# US 2018/0024514 A1 · Method for management and optimization of hydropower generation and consumption

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2018/0024514 A1
- Document ID: US20180024514A1
- Status: Published application
- Kind: A1
- Application number: 15/722,172
- Filed: 2017-10-02
- Published: 2018-01-25
- Earliest claimed: 2001-05-18
- Assignees: The Energy Authority, Inc.
- Applicants: The Energy Authority, Inc.
- Inventors: Zengjian Hu; John Putz; Sean J. Mackey; Yuen Y. Chan; Yohan Sutjandra; Jonah C. Tsui
- Web page: https://patentgrep.com/patent/US20180024514A1

## CPC

- H02J 3/004: {Generation forecast, e.g. methods or systems for forecasting future energy generation}
- G06Q 50/06: Energy or water supply
- H02J 3/00: Circuit arrangements for AC mains or AC distribution networks
- H02J 3/381: {Dispersed generators}
- H02J 3/466: Scheduling or selectively controlling the operation of the generators or sources, e.g. connecting or disconnecting generators to meet a demand
- H02J 2101/20: Dispersed power generation using renewable energy sources
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

An optimization and management system using a global linearization approach and mixed integer linear programming to perform the dispatch and to schedule a river system for ten days forward while subject to real world, hourly physical, biological, environmental, and recreational constraints. The optimizer system uses a combination of slack variables and stitching methods to approximate a highly nonlinear optimization problem, thereby generating realtime generation schedules to promote to the management authority.

## Claims

### Claim 1

A method for optimization and management of a serial dam hydro generation system, said method comprising the steps of:
determining a respective water volume of project water reservoir corresponding with each of multiple discrete dams comprising the serial dam hydro generation system, each dam associated with at least one hydroelectric generator in a series of hydroelectric generators comprising a multi-dam hydropower generation system and each volume is based upon a shape of a respective portion of river basin associated with each dam;
providing to a computer-based optimizer engine a set of input data related to optimizing power generation of a multi-dam hydropower generation system, the set of input data comprising:
(a) the determined respective water volume at the multiple dams comprising the multi-dam hydropower generation system combined with volume, inflow, discharge, spill and turbine flow for each respective dam comprising the hydropower generation system;
(b) time dependent generation targets for specifying an amount of power generation requested on a time dependent basis by a consumer of power generated by the hydropower generation system; and
(c) market and physical data representing forecasted power and capacity prices, load forecast, and non-load obligations for the user;
converting the set of input data (a) through (c), using the computer-based optimizer engine, from real-world metrics into a uniform metric such that the uniform metric is characterized in consistent units;
providing to the computer-based optimizer engine at least a first user adjustable penalty parameter, wherein the first user adjustable penalty parameter prioritizes a metric related to a use of at least a portion of the water volume of the serial dam hydro generation system;
compiling, using the computer-based optimizer engine, a mixed integer linear programming model based on the uniform metric;
modeling Bonneville Power Administration (BPA) environmental constraints within the computer-based optimizer engine, including constraints on discharge, turbine flow, slack variables and associated penalties;
modeling operator constraints within the computer-based optimizer engine including a dollar penalty for violating a given constraint;
modeling a daily generation target;
producing a power generation schedule including an amount of energy in megawatts that may be generated by each specific dam for the series of hydroelectric generators comprising serial dam hydro generation system, based upon the input data(a) through (c) and the mixed integer linear programming model;
generating feasibility regions based upon volume ramp environmental constraints;
allocating the daily generation target based upon a change in inflows, an effect of the user adjustable penalty parameter, and one or both of the BPA constraints and modeled operator constraints; and
controlling an amount of water that flows through turbines associated with each respective dam included in the serial dam hydro generation system, based upon the power generation schedule and feasibility regions.

### Claim 2 (depends on 1)

The method of claim 1, wherein the step of computing a set of optimized results derived from optimizing the mixed integer linear programming model in relation to a utility function further comprises the steps of:
designating the set of optimized results as a first optimization of power generation during an optimization time interval; and
deploying a stitching optimization, wherein the stitching optimization comprises the steps of:
defining a stitching period as a sub-time interval of the optimization time interval; identifying as stitching variables one or more variables that fall within the stitching period;
identifying as fixed variables each variable falling inside the optimization time interval and outside the stitching period;
introducing adjustments to the stitching variables while holding the fixed variables constant;
compiling a revised mixed integer linear programming model based on the adjustments to the stitching variables; and
computing a second optimization based on the revised mixed integer linear programming model in relation to the utility function, wherein the second optimization is optimized only for the stitching period.

