Steam turbine preheating system with a steam generator
AssigneeGeneral Electric Company
InventorsGeorge Vargese Mathai, Joseph Philip Klosinski, Sanji Ekanayake, Alston Ilford Scipio, William Theadore Fisher
Life of this patent
Estimating the term…
Abstract
The present application provides a power generation system. The power generation system may include a gas turbine engine, a steam turbine, and a steam turbine preheating system. The steam turbine preheating system may include a steam generator that creates a flow of steam to preheat the steam turbine from an extraction of the gas turbine engine.
Claims20
A power generation system, comprising:
- a gas turbine engine;
- a steam turbine;
- and
- a steam turbine preheating system;
- wherein the steam turbine preheating system comprises a steam generator that creates a flow of steam to preheat the steam turbine from an extraction of the gas turbine engine.
A method of preheating a steam turbine in a power generation system, comprising:
- extracting hot combustion gases from a gas turbine to a steam generator;
- flowing feedwater to the steam generator;
- exchanging heat between the hot combustion gases and the flow of feedwater to create a flow of steam in the steam generator;
- and
- flowing the steam to the steam turbine to warm a shell of the steam turbine.
A combined cycle power generation system, comprising:
- a gas turbine engine;
- a steam turbine;
- a heat recovery steam generator;
- and
- a steam turbine preheating system;
- wherein the steam turbine preheating system comprises a steam generator that creates a flow of steam to preheat the steam turbine from an extraction of the gas turbine engine and a flow of feedwater.
Dependencies are inferred from the claim text.