# US 2018/0057024 A1 · Railcar towing systems and railcar towing methods using the same

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2018/0057024 A1
- Document ID: US20180057024A1
- Status: Published application
- Kind: A1
- Application number: 15/692,460
- Filed: 2017-08-31
- Published: 2018-03-01
- Earliest claimed: 2016-09-01
- Assignees: BNSF Railway Company
- Applicants: BNSF Railway Company
- Inventors: Sean Vosahlo
- Web page: https://patentgrep.com/patent/US20180057024A1

## CPC

- B61G 5/02: for coupling articulated trains, locomotives and tenders or the bogies of a vehicle; Coupling by means of a single coupling bar; Couplings preventing or limiting relative lateral movement of vehicles
- B61F 99/00: Subject matter not provided for in other groups of this subclass
- B61G 1/04: Operating devices therefor (B61G1/08 takes precedence)
- B61G 5/00: Couplings for special purposes not otherwise provided for
- B61F 1/10: End constructions
- B61F 1/14: Attaching or supporting vehicle body-structure
- B61G: COUPLINGS; DRAUGHT AND BUFFING APPLIANCES (vehicle connections in general B60D)
- B61F: RAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES; RAIL VEHICLES FOR USE ON TRACKS OF DIFFERENT WIDTH; PREVENTING DERAILING OF RAIL VEHICLES; WHEEL GUARDS, OBSTRUCTION REMOVERS OR THE LIKE FOR RAIL VEHICLES (for vehicles in general B60; axles or wheels B60B; vehicle tyres B60C)

## Abstract

A block, towing system, and a method for towing rail cars is provided. The block includes a first channel, a second channel, a third channel and a fourth channel. The first channel is located on a first side of the block. The second channel is located adjacent to the first channel on the first side of the block. The third channel is located on an opposite side of the block from the first channel. The fourth channel is located adjacent to the third channel on the opposite side of the block from the second channel.

## Claims

### Claim 1

A block for a railcar towing system, comprising:
a first channel located on a first side of the block;
a second channel located adjacent to the first channel on the first side of the block;
a third channel located on an opposite side of the block from the first channel; and
a fourth channel located adjacent to the third channel on the opposite side of the block from the second channel.

### Claim 2 (depends on 1)

The block of claim 1, wherein:
a first end of a tow rope from a first side frame of a first railcar is threaded through the first channel and threaded back through the second channel forming a first loop in the tow rope extending outward from the first channel and the second channel on a front side of the block, the first end extending out of the second channel on a back side of the block; and
a second end of the tow rope from a second side frame of a second railcar is threaded through the third channel and threaded back through the fourth channel forming a second loop in the tow rope extending outward from the third and fourth channels on the back side of the block, the second end extending out of the fourth channel on the front side of the block.

### Claim 3 (depends on 2)

The block of claim 2, wherein:
the first end is threaded through the second loop; and
the second end is threaded through the first loop.

### Claim 4 (depends on 3)

The block of claim 3, wherein:
when the first end is threaded through the first channel, a first arch lines up with a first marking on the first end; and
when the second end is threaded through the third channel, a third arch lines up with a second marking on the second end.

### Claim 5 (depends on 4)

The block of claim 4, wherein the first marking on the first end and the second marking on the second end indicate an amount of the tow rope to tie a knot on the block using the tow rope.

### Claim 6 (depends on 1)

The block of claim 1, further comprising:
a first spool including the first channel and third channel; and
a second spool adjacent to the first spool and including the second channel and fourth channel.

### Claim 7 (depends on 6)

The block of claim 6, wherein:
a first arch is coupled to the first spool to form the first channel,
a second arch is coupled to the second spool to form the second channel,
a third arch is coupled to the first spool to form the third channel, and
a fourth arch is coupled to the second spool to form the fourth channel.

### Claim 8

A method of towing railcars comprising:
threading a first end of a tow rope from a first side frame of a first railcar through a first channel located on a first side of a block;
threading the first end of the tow rope from a second side frame of a second railcar through a second channel forming a first loop in the tow rope, the first loop extending outward from the first channel and the second channels on a front side of the block, wherein the second channel is located adjacent to the first channel on the first side of the block;
extending the first end out of the second channel on a back side of the block;
threading a second end of the tow rope through a third channel located on an opposite side of the block from the first channel;
threading the second end of the tow rope through a fourth channel forming a second loop in the tow rope, the second loop extending outward from the third and fourth channels on the back side of the block, wherein the fourth channel is located adjacent to the third channel on the opposite side of the b lock from the second channel;
extending the second end out of the second channel on the front side of the block.

### Claim 9 (depends on 8)

The method of claim 8, wherein:
the first end is threaded through the second loop; and
the second end is threaded through the first loop.

### Claim 10 (depends on 9)

The method of claim 9, wherein:
when the first end is threaded through the first channel, a first arch lines up with a first marking on the first end; and
when the second end is threaded through the third channel, a third arch lines up with a first marking on the second end.

### Claim 11 (depends on 10)

The method of claim 10, wherein the first marking on the first end and the second marking on the second end indicate an amount of the tow rope to tie a knot on the block using the tow rope.

### Claim 12 (depends on 8)

The apparatus of claim 8, wherein the body includes a first spool including the first channel and third channel, and a second spool adjacent to the first spool and including the second channel and fourth channel.

### Claim 13 (depends on 12)

The apparatus of claim 12, wherein a first arch is coupled to the first spool to form the first channel, a second arch is coupled to the first spool to form the second channel, a third arch is coupled to the second spool to form the third channel, and a fourth arch is coupled to the second spool to form the fourth channel.

### Claim 14

A tow rope system, comprising:
a tow rope comprising:
a first end wrapped around a first side frame of a first railcar, and
a second end wrapped around a second side frame of a second railcar; and
a block structured with:
a first channel located on a first side of the block;
a second channel located adjacent to the first channel on the first side of the block;
a third channel located on an opposite side of the block from the first channel; and
a fourth channel located adjacent to the third channel on the opposite side of the block from the second channel.

### Claim 15 (depends on 14)

The system of claim 14, wherein:
a first end of a tow rope is threaded through the first channel and threaded back through the second channel forming a first loop in the tow rope extending outward from the first channel and the second channel on a front side of the block, the first end extending out of the second channel on a back side of the block; and
a second end of the tow rope is threaded through the third channel and threaded back through the fourth channel forming a second loop in the tow rope extending outward from the third and fourth channels on the back side of the block, the second end extending out of the fourth channel on the front side of the block.

### Claim 16 (depends on 15)

The system of claim 15, wherein:
the first end is threaded through the second loop; and
the second end is threaded through the first loop.

### Claim 17 (depends on 16)

The system of claim 16, wherein:
when the first end is threaded through the first channel, a first arch lines up with a first marking on the first end; and
when the second end is threaded through the third channel, a third arch lines up with a second marking on the second end.

### Claim 18 (depends on 17)

The system of claim 17, wherein the first marking on the first end and the second marking on the second end indicate an amount of the tow rope to tie a knot on the block using the tow rope.

### Claim 19 (depends on 14)

The system of claim 14, further comprising:
a first spool including the first channel and third channel; and
a second spool adjacent to the first spool and including the second channel and fourth channel.

### Claim 20 (depends on 19)

The system of claim 19, wherein:
a first arch is coupled to the first spool to form the first channel,
a second arch is coupled to the second spool to form the second channel,
a third arch is coupled to the first spool to form the third channel, and
a fourth arch is coupled to the second spool to form the fourth channel.
