a drill tool using drilling mud to transport cuttings of a formation to surface, the system comprising:
storage storing historical information;
an interface obtaining a plurality of parameters of a drilling operation conducted with the drilling system, the input parameters at least including a cuttings parameter related to the cuttings produced in the drilling operation; and
a processing unit in communication with the storage and the interface and configured to:
receive a plurality of input parameters of a drilling operation conducted with the drilling system, the input parameters at least including a cuttings parameter related to the cuttings produced in the drilling operation;
determine a current concentration of the cuttings in the drilling operation at least near the drill tool based on the obtained parameters;
determine a desired rate of penetration for the drilling operation based on the determined concentration; and
alter a current rate of penetration based on the determined rate.

### Claim 13 (depends on 12)

The system of claim 12, wherein the processor is further configured to:
determine a carrying capacity index based on the plurality of input parameters;
determine a desired rate of penetration for the drilling operation based on the determined cutting concentration in annulus; and
alter a current rate of penetration based on the determined rate.

### Claim 14 (depends on 12)

The system of claim 12, wherein obtaining the input parameters comprises obtaining one or more of: a weight of the drilling mud, flow rate of the drilling mud, the current rate of penetration of the drilling system, a depth of the borehole, a depth of the drill tool of the drilling system, a density of the cuttings, a diameter of the cuttings, an eccentricity factor of the borehole, and a porosity of the formation.

### Claim 15 (depends on 12)

The system of claim 12, wherein determining the current concentration of the cuttings in the drilling operation at least near the drill tool based on the current parameters comprises using a volumetric flow rate of the drilling mud, a volumetric flow rate of the cuttings, and a relationship between slip velocity and axial velocity in the determination.

### Claim 16 (depends on 15)

The system of claim 15, wherein determining the current concentration of the cuttings in the drilling operation at least near the drill tool based on the current parameters further comprises using in the determination one or more of:
an area of an annulus at least near the drill tool, an eccentricity of the borehole, a surface area of the drill tool of the drilling system, and a porosity of the formation.

### Claim 17 (depends on 12)

The system of claim 12, wherein the input parameters further comprise hole size, mud type, footage, hours spent for drilling the footage, mud density in pounds per cubic feet (pcf) and pounds per gallon (ppg), funnel viscosity, plastic viscosity (PV) in centipoise (cp), yield point (YP) in lb/100 sqft, weight of blend (WOB) in Klb, revolutions per minute (RPM), stand pipe pressure in psi, torque in lbf·ft, total flow area of the bit in square inches, initial gel and final gel types, and flow rate of the mud pump.

### Claim 18 (depends on 17)

The system of claim 17, wherein the processor is further configured to:
calculating rate of penetration (ROP), consistency index (K), fluid behavior index (n), Φ600 and Φ300, apparent and effective viscosities, cutting diameter (i.e. ROP/RPM), annular velocity (Vann), critical velocity (Vc), cutting rise velocity (Vcr), cutting slip velocity (Vs), consistency index to the power n (Kn), velocity of nozzles, pressure drop at the drilling bit, hydraulic horsepower (HHP), hydraulic horse power per square inch (HSI), jet impact force (Fj), transport ratio (TR), Vcr/Vann ratio and dc/OH ratio, PV/YP, YP/PV, Gi/Gf, Gf/Gi, K(1-(dc/OH){circumflex over ( )}n), modified carrying capacity index (MCCI), and drilling specific energy (DSE) based on the input parameters.

### Claim 19 (depends on 17)

The system of claim 17, wherein the processor is further configured to:
determine the transport ratio is less than a predetermined threshold value;
alter the GPM in order to increase the current concentration of the cuttings to above 5%.

### Claim 20 (depends on 17)

The system of claim 17, wherein the processor is further configured to:
determine that YP/PV is less than a predetermined threshold value;
alter the YP/PV in order to reach a YP/PV value of at least 3.
