# US 2019/0278258 A1 · Operation management apparatus

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0278258 A1
- Document ID: US20190278258A1
- Status: Published application
- Kind: A1
- Application number: 16/292,334
- Filed: 2019-03-05
- Published: 2019-09-12
- Earliest claimed: 2018-03-06
- Assignees: Fanuc Corporation
- Applicants: FANUC Corporation
- Inventors: Yasumasa OKAMURA
- Web page: https://patentgrep.com/patent/US20190278258A1

## CPC

- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G05B 19/4155: characterised by program execution, i.e. part program or machine function execution, e.g. selection of a program
- G05B 19/4183: {characterised by data acquisition, e.g. workpiece identification}
- G05B 2219/31429: Predict end of job execution, schedule new job beforehand
- G05B 2219/32252: Scheduling production, machining, job shop
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

An operation management apparatus predicts the machining processes of one or more facilities. This operation management apparatus acquires a machining program operating on the facilities and including an execution time for each process, generates schedule data to which related information (an identifier of the process) is added, and generates, for each of the facilities, a graph (a process schedule) including a time axis and indicating a progress of the process, based on the generated schedule data.

## Claims

### Claim 1

An operation management apparatus for predicting machining processes of one or more facilities, comprising:
a data processing unit for acquiring a machining program operating on the facilities and including an execution time for each process, and generating schedule data to which related information is added, the related information being an identifier of the process; and
a control unit for generating a process schedule for each of the facilities, the process schedule being a graph including a time axis and indicating a progress of the process based on the schedule data.

### Claim 2 (depends on 1)

The operation management apparatus according to claim 1,
wherein the data processing unit acquires a machining program operating on the facilities and further generates machining program data to which the related information is added, the related information being an identifier of a process included in the machining program, and
the control unit receives a selection of the process of the machining program, specifies the related information of the selected process, extracts the process having the specified related information from the schedule data, and highlights the extracted process on the process schedule.

### Claim 3 (depends on 1)

The operation management apparatus according to claim 1,
wherein the data processing unit further acquires event information from the facilities, and generates actual measurement event data obtained by adding the related information to the event information when a predetermined event has occurred, and
the control unit specifies the related information associated with the actual measurement event data, extracts the process having the specified related information from the schedule data, and highlights the extracted process on the process schedule.
