# US 2019/0174660 A1 · Component mounting system, component mounting device, and board transport method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0174660 A1
- Document ID: US20190174660A1
- Status: Published application
- Kind: A1
- Application number: 16/200,704
- Filed: 2018-11-27
- Published: 2019-06-06
- Earliest claimed: 2017-12-06
- Assignees: Panasonic Intellectual Property Management Co., Ltd.
- Applicants: Panasonic Intellectual Property Management Co., Ltd.
- Inventors: JOY POOTHOKARAN; KAZUYUKI NAGASE; MICHIAKI MAWATARI
- Web page: https://patentgrep.com/patent/US20190174660A1

## CPC

- H05K 13/0061: {Tools for holding the circuit boards during processing; handling transport of printed circuit boards}
- H05K 13/0882: {Control systems for mounting machines or assembly lines, e.g. centralized control, remote links, programming of apparatus and processes as such (H05K13/083 takes precedence)}
- H05K 13/0465: {by soldering (H05K13/0469 takes precedence)}
- H05K: PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS

## Abstract

A component mounting system includes a board transport line for transporting a board from an upstream to a downstream and a work station disposed in the board transport line and performing component mounting work. The board transport line transports a board introduced in the downstream of the work station to the work station, and transports the board from the work station to the downstream when mounting of a component on the board is completed in the work station.

## Claims

### Claim 1

A component mounting system comprising:
a board transport line for transporting a board from an upstream to a downstream; and
a work station disposed in the board transport line and performing component mounting work,
wherein the board transport line transports a board introduced in the downstream of the work station to the work station, and transports the board from the work station to the downstream when mounting of a component on the board is completed in the work station.

### Claim 2 (depends on 1)

The component mounting system of claim 1,
wherein the board transport line prohibits a board from being carried in the work station from the upstream of the work station until the board introduced in the downstream of the work station reaches the work station.

### Claim 3 (depends on 2)

The component mounting system of claim 2,
wherein the board transport line enables the board to be carried in the work station from the upstream of the work station when the board on which the mounting of the component is completed is carried out from the work station.

### Claim 4

A component mounting device comprising:
a board transporter constituting a part of a board transport line for transporting a board from an upstream to a downstream; and
a component mounting head mounting a component on the board in a work station in the middle of the board transporter,
wherein the board transporter has a first operation mode in which a board received from an upstream device is transported to the work station and the board is delivered from the work station to a downstream device when mounting of the component on the board is completed in the work station, and a second operation mode in which a board introduced in the downstream of the work station is transported to the work station.

### Claim 5 (depends on 4)

The component mounting device of claim 4,
wherein the board transporter prohibits a board from being carried in the work station from the upstream of the work station until the board introduced in the downstream of the work station is carried in the work station according to the second operation mode.

### Claim 6 (depends on 4)

The component mounting device of claim 4,
wherein the board transporter carries out the board which is carried in the work station according to the second operation mode and on which the mounting of the component is completed, to the downstream.

### Claim 7 (depends on 6)

The component mounting device of claim 6,
wherein the board transporter is switched to the first operation mode after the board is carried in the work station according to the second operation mode, and carries out the board on which the mounting of the component is completed according to the first operation mode, to the downstream.

### Claim 8 (depends on 4)

The component mounting device of claim 4,
wherein the board transporter further has a third operation mode in which a board introduced in the downstream of the work station is transported to the upstream device.

### Claim 9

A board transport method in a component mounting device including a board transporter constituting a part of a board transport line for transporting a board from an upstream to a downstream, and a component mounting head mounting a component on the board in a work station in the middle of the board transporter, the method comprising:
transporting a board introduced in the downstream of the work station to the work station by the board transporter;
transporting the board to the upstream of a stop position which is set in the work station by the board transporter; and
transporting the board to the downstream and stopping the board at the stop position by the board transporter.