# US 2018/0026478 A1 · Audit method and system and supply method and system for pv power injection and consumption in a power grid system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2018/0026478 A1
- Document ID: US20180026478A1
- Status: Published application
- Kind: A1
- Application number: 15/520,904
- Filed: 2015-06-10
- Published: 2018-01-25
- Earliest claimed: 2014-10-23
- Assignees: Sun Electric Pte. Ltd
- Applicants: Sun Electric Pte. Ltd.
- Inventors: Matthew PELOSO
- Web page: https://patentgrep.com/patent/US20180026478A1

## CPC

- G06Q 50/06: Energy or water supply
- G05B 19/042: using digital processors (G05B19/05 takes precedence)
- G06N 7/01: Probabilistic graphical models, e.g. probabilistic networks
- G06Q 20/102: {Bill distribution or payments}
- G06Q 20/145: {Payments according to the detected use or quantity}
- H02J 3/00: Circuit arrangements for AC mains or AC distribution networks
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/28: Arrangements for balancing of the load in networks by storage of energy
- H02J 3/38: Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J 3/381: {Dispersed generators}
- H02J 13/00: Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
- H02J 13/1337: {involving the use of Internet protocols}
- H02J 13/333: the equipment forming part of substations
- G05B 2219/2639: Energy management, use maximum of cheap power, keep peak load low
- H02J 2101/24: Photovoltaics
- H02J 2101/28: Wind energy
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- Y02B 70/30: Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y02E 10/56: Power conversion systems, e.g. maximum power point trackers
- Y02E 10/76: Power conversion electric or electronic aspects
- Y02E 40/70: Smart grids as climate change mitigation technology in the energy generation sector
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/12: Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
- Y04S 10/123: the energy generation units being or involving renewable energy sources
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S 20/221: General power management systems
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- Y04S 40/20: Information technology specific aspects, e.g. CAD, simulation, modelling, system security
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A method of supplying power in a power grid, a system supplying power in a power grid, a method of consolidating power injection and consumption in a power grid, a system for consolidating power injection and consumption in a power grid, a metering system for a power grid, and a metering method for a power grid. The method of supplying power in a power grid, the method comprises determining an initial forward probabilistic power supply time profile of an aggregate intermittent power source connected to the power grid; determining a target power demand time profile of at least one load connected to the power grid; and associating at least respective portions of the initial forward probabilistic power supply time profile and the target demand time profile such that a probability of supply of power from the intermittent power source to the load meets a specified criterion.

## Claims

### Claim 1

A method of supplying power in a power grid, the method comprising:
determining an initial forward probabilistic power supply time profile of an aggregate intermittent power source connected to the power grid;
determining a target power demand time profile of at least one load connected to the power grid; and
associating at least respective portions of the initial forward probabilistic power supply time profile and the target demand time profile such that a probability of supply of power from the intermittent power source to the load meets a specified criterion.

### Claim 2 (depends on 1)

The method as claimed in claim 1, further comprising generating an updated forward probabilistic power supply profile based on the associated portion of the initial forward probabilistic power supply time profile being dedicated to the load.

### Claim 3 (depends on 1)

The method as claimed in claim 1, further comprising outputting a forward probabilistic intermittent power supply contribution for the load based on the associated at least respective portions of the initial forward probabilistic power supply time profile and the target demand time profile.

### Claim 4 (depends on 1)

The method as claimed in claim 1, wherein the probability is calculated based on an expectation value of a cross-correlation of the initial forward probabilistic power supply time profile and the target demand time profile.

### Claim 5 (depends on 1)

The method as claimed in claim 1, wherein associating the at least respective portions of the forward probabilistic power supply profile and the target demand time profile is based on a priority level of the load, the method further comprising dedicating a subset of intermittent power generating facilities of the aggregated intermittent power source to the supply for a highest priority load and generating the updated forward probabilistic power supply profile based on excluding the subset.

### Claim 6 (depends on 1)

The method as claimed in claim 1, further comprising determining whether a measured supply of power from the aggregate intermittent power source to the load meets the specified criterion and generating an actual intermittent power supply contribution for the loads based on the measured supply of power.

### Claim 7 (depends on 1)

The method as claimed in claim 1, further comprising validating one or more consumer constraints associated with the loads.

### Claim 8 (depends on 1)

The method as claimed in claim 1, wherein the aggregate intermittent power source comprises one or more intermittent power generating facilities connected to the power grid.

### Claim 9 (depends on 1)

The method as claimed in claim 1, wherein the specified criterion comprises one or more of a group consisting of at least one percentage blend, at least one penetration ratio, at least one cross-correlation, and at least one correlation among a secondary source and the load.

### Claim 10

A system supplying power in a power grid, the system comprising:
means for determining an initial forward probabilistic power supply time profile of an aggregate intermittent power source connected to the power grid;
means for determining a target power demand time profile of at least one load connected to the power grid; and
means for associating at least respective portions of the initial forward probabilistic power supply time profile and the target demand time profile such that a probability of supply of power from the intermittent power source to the load meets a specified criterion.

### Claim 11 (depends on 10)

The system as claimed in claim 10, further comprising means for generating an updated forward probabilistic power supply profile based on the associated portion of the initial forward probabilistic power supply time profile being dedicated to the load.

### Claim 12 (depends on 10)

The system as claimed in claim 10, further comprising means for outputting a forward probabilistic intermittent power supply contribution for the load based on the associated at least respective portions of the initial forward probabilistic power supply time profile and the target demand time profile.

### Claim 13 (depends on 10)

The system as claimed in claim 10, wherein the probability is calculated based on an expectation value of a cross-correlation of the initial forward probabilistic power supply time profile and the target demand time profile.

### Claim 14 (depends on 10)

The system as claimed in claim 10, wherein associating the at least respective portions of the forward probabilistic power supply profile and the target demand time profile is based on a priority level of the load, the method further comprising dedicating a subset of intermittent power generating facilities of the aggregated intermittent power source to the supply for a highest priority load and generating the updated forward probabilistic power supply profile based on excluding the subset.

### Claim 15 (depends on 10)

The system as claimed in claim 10, further comprising means for determining whether a measured supply of power from the aggregate intermittent power source to the load meets the specified criterion and generating an actual intermittent power supply contribution for the loads based on the measured supply of power.

### Claim 16 (depends on 10)

The system as claimed in claim 10, further comprising means for validating one or more consumer constraints associated with the loads.

### Claim 17 (depends on 10)

The system as claimed in claim 10, wherein the aggregate intermittent power source comprises one or more intermittent power generating facilities connected to the power grid.

### Claim 18 (depends on 10)

The system as claimed in claim 10, wherein the specified criterion comprises one or more of a group consisting of at least one percentage blend, at least one penetration ratio, at least one cross-correlation, and at least one correlation among a secondary source and the load.

### Claim at position 19

19-52 (canceled)