Reinitialization method of a zone controller and associated automatic train control system
AssigneeAlstom Transport Technologies
InventorsJavier BALLESTEROS, Mathieu BRESSON
Life of this patent
Estimating the term…
Loading patent…
AssigneeAlstom Transport Technologies
InventorsJavier BALLESTEROS, Mathieu BRESSON
Estimating the term…
Disclosed is a method, implemented in a supervision system for trains of the “communication-based train management” type, which includes the steps, carried out by a zone controller, including: during nominal operation, periodically saving an image of a current operational situation on an external memory; and, after a downtime period and rebooting of the zone controller: establishing an image of the operational situation after rebooting; recovering, from the external memory, the most recent saved image as image of the operational situation before failure; collecting information on the crossing of borders of the zone associated with the zone controller during the downtime period; and verifying the coherence of the image of the operational situation after rebooting from the image of the operational situation before failure and crossing information.
A reinitialization method (100) of a zone controller (ZCn) in a train supervision system of the “communication-based train control” type, including the following steps, carried out by the zone controller (ZCn):
Dependencies are inferred from the claim text.