# US 2019/0171442 A1 · Software update control device, software update control method, and recording medium having software update control program stored thereon

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0171442 A1
- Document ID: US20190171442A1
- Status: Published application
- Kind: A1
- Application number: 16/092,511
- Filed: 2017-04-10
- Published: 2019-06-06
- Earliest claimed: 2016-04-15
- Assignees: NEC Corporation
- Applicants: NEC Corporation
- Inventors: Fumio MACHIDA
- Web page: https://patentgrep.com/patent/US20190171442A1

## CPC

- G06F 8/656: while running
- G06F 8/71: Version control (security arrangements therefor G06F21/57); Configuration management
- G06F 9/46: Multiprogramming arrangements
- G06F 9/4856: {resumption being on a different machine, e.g. task migration, virtual machine migration (G06F9/5088 takes precedence)}
- G06F 9/5077: {Logical partitioning of resources; Management or configuration of virtualized resources (specific details on emulation or internal functioning of virtual machines G06F9/455)}
- G06F 11/00: Error detection; Error correction; Monitoring (error detection, correction or monitoring in information storage based on relative movement between record carrier and transducer G11B20/18; monitoring, i.e. supervising the progress of recording or reproducing G11B27/36; in static stores G11C29/00)
- G06F 11/1433: {during software upgrading}
- H04L 67/1031: Controlling of the operation of servers by a load balancer, e.g. adding or removing servers that serve requests
- H04L 67/34: {involving the movement of software or configuration parameters (network booting or remote initial program loading [RIPL] G06F9/4416)}
- G06F 11/1484: {involving virtual machines}
- G06F 11/203: {using migration}
- H04L 67/62: Establishing a time schedule for servicing the requests
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

To perform an update process on software reliably without shutting down an edge server in an IoT system, the software update control device 60 is provided with: a first execution control unit 61 which creates, in a second information processing system 80, an operating environment including updated software; a verification unit 62 which verifies operation performed in the operating environment including the updated software; a transfer control unit 63 which transfers an operating environment including the original version of the updated software from a first information processing system 70 to the second information processing system 80; a second execution control unit 64 which causes the second information processing system 80 to execute the updated software; and a switching unit 65 which switches the information to be processed by the second information processing system 80 from information obtained by executing the original software to information obtained by executing the updated software.

## Claims

### Claim 1

A software update control device comprising:
a first execution control unit configured to perform control in such a way that, when a second information processing system processes original output information output by first information processing resources included in a first information processing system executing software before update, second information processing resources included in the second information processing system execute the software being updated;
a verification unit configured to verify a trial operation in which the second information processing system processes information output by the second information processing resources executing the updated software;
a transfer control unit configured to perform control in such a way that, when a verification result by the verification unit with respect to the trial operation indicates being normal, a state of outputting the original output information is transferred from the first information processing resources to third information processing resources included in the second information processing system, and the second information processing system is able to process the original output information output by the third information processing resources;
a second execution control unit configured to perform control in such a way that, after processing by the transfer control unit is performed, the first information processing resources output updated output information by executing the updated software; and
a switching unit configured to switch processing target information being a processing target of the second information processing system, from the original output information output by the first or third information processing resources, to the updated output information output by the first or second information processing resources.

### Claim 2 (depends on 1)

The software update control device according to claim 1, further comprising
a data reception unit control unit configured to perform control in such a way that, in a case that the first information processing resources process processing target data received from outside by a data reception unit included in the first information processing system, when the second information processing resources execute the updated software by the first execution control unit, the data reception unit copies the processing target data and inputs the copied processing target data to the second information processing resources.

### Claim 3 (depends on 1)

The software update control device according to claim 1, wherein
the switching unit performs control in such way that, after the processing target information is switched, the second information processing system processes the original output information output by the third information processing resources, and stores a result of the processing in a storage unit included in the second information processing system.

### Claim 4 (depends on 3)

The software update control device according to claim 3, wherein
the verification unit verifies an updated operation in which the second information processing system processes the updated output information output by the first information processing resources, and,
when a verification result by the verification unit with respect to the updated operation indicates being abnormal, the switching unit performs control in such a way as to switch the processing target information from information acquired by the updated operation, to information stored in the storage unit.

### Claim 5 (depends on 1)

The software update control device according to claim 1, wherein,
when fourth information processing resources included in the first information processing system perform processing with priority lower than a criterion, the transfer control unit performs control in such a way that processing performed by the fourth information processing resources is transferred to the third information processing resources,
after processing by the transfer control unit is performed, the second execution control unit performs control in such a way that the fourth information processing resources output the updated output information by executing the updated software, and
the switching unit switches the processing target information from the original output information output by the first information processing resources, to the updated output information output by the fourth information processing resources.

### Claim 6 (depends on 1)

The software update control device according to claim 1, wherein
the first execution control unit performs control in such a way that fifth information processing resources included in a third information processing system execute the updated software,
the verification unit verifies the trial operation in which the second information processing system processes the updated output information output by the fifth information processing resources, and
the switching unit switches the processing target information, from the original output information output by the first or third information processing resources, to the updated output information output by the first or fifth information processing resources.

### Claim 7 (depends on 1)

The software update control device according to claim 1, further comprising
update instruction unit configured to output, for each of a plurality of the first information processing systems, instruction information instructing update of the software in a specific first information processing system of the first information processing systems, based on information indicating a schedule for update processing of the software or information input from outside, wherein
the first execution control unit, the verification unit, the transfer control unit, the second execution control unit, and the switching unit execute processing related to the specific first information processing system, based on the instruction information.

### Claim 8 (depends on 1)

A software update control device according to claim 1 further comprising
the first and second information processing systems.

### Claim 9

A software update control method comprising, by an information processing device:
performing control in such a way that, when a second information processing system processes original output information output by first information processing resources included in a first information processing system executing software before update, second information processing resources included in the second information processing system execute the software being updated;
verifying a trial operation in which the second information processing system processes information output by the second information processing resources executing the updated software;
performing control in such a way that, when a verification result with respect to the trial operation indicates being normal, a state of outputting the original output information is transferred from the first information processing resources to third information processing resources included in the second information processing system, and the second information processing system is able to process the original output information output by the third information processing resources;
performing control in such a way that, after entering a state in which the second information processing system is able to process the original output information output from the third information processing resources, the first information processing resources output updated output information by executing the updated software; and
switching processing target information being a processing target of the second information processing system, from the original output information output by the first or third information processing resources, to the updated output information output by the first or second information processing resources.

### Claim 10

A non-transitory computer readable recording medium storing a software update control program causing a computer to execute:
first execution control processing of performing control in such a way that, when a second information processing system processes original output information output by first information processing resources included in a first information processing system executing software before update, second information processing resources included in the second information processing system execute the software being updated;
verification processing of verifying a trial operation in which the second information processing system processes information output by the second information processing resources executing the updated software;
transfer control processing of performing control in such a way that, when a verification result by the verification processing with respect to the trial operation indicates being normal, a state of outputting the original output information is transferred from the first information processing resources to third information processing resources included in the second information processing system, and the second information processing system is able to process the original output information output by the third information processing resources;
second execution control processing of performing control in such a way that, after processing by the transfer control processing is performed, the first information processing resources output updated output information by executing the updated software; and
switching processing of switching processing target information being a processing target of the second information processing system, from the original output information output by the first or third information processing resources, to the updated output information output by the first or second information processing resources.