# US 2018/0321726 A1 · Datacenter power management system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2018/0321726 A1
- Document ID: US20180321726A1
- Status: Published application
- Kind: A1
- Application number: 16/038,449
- Filed: 2018-07-18
- Published: 2018-11-08
- Earliest claimed: 2016-06-30
- Assignees: Microsoft Technology Licensing, LLC
- Applicants: Microsoft Technology Licensing, LLC
- Inventors: Sean Michael James; David Thomas Gauthier; Eric Clarence Peterson; Lucas Neal Joppa; Ranveer Chandra; Teddy L. Bennett; Todd R. Rawlings; Brian A. Janous
- Web page: https://patentgrep.com/patent/US20180321726A1

## CPC

- G06F 1/266: {Arrangements to supply power to external peripherals either directly from the computer or under computer control, e.g. supply of power through the communication port, computer controlled power-strips}
- G06F 1/329: by task scheduling
- Y02D 10/00: Energy efficient computing, e.g. low power processors, power management or thermal management
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

Various methods and systems for implementing resource management for an infrastructure are provided. Resource management includes datacenter byproduct management interfaces, datacenter power management, datacenter operations optimization and infrastructure resource management. Resource management facilitates using and distributing physical resources, including incidental physical resources that are generated during operation of an infrastructure, based on a minimum threshold reserve of the physical resource associated with the operating the infrastructure. Resource management can include controlling an amount of the physical resource that is generated and an amount the physical resource that is reserved. The minimum threshold reserve in combination with the control over generating and reserving the physical resource help identify an allocable amount of the physical resource. Physical resources of an infrastructure are quantified to support resource management. Quantifying physical resources is associated with devices of the infrastructure and requests for physical resources in the infrastructure to perform different types of operations.

## Claims

### Claim 1

A datacenter power management system for managing a datacenter, comprising:
a processor; and
a memory operatively coupled to the processor, the memory containing instructions executable by the processor to cause the datacenter power management system to:
receive power device data for a device associated with the datacenter;
generate, based on the received power device data, a device instance having a plurality of attributes associated with the device, the attributes of the generated device instance including a generation capacity of units of power and reserve units of power; and
communicate, to the device, operation instructions that instruct the device to generate or reserve an amount of units of power based on at least the attributes in the generated device instance and a threshold power reserve value for operation of the datacenter.

### Claim 2 (depends on 1)

The datacenter power management system of claim 1, wherein the memory contains additional instructions executable by the processor to cause the power management system to automatically update an amount of allocable units of power based on an amount of units of power that is being generated and an amount of units of power that is reserved.

### Claim 3 (depends on 1)

The datacenter power management system of claim 1, wherein the memory contains additional instructions executable by the processor to cause the power management system to transmit power from the device to an external power consumer via the datacenter or to throttle usage of power in the datacenter such that an unused portion of power is made available for consumption by the external power consumer via the datacenter.

### Claim 4 (depends on 1)

The datacenter power management system of claim 1, wherein the memory contains additional instructions executable by the processor to cause the power management system to generate an operation instance, the operation instance comprising requested units that indicate an amount of a physical resource needed in anticipation of an operation.

### Claim 5 (depends on 1)

The datacenter power management system of claim 1, wherein the memory contains additional instructions executable by the processor to cause the power management system to:
generate a request having requested units of power; and
receive an amount of allocated units for the request based on an amount of units of power that is being generated and an amount of units of power that is reserved to ensure proper operation of the datacenter.

### Claim 6 (depends on 1)

The datacenter power management system of claim 1, wherein the memory contains additional instructions executable by the processor to cause the power management system to communicate corresponding notifications to actuate one or more physical devices within the datacenter and a power grid, respectively, to initiate processing the amount of allocated units of power.

### Claim 7 (depends on 1)

The datacenter power management system of claim 1, wherein generating and reserving power are based on corresponding electrical devices and electricity processing techniques associated with the device.

### Claim 8

A computer-implemented method for using a datacenter power management system to provide power grid management, the method comprising:
receiving power device data for a device corresponding to a datacenter;
generating, based on the received power device data, a device instance having a plurality of attributes associated with the device, the attributes of the generated device instance comprising a generation capacity of units of power and reserve units of power;
receiving, from a power consumer external to the datacenter, a request having requested units of power; and
communicating to the power consumer external to the datacenter an amount of allocated units for the request based on an amount of units of power that is being generated and an amount of units of power that is reserved based at least in part on the attributes of the generated device instance and a threshold reserve of power that ensures proper operation of the datacenter.

### Claim 9 (depends on 8)

The method of claim 8, further comprising automatically updating an amount of allocable units of power based on the amount of units of power that is being generated and the amount of units of power that is reserved.

### Claim 10 (depends on 8)

The method of claim 8, further comprising, upon receiving the request, communicating operation instructions to the device for an amount of units of power to be generated and an amount of units of power to be reserved, based at least in part on the device instance and the threshold reserve of power associated with the datacenter.

### Claim 11 (depends on 8)

The method of claim 8, further comprising transmitting, from the datacenter, the amount of allocated units of power to the power consumer external to the datacenter.

### Claim 12 (depends on 8)

The method of claim 8, further comprising throttling usage of power in the datacenter and transmitting an unused portion of power to the power consumer external to the datacenter.

### Claim 13 (depends on 8)

The method of claim 8, further comprising generating an operation instance, the operation instance comprising requested units of power needed in anticipation of an operation.

### Claim 14 (depends on 8)

The method of claim 8, further comprising communicating a notification to actuate one or more physical devices within the datacenter to initiate processing the amount of allocated units of power.

### Claim 15 (depends on 8)

The method of claim 8, wherein receiving the request includes receiving the request via an Application Programming Interface that supports a protocol for processing powers based on the device in relation to power and a reserve of power.

### Claim 16

A method for datacenter power management, the method comprising:
generating, at a remote power interface, a request having requested units of power to be provided to a power consumer external to the datacenter;
communicating the request for power to the datacenter containing device instances for power devices, the device instances individually including attributes representing a generation capacity of units of power and reserve units of power; and
receiving an amount of allocated units of power for the request from the power consumer external to the datacenter, the amount of allocated units being based on an amount of units of power that is generated and an amount of units of power that is reserved based at least in part on the attributes of the device instances and a threshold reserve of power associated with the datacenter.

### Claim 17 (depends on 16)

The method of claim 16, wherein the request is generated based on remote power device data of the power consumer external to the datacenter.

### Claim 18 (depends on 16)

The method of claim 16, further comprising communicating a notification to actuate one or more physical devices within a power grid to initiate processing the amount of allocated units of power.

### Claim 19 (depends on 18)

The method of claim 18, wherein the power grid is a smart grid that operates based on a grid connect system to opportunistically balance the power grid based on the datacenter power usage.

### Claim 20 (depends on 16)

The method of claim 16, wherein receiving the amount of allocated units of power includes receiving the amount of allocated units of power from the datacenter.
