# US 2018/0293808 A1 · Machine time usage determination system and method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2018/0293808 A1
- Document ID: US20180293808A1
- Status: Published application
- Kind: A1
- Application number: 15/480,770
- Filed: 2017-04-06
- Published: 2018-10-11
- Earliest claimed: 2017-04-06
- Assignees: Caterpillar Inc.
- Applicants: Caterpillar Inc.
- Inventors: Richard William Gogolin
- Web page: https://patentgrep.com/patent/US20180293808A1

## CPC

- G07C 5/0841: {Registering performance data (recording measured values G01D; information storage G11B)}
- E02F 9/2054: {Fleet management}
- E02F 9/267: {Diagnosing or detecting failure of vehicles}
- B60Y 2200/41: Construction vehicles, e.g. graders, excavators
- G07C: TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- E02F: DREDGING; SOIL-SHIFTING (winning peat E21C49/00)
- B60Y: INDEXING SCHEME RELATING TO ASPECTS CROSS-CUTTING VEHICLE TECHNOLOGY

## Abstract

A machine time usage determination system includes a data processing pipeline configured to receive data from a plurality of sources, a machine time usage determination program, and a controller in communication with the data processing pipeline and configured to execute the machine time usage determination program. Thus, the controller is configured to review a set of data from the data processing pipeline, and assign a current activity of a set of predetermined machine activities to a piece of equipment based on the set of data. Each activity of the set of predetermined machine activities is categorized as a productive activity or an unproductive activity. The controller is also configured to determine a probability value associated with the assigned current activity.

## Claims

### Claim 1

A machine time usage determination system, including:
a data processing pipeline configured to receive data from a plurality of sources;
a machine time usage determination program;
a controller in communication with the data processing pipeline and configured to execute the machine time usage determination program to:
review a set of data from the data processing pipeline;
assign a current activity of a set of predetermined machine activities to a piece of equipment based on the set of data, wherein each activity of the set of predetermined machine activities is categorized as a productive activity or an unproductive activity; and
determine a probability value associated with the assigned current activity.

### Claim 2 (depends on 1)

The machine time usage determination system of claim 1, wherein the plurality of sources includes machine data and site data.

### Claim 3 (depends on 2)

The machine time usage determination system of claim 2, wherein the plurality of sources further includes at least one of operator data and online public data.

### Claim 4 (depends on 1)

The machine time usage determination system of claim 1, wherein the controller is further configured to store time usage for the piece of equipment.

### Claim 5 (depends on 1)

The machine time usage determination system of claim 1, wherein the controller is further configured to resolve conflicts between the set of predetermined machine activities.

### Claim 6 (depends on 1)

The machine time usage determination system of claim 1, wherein, if the probability value is below a predetermined threshold, request operator input.

### Claim 7 (depends on 6)

The machine time usage determination system of claim 6, wherein the controller is further configured to update the machine time usage determination program based on the operator input.

### Claim 8 (depends on 1)

The machine time usage determination system of claim 1, wherein the machine time usage determination program includes a plurality of algorithms.

### Claim 9 (depends on 1)

The machine time usage determination system of claim 1, wherein the controller is further configured to modify the assigned current activity based on new data from the data processing pipeline or a modification to the machine time usage determination program.

### Claim 10 (depends on 1)

The machine time usage determination system of claim 1, wherein the data processing pipeline is configured to receive data regarding a fleet of machines at a common site.

### Claim 11 (depends on 10)

The machine time usage determination system of claim 10, wherein the common site is a mining operation, and the fleet of machines includes at least one of digging machines, loading machines, and hauling machines.

### Claim 12

A method of determining time usage using a machine time usage determination program, the method including steps of:
receiving data from a plurality of sources via a data processing pipeline;
reviewing a set of data from the data processing pipeline;
assigning a current activity of a set of predetermined machine activities to a piece of equipment based on the set of data, wherein each activity of the set of predetermined machine activities is categorized as a productive activity or an unproductive activity; and
determining a probability value associated with the assigned current activity.

### Claim 13 (depends on 12)

The method of determining time usage of claim 12, further including storing time usage for the piece of equipment.

### Claim 14 (depends on 12)

The method of determining time usage of claim 12, wherein the receiving step further includes receiving machine data and site data.

### Claim 15 (depends on 14)

The method of determining time usage of claim 14, wherein the receiving step further includes receiving operator data and online public data.

### Claim 16 (depends on 12)

The method of determining time usage of claim 12, further including resolving conflicts between the set of predetermined machine activities.

### Claim 17 (depends on 16)

The method of determining time usage of claim 16, further including updating the machine time usage determination program based on a conflict resolution.

### Claim 18 (depends on 12)

The method of determining time usage of claim 12, further including requesting operator input if the probability value is below a predetermined threshold.

### Claim 19 (depends on 18)

The method of determining time usage of claim 18, further including updating the machine time usage determination program based on the operator input.

### Claim 20 (depends on 12)

The method of determining time usage of claim 12, further including modifying the assigned current activity based on new data from the data processing pipeline or a modification to the machine time usage determination program.