# US 2019/0169977 A1 · Method of drilling a wellbore to a target

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0169977 A1
- Document ID: US20190169977A1
- Status: Published application
- Kind: A1
- Application number: 16/097,788
- Filed: 2017-05-11
- Published: 2019-06-06
- Earliest claimed: 2016-05-12
- Assignees: Magnetic Variation Services, LLC
- Applicants: Magnetic Variation Services, LLC
- Inventors: Stefan MAUS; Marc Ernest WILLERTH; Jarrod Shawn DEVERSE
- Web page: https://patentgrep.com/patent/US20190169977A1

## CPC

- E21B 47/022: of the borehole, e.g. using geomagnetism
- E21B 7/04: Directional drilling
- E21B 44/00: Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B 47/024: of devices in the borehole (determining slope or direction of the borehole E21B47/022)
- E21B 47/04: Measuring depth or liquid level
- E21B 47/06: Measuring temperature or pressure
- G01V 3/38: Processing data, e.g. for analysis, for interpretation, for correction
- E21B 2200/20: Computer models or simulations, e.g. for reservoirs under production, drill bits
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)

## Abstract

A method of drilling a wellbore to a target includes measuring attitudes at two adjacent survey stations along a wellbore using a downhole surveying tool. An actual change in wellbore position over a survey leg linking the two survey stations is determined. Corrections are applied to the measured attitude at one or both of the survey stations such that a modeled well path joining the survey stations reflects the determined actual change in wellbore positon between the two survey stations.

## Claims

### Claim 1

A method of drilling a wellbore to a target, comprising:
measuring attitudes at two adjacent survey stations along a wellbore using a downhole surveying tool;
determining an actual change in wellbore position over a survey leg linking the two survey stations; and
applying corrections to the measured attitude at one or both of the survey stations such that a modeled well path joining the survey stations reflects the determined actual change in wellbore position between the two survey stations.

### Claim 2 (depends on 1)

The method of claim 1, wherein determining the actual change in wellbore position comprises determining the actual change using continuous survey measurements taken at least between the two adjacent survey stations during drilling of the wellbore.

### Claim 3 (depends on 1)

The method of claim 1, wherein determining the actual change in wellbore position comprises determining the actual change using continuous inclination measurements taken at least between the two adjacent survey stations during drilling of the wellbore.

### Claim 4 (depends on 1)

The method of claim 1, wherein determining the actual change in wellbore position comprises determining the actual change using depths and toolface directions defining slide intervals during drilling of the wellbore.

### Claim 5 (depends on 1)

The method of claim 1, wherein the corrections are applied to an inclination component of the measured attitude.

### Claim 6

The method according to any preceding claim, wherein the modeled well path joining the two survey stations is a circular arc computed by a minimum curvature method.

### Claim 7 (depends on 6)

The method of claim 6, wherein the modeled well path is dependent on the attitudes at the two survey stations such that applying corrections to the measured attitude comprises applying corrections to the modeled well path.

### Claim 8 (depends on 1)

The method of claim 1, further comprising adjusting a trajectory of the wellbore using the corrected attitude and steering the wellbore using the adjusted trajectory.

### Claim 9

A method of drilling a wellbore to a target, comprising:
measuring attitudes at two adjacent survey stations along a wellbore using a downhole surveying tool;
determining an actual change in wellbore position over a survey leg linking the two adjacent survey stations; and
interpolating a notional survey station between the two adjacent survey stations, the interpolating comprising computing an attitude of the notional survey station such that two modeled well paths linking the two adjacent survey stations and notional survey station reflect the determined actual change in wellbore position over the survey leg.

### Claim 10 (depends on 9)

The method of claim 9, wherein determining the actual change in wellbore position comprises determining the actual change using continuous survey measurements taken at least between the two adjacent survey stations during drilling of the wellbore.

### Claim 11 (depends on 9)

The method of claim 9, wherein determining the actual change in wellbore position comprises determining the actual change using continuous inclination measurements taken at least between the two adjacent survey stations during drilling of the wellbore.

### Claim 12 (depends on 9)

The method of claim 9, wherein determining the actual change in wellbore position comprises determining the actual change using depths and toolface directions defining slide intervals during drilling of the wellbore.

### Claim 13 (depends on 9)

The method of claim 9, wherein the two modeled well paths linking the two adjacent survey stations and notional survey station are circular arcs computed by a minimum curvature method.

### Claim 14

A method of drilling a wellbore to a target, comprising:
measuring attitudes at least at two of consecutive first, second, and third survey stations along a wellbore using a downhole surveying tool;
determining an actual change in wellbore position between the first and third survey stations; and
applying corrections to the attitude at the second survey station such that two modeled well paths linking the three consecutive survey stations reflect the determined actual change in wellbore position between the first and third survey stations.

### Claim 15 (depends on 14)

The method of claim 14, wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the first and third survey stations using continuous survey measurements taken during drilling of the wellbore.

### Claim 16 (depends on 14)

The method of claim 14, wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the first and third survey stations using continuous inclination measurements taken during drilling of the wellbore.

### Claim 17 (depends on 14)

The method of claim 14, wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the first and third survey stations using depths and toolface directions defining slide intervals during drilling of the wellbore.

### Claim 18 (depends on 14)

The method of claim 14, wherein the third survey station is a notional survey station determined by projecting the path of the wellbore ahead of the second survey station.

### Claim 19 (depends on 18)

The method of claim 18, wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the second and third survey stations using survey data other than stationary survey measurements taken at the survey stations.

### Claim 20 (depends on 18)

The method of claim 18, wherein determining the actual change in wellbore position comprises determining the actual change in wellbore position between the second and third survey stations using depths and toolface directions defining slide intervals during drilling of the wellbore.

### Claim 21 (depends on 14)

The method of claim 14, wherein the two modeled well paths linking the three stations are circular arcs computed by a minimum curvature method.
