# US 2019/0170005 A1 · Passive Gas-Leak Management System

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0170005 A1
- Document ID: US20190170005A1
- Status: Published application
- Kind: A1
- Application number: 15/829,217
- Filed: 2017-12-01
- Published: 2019-06-06
- Earliest claimed: 2017-12-01
- Assignees: Bell Helicopter Textron Inc.
- Applicants: Bell Helicopter Textron Inc.
- Inventors: Keith David Weaver; David Angell; Stephen Dickison; David Michael Tiedeman; Nicholas Plagianos
- Web page: https://patentgrep.com/patent/US20190170005A1

## CPC

- F01D 11/005: {Sealing means between non relatively rotating elements}
- F02C 6/08: the gas being bled from the gas-turbine compressor
- B64D 13/00: Arrangements or adaptations of air-treatment apparatus for aircraft crew or passengers, or freight space
- B64D 15/04: Hot gas application
- B64D 45/00: Aircraft indicators or protectors not otherwise provided for
- F01D 11/003: {by packing rings; Mechanical seals}
- F16L 21/002: {Sleeves or nipples for pipes of the same diameter; Reduction pieces (F16L27/00, F16L37/00 take precedence; with elastic sealing rings F16L21/022)}
- B64D 2045/0085: {Devices for aircraft health monitoring, e.g. monitoring flutter or vibration}
- B64D 2045/009: {Fire detection or protection; Erosion protection, e.g. from airborne particles}
- B64D 2231/02: Supply or distribution systems
- F05D 2220/329: in helicopters
- F16L 2201/30: Detecting leaks
- G01M 3/002: {by using thermal means}
- Y02T 50/40: Weight reduction
- Y02T 50/60: Efficient propulsion technologies, e.g. for aircraft
- Y10T 137/5762: With leakage or drip collecting
- F01D: NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES (machines or engines for liquids F03; non-positive displacement pumps F04D)
- F02C: GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS (construction of turbines F01D; jet-propulsion plants F02K; construction of compressors or fans F04; generating combustion products of high pressure or high velocity F23R; using gas turbines in compression refrigeration plants F25B11/00)
- B64D: EQUIPMENT FOR FITTING IN OR TO AIRCRAFT; FLIGHT SUITS; PARACHUTES; ARRANGEMENT OR MOUNTING OF POWER PLANTS OR PROPULSION TRANSMISSIONS IN AIRCRAFT
- F16L: PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F05D: INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- G01M: TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- Y02T: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

A gas-leak management system including a primary duct; and a leak-management duct, at least a portion of the leak-management duct surrounding at least a portion of the primary duct, wherein the leak-management duct includes a gap between the portion of the primary duct and the portion of the leak-management duct, and including one or more vent holes in fluid communication with the gap.

## Claims

### Claim 1

A gas-leak management system, comprising:
a primary duct; and
a leak-management duct, at least a portion of the leak-management duct surrounding at least a portion of the primary duct, wherein the leak-management duct forms a gap between the portion of the primary duct and the portion of the leak-management duct, and comprising one or more vent holes in fluid communication with the gap.

### Claim 2 (depends on 1)

The system of claim 1, further comprising one or more standoff brackets mounted between the primary duct and the leak-management duct.

### Claim 3 (depends on 1)

The system of claim 1, wherein the gap comprises an air gap.

### Claim 4 (depends on 1)

The system of claim 1, further comprising a porous material disposed within all or part of the gap.

### Claim 5 (depends on 1)

The system of claim 1, wherein:
the primary duct and/or the leak-management duct comprise a rigid material, a flexible material, or combinations thereof; or
the primary duct comprises a metallic material, a non-metallic material, or a combination thereof; or.
the leak-management duct comprises a thin-wall insulation.

### Claim 6 (depends on 1)

The system of claim 1, wherein the one or more vent holes are located to vent a gas at one or more selected locations.

### Claim 7 (depends on 6)

The system of claim 6, wherein the one or more selected locations are selected to direct the gas to one or more areas where a presence, temperature and/or pressure of the gas is acceptable.

### Claim 8 (depends on 1)

The system of claim 1, wherein the one or more vent holes are oriented to vent a gas in one or more selected directions.

### Claim 9 (depends on 8)

The system of claim 8, wherein the one or more selected directions are selected to direct the gas to one or more areas where a presence, temperature and/or pressure of the gas is acceptable.

