# US 2019/0293824 A1 · Automated Well Time Estimation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0293824 A1
- Document ID: US20190293824A1
- Status: Published application
- Kind: A1
- Application number: 16/361,146
- Filed: 2019-03-21
- Published: 2019-09-26
- Earliest claimed: 2018-03-22
- Assignees: Schlumberger Technology Corporation
- Applicants: Schlumberger Technology Corporation
- Inventors: Qing Liu; Wanning Liu; Cheolkyun Jeong; Diego Medina; Yingfei Hu
- Web page: https://patentgrep.com/patent/US20190293824A1

## CPC

- G01V 1/50: Analysing data
- E21B 44/00: Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- G01V 1/308: {Time lapse or 4D effects, e.g. production related effects to the formation (fluid flow per se E21B47/00)}
- G06F 3/0482: Interaction with lists of selectable items, e.g. menus
- G06F 17/18: for evaluating statistical data {, e.g. average values, frequency distributions, probability functions, regression analysis (forecasting specially adapted for a specific administrative, business or logistic context G06Q10/04)}
- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- G01V 1/301: {for determining seismic cross-sections or geostructures}
- G01V 2200/16: Measure-while-drilling or logging-while-drilling
- G01V 2210/6161: Seismic or acoustic, e.g. land or sea measurements
- G01V 2210/6169: using well-logging
- G01V 2210/74: Visualisation of seismic data
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A method can include accessing data associated with a well and one or more offset wells; based on at least a portion of the data, generating a set of distributions via parametric estimation, where the distributions are associated with a well-related activity and time; analyzing individual distributions in the set of distributions with respect to at least a portion of the data to pass or fail each of the individual distributions; and, for one or more passed individual distributions, outputting one of the passed individual distributions for the well.

## Claims

### Claim 1

A method comprising:
accessing data associated with a well and one or more offset wells;
based on at least a portion of the data, generating a set of distributions via parametric estimation, wherein the distributions are associated with a well-related activity and time;
analyzing individual distributions in the set of distributions with respect to at least a portion of the data to pass or fail each of the individual distributions; and
for one or more passed individual distributions, outputting one of the passed individual distributions for the well.

### Claim 2 (depends on 1)

The method of claim 1 wherein the outputting comprises selecting one of a plurality of passed individual distributions as a best fit to at least a portion of the data.

### Claim 3 (depends on 1)

The method of claim 1 comprising performing the well-related activity for the well.

### Claim 4 (depends on 3)

The method of claim 3 comprising revising a digital plan for the well based at least in part on a time for performing the well-related activity for the well.

### Claim 5 (depends on 1)

The method of claim 1 wherein the well-related activity is characterized by a rate, wherein the rate is defined in distance divided by time.

### Claim 6 (depends on 1)

The method of claim 1 wherein a distribution comprises a distribution density with respect to time or a distribution density with respect to a rate.

### Claim 7 (depends on 1)

The method of claim 1 comprising performing the method of claim 1 for a plurality of well-related activities and outputting a plurality of different passed individual distributions for the well.

### Claim 8 (depends on 7)

The method of claim 7 comprising estimating a cumulative time for performing the plurality of well-related activities using the plurality of different passed individual distributions for the well.

### Claim 9 (depends on 1)

The method of claim 1 wherein, for no passed individual distributions, based at least in part on a portion of the data, generating a distribution via nonparametric estimation.

### Claim 10 (depends on 1)

The method of claim 1 wherein the well-related activity comprises assembly components of equipment or comprises downhole activity.

### Claim 11 (depends on 1)

The method of claim 1 comprising generating a digital plan for construction of at least a portion of the well based at least in part on the outputting.

### Claim 12 (depends on 1)

The method of claim 1 comprising generating a digital plan for construction of at least a portion of the well based at least in part on the outputting.

### Claim 13 (depends on 1)

The method of claim 1 wherein the parametric estimation comprises maximum likelihood estimation that determines corresponding parameters of a distribution.

### Claim 14 (depends on 1)

The method of claim 1 wherein the distribution comprises a member selected from a group that comprises normal, lognormal, gamma, Weibull, uniform, triangle, and BetaPERT.

### Claim 15 (depends on 1)

The method of claim 1 wherein the analyzing comprises hypothesis testing.

### Claim 16 (depends on 15)

The method of claim 15 wherein the hypothesis testing comprises implementing a Kolmogorov-Smirnov test.

### Claim 17 (depends on 1)

The method of claim 1 comprising pre-processing at least a portion of the data.

### Claim 18 (depends on 17)

The method of claim 17 wherein the pre-processing comprises identifying one or more outliers and removing at least one of the outliers from the data prior to generating the set of distributions.

### Claim 19

A system comprising:
a processor;
memory accessible by the processor;
processor-executable instructions stored in the memory and executable to instruct the system to:
access data associated with a well and one or more offset wells;
based on at least a portion of the data, generate a set of distributions via parametric estimation, wherein the distributions are associated with a well-related activity and time;
analyze individual distributions in the set of distributions with respect to at least a portion of the data to pass or fail each of the individual distributions; and
for one or more passed individual distributions, output one of the passed individual distributions for the well.

### Claim 20

One or more computer-readable storage media comprising processor-executable instructions to instruct a computing system to:
access data associated with a well and one or more offset wells;
based on at least a portion of the data, generate a set of distributions via parametric estimation, wherein the distributions are associated with a well-related activity and time;
analyze individual distributions in the set of distributions with respect to at least a portion of the data to pass or fail each of the individual distributions; and
for one or more passed individual distributions, output one of the passed individual distributions for the well.
