# US 2019/0232988 A1 · A railway track condition monitoring system for detecting a partial or complete disruption of a rail of the railway track

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0232988 A1
- Document ID: US20190232988A1
- Status: Published application
- Kind: A1
- Application number: 16/330,914
- Filed: 2017-09-06
- Published: 2019-08-01
- Earliest claimed: 2016-09-07
- Assignees: Wavetrain Systems AS
- Applicants: Wavetrain Systems AS
- Inventors: Dominik LANG
- Web page: https://patentgrep.com/patent/US20190232988A1

## CPC

- B61L 23/044: {Broken rails}
- B61K 9/10: for detecting cracks in rails or welds thereof
- B61L 15/0072: {On-board train data handling}
- B61L 25/025: {Absolute localisation, e.g. providing geodetic coordinates}
- B61L 27/70: Details of trackside communication
- G01H 1/00: Measuring {characteristics of} vibrations in solids by using direct conduction to the detector (G01H9/00, G01H11/00 take precedence)
- G08B 21/18: Status alarms (G08B21/02 takes precedence)
- B61L 2205/02: Global system for mobile communication - railways [GSM-R]
- B61L: GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC (brakes or auxiliary equipment B61H, B61K; point or crossing construction E01B)
- B61K: AUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
- G01H: MEASUREMENT OF MECHANICAL VIBRATIONS OR ULTRASONIC, SONIC OR INFRASONIC WAVES
- G08B: SIGNALLING SYSTEMS, e.g. PERSONAL CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS

## Abstract

A railway track condition monitoring system including a plurality of sensors installed on a rail of the track and spaced by a predetermined distance from each other. The sensors having respective signal acquisition and recording means for the acquisition and recording of an acoustic signal being generated by an approaching train and propagated by the rail or by a ground carrying the rail. A signal transfer means for the transfer of an acquired and recorded signal to the passing train by wireless transfer at the time of passing of the train in proximity to sensors, and a signal analyzing means for analysing transferred ones of the acquired and recorded signal on-board the passing train. The signal analyzing means may be adapted to compare in a processing unit the signals from adjacent sensors and on that basis indicate a rail discontinuity.

## Claims

### Claim 1

A railway track condition monitoring system for detecting a partial or complete disruption of a rail of the railway track, comprising:
a plurality of sensors installed on a rail of the track and spaced by a predetermined distance from each other, the sensors having respective signal acquisition and recording means for the acquisition and recording of an acoustic signal being generated by an approaching train and propagated by the rail or by a ground carrying the rail;
a signal transfer means for the transfer of an acquired and recorded signal to the passing train by wireless transfer at the time of passing of the train in proximity to sensors;
a signal analyzing means for analysing transferred ones of the acquired and recorded signal on-board the passing train; and
means adapted to cross-correlating the signals from a first sensor (sn) and an adjacent second sensor (sn+m) and detecting the partial or complete disruption of a rail of the railway track.

### Claim 2 (depends on 1)

The rail condition monitoring system of claim 1, wherein the installed sensors are adapted to be stimulated by an acoustic stimulation passively generated by the approaching train collecting the data.

### Claim 3 (depends on 1)

The rail condition monitoring system of claim 1, wherein the installed sensors comprise means for recording the signal for a given programmed time period upon the signal exceeding a predefined noise level.

### Claim 4 (depends on 1)

The rail condition monitoring system of claim 1, wherein the signal acquisition and recording means is adapted to identify a start of the signal and to record the start of the signal, and the signal analyzing means is adapted to analyse a recorded start of the signal to derive therefrom rail breakage information indicating a rail discontinuity.

### Claim 5 (depends on 1)

The rail condition monitoring system according to claim 1, further comprising:
means adapted to distinguish cross-correlation coefficients obtained into
a) “exact” correlation for Corr. value=1,
b) “strong” correlation for Corr. value>0.8,
c) “medium” correlation for Corr. value=0.5-0.8,
d) “weak” correlation for Corr. value<0.5, and
e) “no” correlation for Corr. value=0; and
means responsive to said distinguished cross-correlation coefficients and adapted so to not send an alert message in response to “exact” or “strong” correlation, to perform double-check with neighboring sensors before an alert message is sent in response to “medium” correlation, and to send an alert message in response to “weak” or “no” correlation.

### Claim 6 (depends on 2)

The rail condition monitoring system of claim 2, wherein the installed sensors comprise means for recording the signal for a given programmed time period upon the signal exceeding predefined noise level.

### Claim 7 (depends on 2)

The rail condition monitoring system of claim 2, wherein signal acquisition and recording means is adapted to identify a start of the signal and to record the start of the signal, and the signal analyzing means is adapted to analyse a recorded start of the signal to derive therefrom rail breakage information indicating a rail discontinuity.

### Claim 8 (depends on 2)

The rail condition monitoring system according to claim 2, comprising:
means adapted to distinguish cross-correlation coefficients obtained into
a) “exact” correlation for Corr. value=1,
b) “strong” correlation for Corr. value>0.8,
c) “medium” correlation for Corr. value=0.5-0.8,
d) “weak” correlation for Corr. value<0.5, and
e) “no” correlation for Corr. value=0; and
means responsive to said distinguished cross-correlation coefficients and adapted so to not send an alert message in response to “exact” or “strong” correlation, to perform double-check with neighboring sensors before an alert message is sent in response to “medium” correlation, and to send an alert message in response to “weak” or “no” correlation.

### Claim 9 (depends on 3)

The rail condition monitoring system according to claim 3, comprising:
means adapted to distinguish cross-correlation coefficients obtained into
a) “exact” correlation for Corr. value=1,
b) “strong” correlation for Corr. value>0.8,
c) “medium” correlation for Corr. value=0.5-0.8,
d) “weak” correlation for Corr. value<0.5, and
e) “no” correlation for Corr. value=0; and
means responsive to said distinguished cross-correlation coefficients and adapted so to not send an alert message in response to “exact” or “strong” correlation, to perform double-check with neighboring sensors before an alert message is sent in response to “medium” correlation, and to send an alert message in response to “weak” or “no” correlation.

### Claim 10 (depends on 4)

The rail condition monitoring system according to claim 4, comprising:
means adapted to distinguish cross-correlation coefficients obtained into
a) “exact” correlation for Corr. value=1,
b) “strong” correlation for Corr. value>0.8,
c) “medium” correlation for Corr. value=0.5-0.8,
d) “weak” correlation for Corr. value<0.5, and
e) “no” correlation for Corr. value=0; and
means responsive to said distinguished cross-correlation coefficients and adapted so to not send an alert message in response to “exact” or “strong” correlation, to perform double-check with neighboring sensors before an alert message is sent in response to “medium” correlation, and to send an alert message in response to “weak” or “no” correlation.