# US 2019/0097425 A1 · A method and system for optimizing and predicting demand response

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0097425 A1
- Document ID: US20190097425A1
- Status: Published application
- Kind: A1
- Application number: 16/083,063
- Filed: 2017-03-08
- Published: 2019-03-28
- Earliest claimed: 2016-03-08
- Assignees: Grid4C
- Applicants: Grid4C
- Inventors: Eran COHEN; Alexander ZAK; Eran SAMUNI
- Web page: https://patentgrep.com/patent/US20190097425A1

## CPC

- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- G05B 13/048: {using a predictor}
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 13/13: characterised by the transmission of data to equipment in the power network
- H02J 13/1323: {using optical fibres}
- H02J 13/14: the power network being locally controlled, e.g. home energy management systems [HEMS]
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- H02J 2105/42: Home appliances
- Y02B 70/30: Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y04S 20/00: Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- Y04S 20/242: Home appliances
- Y04S 40/12: characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S 40/124: using wired telecommunication networks or data transmission busses
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

The present invention provides a method for forecasting load and managing a control plan for households having electric appliances wherein the control plan determines the activation of the electric appliances at pre-defined control periods. The method comprises the steps of: pre-processing per meter of households historical consumption of electric appliances at control period in relation to time dependent environmental parameters and household profiles and control program parameters, creating forecast model of consumption of each controlled appliance during next control plan period based on said pre-processing enabling to simulate control program parameters according to predefined goals parameter including at least target cost or consumption, determining control plan parameters for incoming control period, based on forecast models using defined goal parameters and sending control instructions to each group member control module based on determined control plan parameters, time dependent parameters and measured environmental parameters within the household.

## Claims

### Claim 1

A method for forecasting electrical load and for managing a control plan for households having controlled appliances, wherein the control plan determines an activation of electrical appliances at pre-defined control periods, said method implemented by one or more processing devices operatively coupled to a non-transitory storage device, on which are stored modules of instruction code that when executed cause the one or more processing devices to perform:
pre-processing data of a control group of households, wherein the data includes historical consumption of electrical appliances during a control period, time dependent environmental parameters, and household profiles, and one or more of a control program parameter of a period of control and a size of group, a threshold control parameter, a user behavior parameter, and a feedback parameter of at least one user action;
responsively creating a forecast model of consumption of each controlled appliance during a subsequent control plan period;
determining, based on the forecast model, a control plan, comprising control plan output parameters, for the subsequent control plan period;
determining households to be group members to participate in the control plan; and
sending control instructions based on the control plan output parameters to each group member.

### Claim 2 (depends on 1)

The method of claim 1 wherein the electrical appliances are remote-controlled appliances and wherein the control instructions perform remote control.

### Claim 3 (depends on 1)

The method of claim 1 wherein control plan parameters include at least one of the following: the duration of the control period, the size and profile of control groups, thresholds parameters determining scheduled activation of the appliance.

### Claim 4 (depends on 1)

The method of claim 1 wherein the forecast model further enable to simulate control program parameters according to predefined goals parameters including at least target cost or target consumption;

### Claim 5 (depends on 1)

The method of claim 1 wherein the forecast model further enables the generation of the following estimates:
house consumption usage periods which exceeds predefined threshold at future time periods,
the contribution of each appliance to the total consumption based on identified correlations,
the impact of reducing consumption of specific appliance of at least one homogenous group of users on the global consumption based on estimation of user's behavior during the consumption control.

### Claim 6 (depends on 1)

The method of claim 1 wherein the pre-processing include analyzing the correlation between consumer actions and the number of consumers who have chosen to quit their participation in the demand control response plan.

### Claim 7 (depends on 1)

The method of claim 1 wherein the pre-processing includes identifying statistical correlations between identified consumer actions, time-dependent environmental conditions, and household clusters.

### Claim 8

A computer based system for forecasting load and managing a control plan for households having controlled appliances, said system comprising a non-transitory storage device and one or more processing devices operatively coupled to the storage device on which are stored modules of instruction code executable by the one or more processors:
Control plan behavior History analyzing module for pre-processing per meter of households of historical consumption of electrical appliances at control period in relation to the at least one of following:
time depended environmental parameters and household profiles;
control program parameters including at least: period of control, size of group and threshold control parameters;
user behavior parameters including feedback or non feedback of the user wherein the feedback include at least one user action during the control plan;
Forecast modeling of control plan effect module for creating forecast model of consumption of each controlled appliance during next control plan period based on said pre-processing;
Control plan activation module determining control plan parameters for incoming control period, based on forecast models, determining the group of households to participate in the control plan based on control plan output parameters; and sending control instructions to each group member control module based on determined control plan parameters, time depended parameters and measured environmental parameter within the household.

### Claim 9 (depends on 8)

The system of claim 8 further comprising appliance Control module which can apply the control plan by determining the activation of electrical appliances at pre-defined control periods.

### Claim 10 (depends on 9)

The system of claim 9 further comprising sensors for measuring appliance consumption;

### Claim 11 (depends on 8)

The system of claim 8 wherein control plan parameters include at least one of the following: the duration of the control period, the size and profile of control groups, thresholds parameters, and a schedule of activation of the appliance.

### Claim 12 (depends on 8)

The system of claim 8 wherein the forecast model further enable to simulate control program parameters according to predefined goals parameters including at least target cost or target consumption;

### Claim 13 (depends on 8)

The system of claim 8 wherein the forecast model further enables estimating:
house consumption usage periods which exceeds predefined threshold at future time periods,
the contribution of each appliance to the total consumption based on identified correlations,
the impact of reducing consumption of specific appliance of at least one homogenous group of users on the global consumption based on estimation of user's behavior during the consumption control.

### Claim 14 (depends on 8)

The system of claim 8 wherein the pre-processing includes analyzing the correlation between consumer actions and the number of consumers who have chosen to quit their participation in the demand control response plan.

### Claim 15 (depends on 8)

The system of claim 8 wherein the pre-process includes identifying statistical correlations between identified consumer actions, time-dependent environmental conditions, and household clusters
