# US 2019/0026400 A1 · Three-dimensional modeling from point cloud data migration

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2019/0026400 A1
- Document ID: US20190026400A1
- Status: Published application
- Kind: A1
- Application number: 15/653,446
- Filed: 2017-07-18
- Published: 2019-01-24
- Earliest claimed: 2017-07-18
- Assignees: Fuscoe Engineering, Inc.
- Applicants: Fuscoe Engineering, Inc.
- Inventors: Patrick R. FUSCOE; Michael A. IJAMS; Matthew H. VEGA
- Web page: https://patentgrep.com/patent/US20190026400A1

## CPC

- G06F 30/13: Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
- G06T 17/05: Geographic models
- G06T 2207/10028: Range image; Depth image; 3D point clouds
- G06T 2207/10032: Satellite or aerial image; Remote sensing
- G06T 2207/30184: Infrastructure
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06T: IMAGE DATA PROCESSING OR GENERATION, IN GENERAL

## Abstract

The subject system provides for the generation of a three-dimensional (3D) model from point cloud data migration. In some aspects, the subject system includes defining a coordinate system in 3D model, and determining shared reference points for a project base point based on an origin point and a quasi-north point of the 3D model. The subject system also includes providing the shared reference points to a building information modeling (BIM) project, and aligning the BIM project to the project base point.

## Claims

### Claim 1

A computer-implemented method comprising:
defining a coordinate system in a three-dimensional (3D) model;
exporting reference points;
selecting an origin point;
confirming a quasi-north point;
saving shared reference points based on the origin point and the quasi-north point;
setting a project base point of a building information modeling (BIM) project based on the origin point and the quasi-north point;
setting coordinate values for survey points;
importing the saved shared reference points to the BIM project; and
aligning the BIM project to the project base point.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, wherein the origin point includes X, Y, and Z values.

### Claim 3 (depends on 2)

The computer-implemented method of claim 2, wherein setting the project base point of the BIM project comprises setting the project base point based on the X value and the Y value of the origin point.

### Claim 4 (depends on 1)

The computer-implemented method of claim 1, wherein the quasi-north point includes a point selected on a +Y axis of the 3D model.

### Claim 5 (depends on 1)

The computer-implemented method of claim 1, wherein confirming the quasi-north point comprises confirming a rotation in an XY plane of the 3D model.

### Claim 6 (depends on 1)

The computer-implemented method of claim 1, wherein saving the shared reference points comprises saving the origin point and the quasi-north point in an extensible markup language (XML) file.

### Claim 7 (depends on 6)

The computer-implemented method of claim 6, wherein importing the saved shared reference points comprises importing the XML file.

### Claim 8 (depends on 1)

The computer-implemented method of claim 1, wherein the coordinate values for the survey points are set based on the origin point.

### Claim 9 (depends on 1)

The computer-implemented method of claim 1, wherein aligning the BIM project to the project base point further comprises setting a BIM project origin point to the project base point.

### Claim 10 (depends on 1)

The computer-implemented method of claim 1, wherein aligning the BIM project to the project base point further comprises selecting a point in a +Y direction in the BIM project.

### Claim 11 (depends on 10)

The computer-implemented method of claim 10, wherein aligning the BIM project to the project base point further comprises aligning the BIM project based on the selected point in the +Y direction in the BIM project.

### Claim 12 (depends on 1)

The computer-implemented method of claim 1, further comprising confirming coordinate values of the imported reference points.

### Claim 13

A system comprising:
one or more processors; and
a computer-readable storage medium coupled to the one or more processors, the computer-readable storage medium including instructions that, when executed by the one or more processors, cause the one or more processors to:
define a coordinate system in a three-dimensional (3D) model;
export reference points;
save shared reference points based on the reference points;
set a project base point of a building information modeling (BIM) project based on the reference points;
set coordinate values for survey points;
import the saved reference points to the BIM project; and
align the BIM project to the project base point.

### Claim 14 (depends on 13)

The system of claim 13, wherein the instructions further cause the one or more processors to select an origin point.

### Claim 15 (depends on 14)

The system of claim 14, wherein the instructions further cause the one or more processors to confirm a quasi-north point.

### Claim 16 (depends on 13)

The system of claim 13, wherein the instructions further cause the one or more processors to confirm coordinate values of the imported reference points.

### Claim 17

A non-transitory computer readable storage medium coupled to a processor, the non-transitory computer readable storage medium including instructions that, when executed by the processor, cause the processor to:
define a coordinate system in a three-dimensional (3D) model;
export reference points;
set a project base point of a building information modeling (BIM) project based on the reference points;
set coordinate values for survey points;
import the saved shared reference points to the BIM project; and
align the BIM project to the project base point.

### Claim 18 (depends on 17)

The non-transitory computer readable storage medium of claim 17, wherein aligning the BIM project to the project base point further comprises setting a BIM project origin point to the project base point.

### Claim 19 (depends on 17)

The non-transitory computer readable storage medium of claim 17, wherein aligning the BIM project to the project base point further comprises selecting a point in a +Y direction in the BIM project.

### Claim 20 (depends on 17)

The non-transitory computer readable storage medium of claim 17, wherein the instructions further cause the processor to confirm coordinate values of the imported reference points.
