# US 2019/0173596 A1 · Method for fast reconfiguration of gm clocks in the tsn network by means of an explicit teardown message

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0173596 A1
- Document ID: US20190173596A1
- Status: Published application
- Kind: A1
- Application number: 16/302,505
- Filed: 2016-05-19
- Published: 2019-06-06
- Earliest claimed: 2016-05-19
- Assignees: Siemens Aktiengesellschaft
- Applicants: Siemens Aktiengesellschaft
- Inventors: FENG CHEN; JÜRGEN SCHMITT
- Web page: https://patentgrep.com/patent/US20190173596A1

## CPC

- H04J 3/0641: {Change of the master or reference, e.g. take-over or failure of the master}
- H04J 3/0644: {External master-clock}
- H04J 3/0667: {Bidirectional timestamps, e.g. NTP or PTP for compensation of clock drift and for compensation of propagation delays (arrangements for monitoring round trip delays in packet switching networks H04L43/0864)}
- H04J 3/0682: {by delay compensation, e.g. by compensation of propagation delay or variations thereof, by ranging}
- H04L 67/12: specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
- H04J: MULTIPLEX COMMUNICATION (transmission in general H04B; peculiar to transmission of digital information H04L5/00; systems for the simultaneous or sequential transmission of more than one television signal H04N7/08; in exchanges H04Q11/00; stereophonic systems H04S)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

The invention relates to a method for fast reconfiguration of GM clocks in the TSN network by means of an explicit teardown message. Carrying out a network-wide cleansing of the outdated information ensures that outdated GM information having a higher priority cannot overwrite new information. The current BMCA+ relies on the hold time mechanism in order to quickly carry out the GM reconfiguration on all nodes. The problem is solved by the introduction of a specific advertising schema for the BMCA+ protocol in order to resolve the described instability during the GM reconfiguration period. The method uses an announce+ message for an extra messaging that displays a clock having outdated information and disseminates new information in the complete network. The aim is to inform all clocks that outdated information is present such that the GM reconfiguration can be carried out quickly and without extra conflicts. This so-called “teardown” notification is provided for the case when a current best clock (that is, either a first or second-best GM clock) lowers its priority in order to become a subordinate clock.

## Claims

### Claim at position 1

-9. (canceled)

### Claim 10

A method for reconfiguring information from redundant grand master (GM) clocks in a gPTP (Generalized Precision Time Protocol) network having network elements comprising the GM clocks, the method comprising:
transmitting a teardown message from one network element to an adjacent network element, and
with information about the redundant GM clocks contained in the teardown message, downgrade at least one of the redundant GM clocks in the network elements of the network to become a subordinate clock.

### Claim 11 (depends on 10)

The method of claim 10, wherein the information about the redundant GM clocks contained in the teardown message comprises only a clock ID and a serial number of the downgraded clock.

### Claim 12 (depends on 10)

The method of claim 10, wherein the teardown message is transmitted in a type-length-value (TLV) format.

### Claim 13 (depends on 10)

The method of claim 10, further comprising after the teardown message is received by the adjacent network element, removing the information contained in the teardown message from a local database of a receiving network element.

### Claim 14 (depends on 13)

The method of claim 13, further comprising selecting a new best GM clock after the information contained in the teardown message has been removed from the local database.

### Claim 15 (depends on 10)

The method of claim 10, wherein the teardown message is transmitted only once via each data port of the one network element.

### Claim 16 (depends on 10)

The method of claim 10, further comprising acknowledging receipt of the teardown message by sending a confirmation message from the adjacent network element to the one transmitting network element.

### Claim 17 (depends on 16)

The method of claim 16, wherein the confirmation message contains a copy of the received teardown message.

### Claim 18

A network element which is incorporated in a communication network operating according to an IEEE 802.1 TSN standard, wherein the network element is configured to
transmit a teardown message to an adjacent network element, and
with information contained in the teardown message, downgrade at least one of the redundant GM clocks in the network elements of the network to become a subordinate clock.