# US 2019/0174548 A1 · Method for indicating and determining listen-before-talk parameters, base station and user equipment

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0174548 A1
- Document ID: US20190174548A1
- Status: Published application
- Kind: A1
- Application number: 16/324,487
- Filed: 2017-08-09
- Published: 2019-06-06
- Earliest claimed: 2016-08-11
- Assignees: Ntt Docomo, Inc.
- Applicants: Ntt Docomo Inc.
- Inventors: Yu JIANG; Liu LIU; Jing WANG; Huiling JIANG; Satoshi NAGATA
- Web page: https://patentgrep.com/patent/US20190174548A1

## CPC

- H04W 74/0808: using carrier sensing, e.g. carrier sense multiple access [CSMA]
- H04W 74/0816: with collision avoidance
- H04W 52/02: Power saving arrangements
- H04W 72/0446: Resources in time domain, e.g. slots or frames
- H04W 72/12: Wireless traffic scheduling
- H04W 72/23: in the downlink direction of a wireless link, i.e. towards a terminal
- H04W 72/56: based on priority criteria
- H04W 74/006: {in the downlink, i.e. towards the terminal}
- Y02D 30/70: in wireless communication networks
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

Provided are a method used for indicating and determining a parameter value of Listen-Before-Talk (LBT) parameters, a base station and a user equipment, the method including: determining a parameter value of LBT parameters, the LBT parameters including an LBT type, an LBT priority, and a start position of a physical uplink shared channel PUSCH; determining an index for carrying out joint indication of the LBT parameters on the basis of a subset of a full set which is formed by combining possible parameter values of each LBT parameter; generating downlink control information including the index; and sending the downlink control information to a user equipment.

## Claims

### Claim 1

(canceled)

### Claim 2 (depends on 18)

The user equipment of claim 18, wherein
the subset is formed by excluding conflict combinations of possible parameter values of the LBT type, the LBT priority, and the PUSCH start position, from the universal set.

### Claim 3 (depends on 2)

The user equipment of claim 2, wherein
possible parameter values of the LBT type include a second type LBT and a fourth type LBT; and
as for the case where the LBT type is the second type LBT, the subset is formed without considering the LBT priority.

### Claim 4 (depends on 2)

The user equipment of claim 2, wherein
possible parameter values of the LBT type include a second type LBT and a fourth type LBT;
possible parameter values of the PUSCH start position include a 0th symbol, a 1st symbol, a timing at which a predetermined value elapse after the 0th symbol, and a timing at which the predetermined value and a timing advance value elapse after the 0th symbol; and
the subset is formed by excluding the combination that contains the LBT type of being the fourth type LBT and the PUSCH start position of being the timing at which the predetermined value elapses after the 0th symbol, and excluding the combination that contains the LBT type of being the fourth type LBT and the PUSCH start position of being the timing at which the predetermined value and the timing advance value elapse after the 0th symbol, from the universal set.

### Claim 5 (depends on 2)

The user equipment of claim 2, wherein
the LBT parameters further include a contention window size CWS;
possible parameter values of the LBT type include a second type LBT and a fourth type LBT; and
as for the case where the LBT type is the second type LBT, the subset is formed without considering the LBT priority and the CWS.

### Claim 6 (depends on 18)

The user equipment of claim 18, wherein
the subset is formed based on a usage probability of combinations of possible parameter values of the LBT type, the LBT priority, and the PUSCH start position.

### Claim 7 (depends on 6)

The user equipment of claim 6, wherein
the LBT parameters further include a multi-subframe scheduling gap, the multi-subframe scheduling gap including an LBT type of each gap; and
the subset is formed based on a usage probability of combinations of possible parameter values of the LBT type, the LBT priority, the PUSCH start position, and the LBT type of each gap.

### Claim 8 (depends on 7)

The user equipment of claim 7, wherein
possible parameter values of the LBT type of each gap include a second type LBT and a fourth type LBT;
the subset is formed by using the second type LBT to each gap.

