Optimizing data backup schedules
AssigneeInternational Business Machines Corporation
InventorsMarci D. Formato, Bernhard J. Klingenberg, Steven M. Reps, Kurt A. Rybczyk, Lisa A. Shepard
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorsMarci D. Formato, Bernhard J. Klingenberg, Steven M. Reps, Kurt A. Rybczyk, Lisa A. Shepard
Estimating the term…
Backup schedule optimization is provided. Data describing a first backup schedule for a first backup server is identified. Performance metric data and workload data for a first backup server and a second backup server is collected. If a count of backup windows represented by workload data for the first backup server exceeds a data collection threshold, an updated backup schedule that offloads a pending job from the first backup server to the second backup server can be generated. The updated backup schedule is generated if a maximum average I/O threshold for the first backup server was exceeded while a minimum average I/O threshold for the second backup server was deceeded. The maximum and minimum average I/O thresholds are calculated based on respective target average I/O rates for the first and second backup servers, the target average I/O rates derived from respective perform metric data.
A method for optimizing data backup schedules, comprising:
A computer program product for optimizing data backup schedules, the computer program product comprising:
A computer system for optimizing data backup schedules, the computer system comprising:
Dependencies are inferred from the claim text.