# US 2019/0063062 A1 · Prestressed Tube Section Structure and Construction Method thereof

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0063062 A1
- Document ID: US20190063062A1
- Status: Published application
- Kind: A1
- Application number: 15/870,550
- Filed: 2018-01-12
- Published: 2019-02-28
- Earliest claimed: 2017-08-30
- Assignees: CCCC Highway Consultants Co. Ltd.
- Applicants: CCCC Highway Consultants Co., Ltd.
- Inventors: Ming LIN; Xiaodong LIU; Haiqing YIN; Yi LI; Wei LIN; Shanshui ZHOU
- Web page: https://patentgrep.com/patent/US20190063062A1

## CPC

- E04B 1/6806: {Waterstops (E04B1/6807 takes precedence)}
- E02D 29/067: Floating tunnels; Submerged bridge-like tunnels, i.e. tunnels supported by piers or the like above the water-bed (pontoons or floating bridges E01D15/14)
- E02D 29/07: Tunnels or shuttering therefor preconstructed as a whole or continuously made, and moved into place on the water-bed, e.g. into a preformed trench
- E02D 29/073: Tunnels or shuttering therefor assembled from sections individually sunk onto, or laid on, the water-bed, e.g. in a preformed trench (caisson-type sections lowered onto the water-bed E02D29/077)
- E04B 1/6801: {Fillings therefor}
- E02D 29/063: Tunnels submerged into, or built in, open water (construction or placing of caissons in general E02D23/00; joining caissons to each other under water, in general E02D25/00)
- E04B 2001/6818: {Joints with swellable parts}
- E04B: GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS (border constructions of opening in walls, floors or ceilings E06B1/00; {electromagnetic shielding H05K9/0001})
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}

## Abstract

The present application discloses a prestressed tube section structure and a construction method thereof. The prestressed tube section structure includes multiple successively connected segments. A shear-resistant structure and a water stop system are arranged between two segments; multiple prestressing tendons are arranged in the tube section along the circumferential direction of the tube section; and each prestressing tendon is communicated along the longitudinal direction of the tube section, and is partitioned into multiple sections at a position close to a segment joint. By the arrangement of the multiple successively connected segments of the present application, the shear-resistant structure and the water stop system are arranged between the two segments, so that a portion between two segments may bear a shear force and have watertightness; the arrangement of the multiple prestressing tendons in the tube section enables the multiple segments to be connected in series and spliced into a whole; in addition, each prestressing tendon is partitioned into multiple sections at the position close to each segment joint, so that the tube section has higher flexibility on the premise of not losing the overall rigidity, and the loading capacity and deformability of each segment are effectively improved; and a proper pressure is applied between two segments, so that the tube section has higher deformability to adapt to a subsea foundation bed.

## Claims

### Claim 1

A prestressed tube section structure, comprising multiple successively connected segments, a shear-resistant structure and a water stop system between two of the multiple successively connected segments, and multiple prestressing tendons in a tube section of the prestressed tube section structure along a circumferential direction of the tube section; wherein each prestressing tendon is communicated along a longitudinal direction of the tube section and is partitioned into multiple sections at a position close to a segment joint.

### Claim 2 (depends on 1)

The prestressed tube section structure according to claim 1, wherein each water stop system comprises a buried-in water stop band and an OMEGA water stop band between adjacent segment joints, and a full circle of each of the buried-in water stop band and the OMEGA water stop band is along the circumferential direction of the tube section.

### Claim 3 (depends on 2)

The prestressed tube section structure according to claim 2, wherein each shear-resistant structure comprises an inner sleeve and an outer sleeve respectively buried in concrete of adjacent segments, and the outer sleeve is at the front part of the inner sleeve in a sleeving manner.

### Claim 4 (depends on 3)

The prestressed tube section structure according to claim 3, further comprising a shock absorption layer between the contact surfaces of the inner sleeve and the outer sleeve.

### Claim 5 (depends on 4)

The prestressed tube section structure according to claim 4, wherein the shock absorption layer comprises a rubber pad between contact surfaces of the inner sleeve and the outer sleeve.

### Claim 6 (depends on 3)

The prestressed tube section structure according to claim 3, further comprising multiple welding studs on outer walls of both the inner sleeve and the outer sleeve.

### Claim 7 (depends on 1)

A construction method of the prestressed tube section structure according to claim 1, comprising:
a. binding reinforcement cages and pouring concrete;
b. carrying out prestress tensioning construction on a tube section of the prestressed tube section structure, and connecting and splicing multiple segments in series into a whole; and
c. after the tube section is installed in place underwater, carrying out section cutting on prestressing tendons of the tube section.

### Claim 8 (depends on 7)

The construction method according to claim 7, wherein binding the reinforcement cages and pouring the concrete are carried out in sequence according to the multiple segments, and the method further comprises arranging shear-resistant structures and water stop systems at segment joints.

### Claim 9 (depends on 8)

The construction method according to claim 8, wherein before pouring the concrete, the method further comprises burying cutting sleeves into prestressing tendon cutting positions close to the segment joints.

### Claim 10 (depends on 9)

The construction method according to claim 9, wherein the section cutting is carried out on the prestressing tendons with a chain saw through the cutting sleeves.

### Claim 11 (depends on 4)

The prestressed tube section structure according to claim 4, further comprising multiple welding studs on outer walls of both the inner sleeve and the outer sleeve.

### Claim 12 (depends on 5)

The prestressed tube section structure according to claim 5, further comprising multiple welding studs on outer walls of both the inner sleeve and the outer sleeve.