### Claim 10 (depends on 1)

The system of claim 1, further comprising:
a primary-duct coupling attaching a first section of the primary duct to a second section of the primary duct; and
a coupling cover attaching a first section of the leak-management duct to a second section of the leak-management duct, wherein the coupling cover is disposed over the primary-duct coupling.

### Claim 11

A method of managing gas leaks, comprising:
surrounding at least a portion of a primary duct with at least a portion of a leak-management duct to form a gap between the at least a portion of the primary duct and the at least a portion of the leak-management duct; and
placing one or more vent holes in the leak-management duct in fluid communication with the gap.

### Claim 12 (depends on 11)

The method of claim 11, further mounting one or more standoff brackets between the primary duct and the leak-management duct.

### Claim 13 (depends on 11)

The method of claim 11, wherein the gap comprises an air gap.

### Claim 14 (depends on 11)

The method of claim 11, further placing a porous material within all or part of the gap.

### Claim 15 (depends on 11)

The method of claim 11, further comprising:
forming the primary duct and/or the leak-management duct from a rigid material, a flexible material, or combinations thereof; or
forming the primary duct from a metallic material, a non-metallic material, or a combination thereof; or
forming the leak-management duct from a thin-wall insulation.

### Claim 16 (depends on 11)

The method of claim 11, further comprising placing the one or more vent holes in the leak-management duct to vent a gas at one or more selected locations.

### Claim 17 (depends on 11)

The method of claim 11, further comprising placing the one or more vent holes in the leak-management duct to direct the gas to one or more areas where a presence, temperature and/or pressure of the gas is acceptable.

### Claim 18 (depends on 11)

The method of claim 11, further comprising orienting the one or more vent holes in the leak-management duct to direct a gas in one or more selected directions.

### Claim 19 (depends on 11)

The method of claim 11, further comprising orienting the one or more vent holes in the leak-management duct to direct the gas to one or more areas where the presence, temperature and/or pressure of the gas is acceptable.

### Claim 20 (depends on 11)

The method of claim 11, further comprising:
attaching a first section of the primary duct to a second section of the primary duct using a primary-duct coupling; and
attaching a first section of the leak-management duct to a second section of the leak-management duct using a coupling cover wherein the coupling cover is disposed over the primary-duct cover to form the gap between the primary-duct coupling and the coupling cover.

### Claim 21

A vehicle, comprising:
a compartment disposed within the vehicle;
a primary duct coupled to the compartment or component within the compartment; and
a leak-management duct coupled to the primary duct to form a gap between at least a portion of the main duct and at least a portion of the leak-management duct, wherein the leak-management duct has one or more vent holes in fluid communication with the gap.

### Claim 22 (depends on 21)

The vehicle of claim 21, wherein:
the vehicle comprises an aircraft, watercraft, above or below ground vehicle, or spacecraft; and
the compartment comprises an engine compartment.

### Claim 23 (depends on 21)

The vehicle of claim 21, further comprising one or more standoff brackets mounted between the primary duct and the leak-management duct.

### Claim 24 (depends on 21)

The vehicle of claim 21, wherein the gap comprises an air gap.

### Claim 25 (depends on 21)

The vehicle of claim 21, further comprising a porous material disposed within all or part of the gap.

### Claim 26 (depends on 21)

The vehicle of claim 21, wherein:
the primary duct and/or the leak-management duct comprise a rigid material, a flexible material, or combinations thereof; or
the primary duct comprises a metallic material, a non-metallic material, or a combination thereof; or
the leak-management duct comprises thin-wall insulation.

### Claim 27 (depends on 21)

The vehicle of claim 21, wherein the one or more vent holes are located to vent a gas at one or more selected locations.

### Claim 28 (depends on 27)

The vehicle of claim 27, wherein the one or more selected locations are selected to direct the gas to one or more areas where the presence, temperature and/or pressure of the gas is acceptable.

### Claim 29 (depends on 21)

The vehicle of claim 21, wherein the one or more vent holes are oriented to vent a gas in one or more selected directions.

### Claim 30 (depends on 29)

The vehicle of claim 29, wherein the one or more selected directions are selected to direct the gas to one or more areas where a presence, temperature and/or pressure of the gas is acceptable.

### Claim 31 (depends on 21)

The vehicle of claim 21, further comprising:
a primary-duct coupling attaching a first section of the primary-duct to a second section of the primary duct; and