### Claim 9 (depends on 8)

The user equipment of claim 8, wherein
the multi-subframe scheduling gap further includes a PUSCH start position of the remaining subframes of a plurality of subframes except a first subframe, and possible parameter values of the PUSCH start position of the remaining subframes include a 0th symbol, a 1st symbol, a timing at which a predetermined value elapses after the 0th symbol, and the timing at which the predetermined value and a timing advance value elapse after the 0th symbol; and
the subset is formed by using the timing at which the predetermined value elapses after the 0th symbol to the remaining subframes.

### Claim 10 (depends on 7)

The user equipment of claim 7, wherein
possible parameter values of the LBT type include a second type LBT and a fourth type LBT; and
as for the case where the LBT type is the fourth type LBT, the subset is formed by not using a gap between adjacent subframes of a plurality of subframes.

### Claim 11 (depends on 6)

The user equipment of claim 6, wherein
possible parameter values of the LBT priority include 1, 2, 3, and 4; and
the subset is formed by excluding the combination that contains the LBT priority of being 3, from the universal set.

### Claim 12 (depends on 6)

The user equipment of claim 6, wherein
possible parameter values of the LBT type include a second type LBT and a fourth type LBT;
possible parameter values of the PUSCH start position include a 0th symbol, a 1st symbol, a timing at which a predetermined value elapse after the 0th symbol, and a timing at which the predetermined value and a timing advance value elapse after the 0th symbol; and
the subset is formed by excluding the combination that contains the LBT type of being the second type LBT and the PUSCH start position of being a 1st symbol, from the universal set.

### Claim 13

A base station for indicating a parameter value of listen-before-talk LBT parameters, the base station comprising:
a parameter value determining unit configured to determine a parameter value of LBT parameters, the LBT parameters including an LBT type, an LBT priority, and a physical uplink shared channel PUSCH start position;
an index determining unit configured to determine, based on a subset of a universal set formed by combinations of possible parameter values of the respective LBT parameters, an index for joint indication of the LBT parameters;
a generating unit configured to generate downlink control information that includes the index; and
a transmitting unit configured to send the downlink control information to a user equipment.

### Claim 14 (depends on 13)

The base station of claim 13, wherein
the subset is formed by excluding conflict combinations of possible parameter values of the LBT type, the LBT priority, and the PUSCH start position, from the universal set.

### Claim 15 (depends on 13)

The base station of claim 13, wherein the subset is formed based on a usage probability of combinations of possible parameter values of the LBT type, the LBT priority, and the PUSCH start position.

### Claim 16 (depends on 15)

The base station according to claim 15, wherein
the LBT parameters further include a multi-subframe scheduling gap, the multi-subframe scheduling gap including an LBT type of each gap; and
the subset is formed based on a usage probability of combinations of possible parameter values of the LBT type, the LBT priority, the PUSCH start position, and the LBT type of each gap.

### Claim 17

A method for determining a parameter value of listen-before-talk LBT parameters in a user equipment, comprising:
receiving downlink control information, the downlink control information including an index for joint indication of the LBT parameters, the LBT parameters including an LBT type, an LBT priority, and a physical uplink shared channel PUSCH start position; and
determining a parameter value of the LBT parameters according to the index and based on a subset of a universal set formed by combinations of possible parameter values of the respective LBT parameters.

### Claim 18

A user equipment for determining a parameter value of Listen-Before-Talk LBT parameters, the user equipment comprising:
a receiving unit configured to receive downlink control information, the downlink control information including an index for joint indication of the LBT parameters, the LBT parameters including an LBT type, an LBT priority, and a physical uplink shared channel PUSCH start position; and
a determining unit configured to determine a parameter value of the LBT parameters according to the index and based on a subset of a universal set formed by combinations of possible parameter values of the respective LBT parameters.