# US 2018/0321977 A1 · Fault representation of computing infrastructures

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2018/0321977 A1
- Document ID: US20180321977A1
- Status: Published application
- Kind: A1
- Application number: 15/772,348
- Filed: 2015-10-30
- Published: 2018-11-08
- Earliest claimed: 2015-10-30
- Assignees: Hewlett Packard Enterprise Development LP
- Applicants: Hewlett Packard Enterprise Development LP
- Inventors: David A. Moore; Zhikui Wang; Charles W. Cochran; Tahir Cader; Andrew Brown; John P. Franz; Christopher L. Holmes
- Web page: https://patentgrep.com/patent/US20180321977A1

## CPC

- G06F 9/505: {considering the load}
- G06F 9/5027: {the resource being a machine, e.g. CPUs, Servers, Terminals}
- G06F 11/0751: {Error or fault detection not based on redundancy (power supply failures G06F1/30; network fault management H04L41/06)}
- G06F 11/0769: {Readable error formats, e.g. cross-platform generic formats, human understandable formats}
- G06F 11/079: {Root cause analysis, i.e. error or fault diagnosis (in a hardware test environment G06F11/22; in a software test environment G06F11/36)}
- G06F 11/0793: {Remedial or corrective actions (recovery from an exception in an instruction pipeline G06F9/3861; by retry G06F11/1402; for recovering from a failure of a protocol instance or entity H04L69/40)}
- G06F 11/321: {Display for diagnostics, e.g. diagnostic result display, self-test user interface}
- G06F 11/008: {Reliability or availability analysis}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

In one example, a system for fault representation of computing infrastructures includes an infrastructure engine to determine a fault relationship between a first element and a second element within a computing infrastructure, wherein the fault relationship represents an ability of the first element and the second element to function, a representation engine to generate a fault representation of the computing infrastructure based on the determined fault relationship between the first element and the second element within the computing infrastructure, and a workload engine to assign workloads to the computing infrastructure based on the fault representation of the computing infrastructure.

## Claims

### Claim 1

A system for fault representation of computing infrastructures, comprising:
an infrastructure engine to determine a fault relationship between a first element and a second element within a computing infrastructure, wherein the fault relationship represents an ability of the first element and the second element to function;
a representation engine to generate a fault representation of the computing infrastructure based on the determined fault relationship between the first element and the second element within the computing infrastructure; and
a workload engine to assign workloads to the computing infrastructure based on the fault representation of the computing infrastructure.

### Claim 2 (depends on 1)

The system of claim 1, wherein the representation engine assigns a risk score to a plurality of elements that include the first element and the second element based on the fault relationship.

### Claim 3 (depends on 2)

The system of claim 2, wherein the risk score is a value that represents a possibility of direct and indirect failure of a corresponding element.

### Claim 4 (depends on 1)

The system of claim 1, wherein the fault representation of the computing infrastructure includes a visual representation of the first element and the second element in a tree structure.

### Claim 5 (depends on 4)

The system of claim 4, wherein the visual representation of the first element and the second element are selectable to display operational parameters and diagnostic information of the corresponding element.

### Claim 6 (depends on 1)

The system of claim 1, wherein the representation includes a visual representation of functionality for the first element and the second element based on real-time data.

### Claim 7 (depends on 6)

The system of claim 6, wherein the visual representation of functionality for the first element is based on a probability of failure for the first element and a probability of failure for the second element, wherein a functionality of the first element is dependent on the second element.

### Claim 8

A non-transitory computer readable medium storing instructions executable by a processor for fault representation of computing infrastructures, wherein the instructions are executable to:
determine a support infrastructure for a computing system that includes a number of elements that are utilized to provide functionality to the computing system;
generate a visual representation of a fault representation that includes the computing system connected to each of the number of elements based on how the number elements provide functionality to the computing system; and
assign workloads to the computing system based on the fault representation.

### Claim 9 (depends on 8)

The medium of claim 8, wherein the visual representation of the fault representation is organized to connect each of the number of elements to the computing device based on how the number of elements affect a functionality of the computing device.

### Claim 10 (depends on 8)

The medium of claim 8, wherein the number of elements include physical devices and virtual machines that provide the computing device a functionality to execute the workloads.

### Claim 11 (depends on 8)

The medium of claim 8, wherein the fault representation is a fault tree diagram that includes a workload as a root node.

### Claim 12

A method for fault representation of computing infrastructures, comprising:
determining a support infrastructure for a computing system that includes a number of elements that are utilized to execute a workload;
generating a visual fault representation comprising a fault tree diagram that includes the workload connected to each of the number of elements of the computing system based on how a fault of the number elements affect an execution of the workload; and
assigning the workload to a portion of the number of elements of the computing system based on the fault tree diagram.

### Claim 13 (depends on 12)

The method of claim 12, wherein assigning the workload includes determining a probability of a fault for each of the portion of the number of elements.

### Claim 14 (depends on 12)

The method of claim 12, comprising selecting a particular element from the number of elements to display a detailed diagram of the particular element.

### Claim 15 (depends on 14)

The method of claim 14, wherein the detailed diagram includes real-time data corresponding to the particular element.
