# US 2019/0244311 A1 · Network system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0244311 A1
- Document ID: US20190244311A1
- Status: Published application
- Kind: A1
- Application number: 16/386,122
- Filed: 2019-04-16
- Published: 2019-08-08
- Earliest claimed: 2010-06-26
- Assignees: LG Electronics Inc.
- Applicants: LG Electronics Inc.
- Inventors: Junho AHN; Yanghwan KIM; Hoonbong LEE; Koonseok LEE; Chulkyu PARK; Yeongjoo CHEON
- Web page: https://patentgrep.com/patent/US20190244311A1

## CPC

- G06Q 50/06: Energy or water supply
- G05B 15/02: electric
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 3/28: Arrangements for balancing of the load in networks by storage of energy
- H02J 13/1331: {using wireless data transmission}
- H02J 13/14: the power network being locally controlled, e.g. home energy management systems [HEMS]
- H02J 13/333: the equipment forming part of substations
- H04L 12/2803: {Home automation networks}
- G01D 2204/16: Displaying of utility pricing or cost
- G01D 2204/45: Utility meters networked together within a single building
- H02J 2105/42: Home appliances
- H02J 2105/55: according to an economic condition, e.g. tariff-based load management
- Y02B 70/30: Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y04S 20/12: Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
- Y04S 20/20: End-user application control systems
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- Y04S 20/242: Home appliances
- Y04S 20/30: Smart metering, e.g. specially adapted for remote reading
- Y04S 50/10: Energy trading, including energy flowing from end-user application to grid
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- G01D: MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Provided is a network system. The network system includes: at least one unit selected from an energy receiving unit receiving energy and an energy management unit managing the energy receiving unit. An energy usage amount or energy usage rate of the energy receiving unit is adjusted; an energy usage amount or usage rate when the unit is controlled based on information relating to at least an energy rate is less than that when the unit is controlled without the base of information relating to at least an energy rate; the energy receiving unit comprises a plurality of components; and an operation of one component among the plurality of components is controlled based on the energy rate related information.

## Claims

### Claim at position 1

1-31. (canceled)

### Claim 32

An energy consumption unit capable of communicating with a network system and capable of receiving energy information related to information related to time-based pricing and information other than information related to time-based pricing, the energy consumption unit comprising:
a plurality of assigned a priorities;
wherein
an operation of a component is adjusted based on the priority and the energy information related to the information related to time-based pricing and the information other than information related to time-based pricing,
wherein the plurality of components comprising:
a first component; and
a second component having a larger power consumption amount per unit hour or energy usage rate than the first component,
wherein the second component is driven at a time interval at which an energy rate is lower than that of the first component.

### Claim 33 (depends on 32)

The energy consumption unit according to claim 32, wherein the second component is driven when energy information is not high-price information.

### Claim 34 (depends on 32)

The energy consumption unit according to claim 32, wherein the second component is driven when energy information is low-price information.

### Claim 35 (depends on 32)

The energy consumption unit according to claim 32, wherein when the energy information indicates that an energy rate is high-price information, and the component has a low priority among the plurality of components, the operation of the component having the low priority is limited.

### Claim 36 (depends on 35)

The energy consumption unit according to claim 35, wherein the high-price information comprises one of recognitions of an on-peak time interval relating to the energy rate, an energy reduction signal, a under-frequency lower than a reference frequency, a small power generation amount, an operation command according to an operation priority, an energy consumption amount more than a reference amount, and limit information on the number of available components.

### Claim 37 (depends on 32)

The energy consumption unit according to claim 32, wherein the priority among the priorities comprises at least one of a priority of the component to operate preferentially, an operation start priority, an energy consumption amount priority, and an energy usage rate priority.

### Claim 38 (depends on 37)

The energy consumption unit according to claim 37, wherein the energy consumption amount priority comprises a current energy consumption amount priority or a power priority per unit hour; and
the energy usage rate priority comprises a current energy usage rate priority or a usage rate priority per unit hour.

### Claim 39 (depends on 38)

The energy consumption unit according to claim 38, wherein the component having a current energy consumption amount, a current energy usage rate, a power per unit hour, and a usage rate per unit hour that is greater than another component is assigned with a low priority.

### Claim 40 (depends on 32)

The energy consumption unit according to claim 32, wherein the operation of the energy consumption unit being adjusted based on the priority and the energy information is based on at least one of the number of available components, an available total energy consumption amount, or a total energy rate.

### Claim 41 (depends on 32)

The energy consumption unit according to claim 32, wherein the operation of the component being adjusted based on the priority and the energy information comprises immediate limitation of the operation of the component, limitation after one process is completed when the operation of the component is divided into a plurality of processes, limitation of the operation of the energy consumption unit after a predetermined time, limitation of the operation of the component after the component consumes a predetermined amount of energy, and limitation of the operation of the component when a usage energy rate reaches a predetermined value.

### Claim 42 (depends on 32)

The energy consumption unit according to claim 32, wherein if an operation of component having a higher priority than a component having an operation limited due to low priority is completed among the plurality of components, the component having the operation limited returns to a state before the operation of the component was limited.