# US 2019/0156598 A1 · Method for predicting corrosion potential, monitoring contaminant load and optimizing corrosion maintenance

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0156598 A1
- Document ID: US20190156598A1
- Status: Published application
- Kind: A1
- Application number: 15/571,425
- Filed: 2016-03-30
- Published: 2019-05-23
- Earliest claimed: 2015-06-11
- Assignees: Sikorsky Aircraft Corporation
- Applicants: Sikorsky Aircraft Corporation
- Inventors: Carl Palmer, JR.
- Web page: https://patentgrep.com/patent/US20190156598A1

## CPC

- G07C 5/0808: {Diagnosing performance data (testing of vehicles G01M17/00; testing of electrical installation on vehicles G01R31/005)}
- B64F 5/60: Testing or inspecting aircraft components or systems
- G01N 17/006: {of metals}
- B64D 2045/0085: {Devices for aircraft health monitoring, e.g. monitoring flutter or vibration}
- G01N 17/00: Investigating resistance of materials to the weather, to corrosion, or to light
- G07C 5/006: {Indicating maintenance}
- G07C: TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- B64F: GROUND OR AIRCRAFT-CARRIER-DECK INSTALLATIONS SPECIALLY ADAPTED FOR USE IN CONNECTION WITH AIRCRAFT; DESIGNING, MANUFACTURING, ASSEMBLING, CLEANING, MAINTAINING OR REPAIRING AIRCRAFT, NOT OTHERWISE PROVIDED FOR; HANDLING, TRANSPORTING, TESTING OR INSPECTING AIRCRAFT COMPONENTS, NOT OTHERWISE PROVIDED FOR
- G01N: INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES (measuring or testing apparatus or processes other than immunoassay, involving enzymes or microorganisms C12M, C12Q)
- B64D: EQUIPMENT FOR FITTING IN OR TO AIRCRAFT; FLIGHT SUITS; PARACHUTES; ARRANGEMENT OR MOUNTING OF POWER PLANTS OR PROPULSION TRANSMISSIONS IN AIRCRAFT

## Abstract

A corrosion management method is provided and includes storing an asset fleet at a location, generating a corrosion rate stressor by reference to models for any component of an asset of the asset fleet corresponding to the location and storage practice of the asset, predicting an accumulated corrosion stressor severity from the generated corrosion rate stressor, measuring an actual corrosion rate stressor at the location and revising the models in accordance with a difference between the predicted accumulated corrosion stressor severity and the measured actual corrosion rate stressor.

## Claims

### Claim 1

A corrosion management method, comprising:
storing an asset fleet at a location;
generating a corrosion rate stressor by reference to models for any component of an asset of the asset fleet corresponding to the location and storage practice of the asset;
predicting an accumulated corrosion stressor severity from the generated corrosion rate stressor;
measuring an actual corrosion rate stressor at the location; and
revising the models in accordance with a difference between the predicted accumulated corrosion stressor severity and the measured actual corrosion rate stressor.

### Claim 2 (depends on 1)

The corrosion management method according to claim 1, wherein the generating of the corrosion rate stressor comprises:
measuring an instant relative humidity at the location over a period of time;
measuring an instant temperature at the location over the period of time; and
calculating from the measured instant relative humidity and the measured instant temperature an effective relative humidity at the location over the period of time.

### Claim 3 (depends on 2)

The corrosion management method according to claim 2, wherein the generating of the corrosion rate stressor further comprises associating the effective relative humidity with a contaminant load at the location over the period of time.

### Claim 4 (depends on 1)

The corrosion management method according to claim 1, wherein the measuring of the actual corrosion rate comprises installation of a corrosion sensor.

### Claim 5 (depends on 1)

The corrosion management method according to claim 1, wherein the predicting comprises integrating the corrosion rate stressor over time.

### Claim 6 (depends on 5)

The corrosion management method according to claim 5, further comprising testing maintenance and operations options.

### Claim 7 (depends on 1)

The corrosion management method according to claim 1, further comprising conducting a maintenance operation on the asset in accordance with a result of the measuring of the actual corrosion rate.

### Claim 8

A system for managing corrosion of an asset fleet, the system comprising:
a plurality of assets disposed at a location;
one or more corrosion sensors installed on each of the assets; and
a controller coupled to the one or more corrosion sensors of each of the assets, the controller comprising a processing unit and a non-transitory computer readable medium having instructions stored thereon, which, when executed, cause the processing unit to:
generate a corrosion rate stressor by reference to models for the location of any component of an asset of the asset fleet corresponding to the location and a storage practice of the asset,
predict an accumulated corrosion stressor severity from the generated corrosion rate stressor,
measure an actual corrosion rate stressor at the location, and
revise the models in accordance with a difference between the predicted accumulated corrosion stressor severity and the measured actual corrosion rate stressor.

### Claim 9 (depends on 8)

The system according to claim 8, wherein the generating of the corrosion rate stressor comprises:
measuring an instant relative humidity at the location over a period of time;
measuring an instant temperature at the location over the period of time; and
calculating from the measured instant relative humidity and the measured instant temperature an effective relative humidity at the location over the period of time.

### Claim 10 (depends on 9)

The system according to claim 9, wherein the generating of the corrosion rate stressor further comprises associating the effective relative humidity with a contaminant load at the location over the period of time.

### Claim 11 (depends on 8)

The system according to claim 8, wherein the measuring of the actual corrosion rate comprises installing a corrosion sensor on the material.

### Claim 12 (depends on 8)

The system according to claim 8, wherein the predicting comprises integrating the corrosion rate stressor over time.

### Claim 13 (depends on 12)

The system according to claim 12, further comprising testing maintenance and operations options.

### Claim 14 (depends on 8)

The system according to claim 8, further comprising conducting or scheduling maintenance, optimizing cleaning, asset location or storage operations on the asset in accordance with a result of the measuring of the actual corrosion stressor, or scheduling operations based on using the predictions from the system.