# US 2018/0027439 A1 · Inter-rat measurement method, related apparatus, and measurement system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2018/0027439 A1
- Document ID: US20180027439A1
- Status: Published application
- Kind: A1
- Application number: 15/724,699
- Filed: 2017-10-04
- Published: 2018-01-25
- Earliest claimed: 2015-04-10
- Applicants: Huawei Technologies Co., Ltd.
- Inventors: Xiaobo WU
- Web page: https://patentgrep.com/patent/US20180027439A1

## CPC

- H04W 24/10: Scheduling measurement reports {; Arrangements for measurement reports}
- H04W 36/0088: {Scheduling hand-off measurements}
- H04W 48/18: Selecting a network or a communication service
- H04W 76/27: Transitions between radio resource control [RRC] states
- H04W 76/28: Discontinuous transmission [DTX]; Discontinuous reception [DRX]
- H04W 84/042: {Public Land Mobile systems, e.g. cellular systems}
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

Embodiments of the present invention provide an inter-RAT measurement method, a related apparatus, and a measurement system. The method includes: sending, by a control node in a first RAT network, a measurement control message to UE in the first RAT network, where the measurement control message is used to instruct the UE to measure signal quality of a second RAT network in a dormant period of a first C-DRX cycle; disabling, by the control node, a first inactive-period timer, where the first inactive-period timer is used to perform timing for the control node in an active period of the first C-DRX cycle; and performing, by the control node, downlink transmission for the UE in the active period of the first C-DRX cycle. The present invention is applicable to the wireless communications field.

## Claims

### Claim 1

An inter-RAT measurement method, wherein the method comprises:
sending, by a control node in a first RAT network, a measurement control message to a user equipment (UE) in the first RAT network, wherein each connected-discontinuous reception (C-DRX) cycle comprises a dormant period and an active period, and the measurement control message is used to instruct the UE to measure signal quality of a second RAT network in a dormant period of a first C-DRX cycle;
disabling, by the control node, a first inactive-period timer, wherein the first inactive-period timer is used to perform timing for the control node in an active period of the first C-DRX cycle; and
performing, by the control node, downlink transmission for the UE in the active period of the first C-DRX cycle.

### Claim 2 (depends on 1)

The method according to claim 1, before the sending, by a control node in a first RAT network, a measurement control message to UE in the first RAT network, further comprising:
determining, by the control node, that the signal quality of the second RAT network is to be measured.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the measurement control message comprises a measurement configuration parameter, and the measurement configuration parameter is used to instruct the UE to stop, in a process of measuring the signal quality of the second RAT network, measuring signal quality of the first RAT network.

### Claim 4 (depends on 1)

The method according to claim 1, after the sending, by a control node in a first RAT network, a measurement control message to UE in the first RAT network, further comprising:
sending, by the control node, an instruction message to the UE, wherein the instruction message is used to instruct the UE to disable an active-period timer and a second inactive-period timer, so that the UE enters the dormant period of the first C-DRX cycle, wherein the active-period timer and the second inactive-period timer are used to perform timing for the UE in the active period of the first C-DRX cycle.

### Claim 5 (depends on 1)

The method according to claim 1, wherein the first RAT network is a Long Term Evolution (LTE) network, the second RAT network is a second generation (2G) or third generation (3G) network, and the control node in the first RAT network is an evolved NodeB (eNB).

### Claim 6

A control node, wherein the control node is in a first RAT network, and the control node comprises a sending unit and a processing unit, wherein
the sending unit is configured to send a measurement control message to a user equipment (UE) in the first RAT network, wherein each connected-discontinuous reception (C-DRX) cycle comprises a dormant period and an active period, and the measurement control message is used to instruct the UE to measure signal quality of a second RAT network in a dormant period of a first C-DRX cycle;
the processing unit is configured to disable a first inactive-period timer, wherein the first inactive-period timer is used to perform timing for the control node in an active period of the first C-DRX cycle; and
the sending unit is further configured to perform downlink transmission for the UE in the active period of the first C-DRX cycle.

### Claim 7 (depends on 6)

The control node according to claim 6, wherein
the processing unit is further configured to: before the sending unit sends the measurement control message to the UE in the first RAT network, determine that the signal quality of the second RAT network is to be measured.

### Claim 8 (depends on 6)

The control node according to claim 6, wherein the measurement control message comprises a measurement configuration parameter, and the measurement configuration parameter is used to instruct the UE to stop, in a process of measuring the signal quality of the second RAT network, measuring signal quality of the first RAT network.

### Claim 9 (depends on 6)

The control node according to claim 6, wherein
the sending unit is further configured to send an instruction message to the UE after sending the measurement control message to the UE in the first RAT network, wherein the instruction message is used to instruct the UE to disable an active-period timer and a second inactive-period timer, so that the UE enters the dormant period of the first C-DRX cycle, wherein the active-period timer and the second inactive-period timer are used to perform timing for the UE in the active period of the first C-DRX cycle.

### Claim 10 (depends on 6)

The control node according to claim 6, wherein the first RAT network is a Long Term Evolution (LTE) network, the second RAT network is a second generation (2G) or third generation (3G) network, and the control node in the first RAT network is an evolved NodeB (eNB).

### Claim 11

A user equipment (UE), wherein the UE is in a first RAT network, and the UE comprises a receiving unit, a processing unit, and a sending unit, wherein
the receiving unit is configured to receive a measurement control message sent by a control node in the first RAT network, wherein each connected-discontinuous reception (C-DRX) cycle comprises a dormant period and an active period, and the measurement control message is used to instruct the UE to measure signal quality of a second RAT network in a dormant period of a first C-DRX cycle;
the receiving unit is further configured to receive control signaling sent by the control node, wherein the control signaling is used to instruct the UE to stop sending uplink signaling or data of the UE, and is used to instruct the UE to send uplink signaling or data of the UE after the UE sends a measurement report;
the processing unit is configured to measure the signal quality of the second RAT network in the dormant period of the first C-DRX cycle according to the measurement control message;
the processing unit is further configured to stop, according to the control signaling, sending uplink signaling or data of the UE; and
the sending unit is configured to send uplink signaling or data of the UE after sending the measurement report.

### Claim 12 (depends on 11)

The UE according to claim 11, wherein the first RAT network is a Long Term Evolution (LTE) network, the second RAT network is a second generation (2G) or third generation (3G) network, and the control node in the first RAT network is an evolved NodeB (eNB).
