Thermostat with predictive variable air volume (vav) performance features
AssigneeJohnson Controls Technology Company
InventorsJustin J. Ploegert, Joseph R. Ribbich
Life of this patent
Estimating the term…
Loading patent…
AssigneeJohnson Controls Technology Company
InventorsJustin J. Ploegert, Joseph R. Ribbich
Estimating the term…
A thermostat for includes a processing circuit configured to operate the building equipment to control an environmental condition within a building including a first zone and second zones and receive a first time-series data set for a parameter of a first piece of the building equipment associated with the first zone. The processing circuit is configured to receive second time-series data sets for the parameter of second pieces of building equipment associated with the second zones. The processing circuit is configured to perform a comparison including comparing the first time-series data set with the second time-series data sets and generate recommendations for improving the performance of the first piece of building equipment based on the comparison of the first time-series data set with the second time-series data sets.
A thermostat for predicting a performance of building equipment and controlling the building equipment, the thermostat comprising a processing circuit configured to:
A method for predicting a performance of building equipment and controlling the building equipment via a thermostat, the method comprising:
A building controller for predicting a performance of building equipment and controlling the building equipment, the controller comprising a processing circuit configured to:
Dependencies are inferred from the claim text.