### Claim 3 (depends on 1)

The method of claim 1, wherein the use of at least a portion of the water volume of the serial dam hydro generation system relates to recreational use comprising a minimum flow to maintain a navigable waterway.

### Claim 4

A method for optimization and management of a serial dam hydro generation system, said method comprising the steps of:
determining a respective water volume of project water reservoir corresponding with each of multiple discrete dams comprising the serial dam hydro generation system, each dam associated with at least one hydroelectric generator in a series of hydroelectric generators comprising a multi-dam hydropower generation system and each volume is based upon a shape of a respective portion of river basin associated with each dam;
providing to a computer-based optimizer engine a set of input data related to optimizing power generation of a multi-dam hydropower generation system, the set of input data comprising:
(a) the determined respective volume at the multiple dams comprising the multi-dam hydropower generation system combined with volume, inflow, discharge, spill and turbine flow for each respective dam comprising the hydropower generation system;
(b) time dependent generation targets for specifying an amount of power generation requested on a time dependent basis by a consumer of power generated by the hydropower generation system; and
(c) market and physical data representing forecasted power and capacity prices, load forecast, and non-load obligations for the user;
converting the set of input data (a) through (c), using the computer-based optimizer engine, from real-world metrics into a uniform metric such that the uniform metric is characterized in consistent units;
providing to the computer-based optimizer engine at least a first user adjustable penalty parameter, wherein the first user adjustable penalty parameter prioritizes a metric related to an environmental use of at least a portion of the serial dam hydro generation system;
compiling, using the computer-based optimizer engine, a mixed integer linear programming model based on the uniform metric;
modeling Bonneville Power Administration (BPA) environmental constraints within the computer-based optimizer engine, including constraints on discharge, turbine flow, slack variables and associated penalties;
modeling operator constraints within the computer-based optimizer engine including a dollar penalty for violating a given constraint;
modeling a daily generation target;
producing a power generation schedule including an amount of energy in megawatts that may be generated by each specific dam for the series of hydroelectric generators comprising serial dam hydro generation system, based upon the input data(a) through (c) and the mixed integer linear programming model;
generating feasibility regions based upon volume ramp environmental constraints;
allocating the daily generation target based upon a change in inflows, an effect of the user adjustable penalty parameter, and one or both of the BPA constraints and modeled operator constraints; and
controlling hydro parameters at each dam including an amount of water that flows through turbines associated with each respective dam included in the serial dam hydro generation system, based upon the power generation schedule and feasibility regions.

### Claim 5 (depends on 1)

The method of claim 1, wherein the step of computing a set of optimized results derived from optimizing the mixed integer linear programming model in relation to a utility function further comprises the steps of:
designating the set of optimized results as a first optimization of power generation during an optimization time interval; and
deploying a stitching optimization, wherein the stitching optimization comprises the steps of:
defining a stitching period as a sub-time interval of the optimization time interval;
identifying as stitching variables one or more variables that fall within the stitching period;
identifying as fixed variables each variable falling inside the optimization time interval and outside the stitching period;
introducing adjustments to the stitching variables while holding the fixed variables constant;
compiling a revised mixed integer linear programming model based on the adjustments to the stitching variables; and
computing a second optimization based on the revised mixed integer linear programming model in relation to the utility function, wherein the second optimization is optimized only for the stitching period.

### Claim 6 (depends on 1)

The method of claim 1, wherein the environmental use comprises supporting the spawning of a fish species, wherein the environmental use requires a minimum flow to maintain a waterway that the fish species may migrate through.

### Claim 7

A method for optimization and management of a serial dam hydro generation system, said method comprising the steps of:
determining a respective water forebay, tailwater and volume of project water reservoir corresponding with each of multiple discrete dams comprising the serial dam hydro generation system, each dam associated with at least one hydroelectric generator in a series of hydroelectric generators comprising a multi-dam hydropower generation system and each volume is based upon a shape of a respective portion of river basin associated with each dam;
providing to a computer-based optimizer engine a set of input data related to optimizing power generation of a multi-dam hydropower generation system, the set of input data comprising:
(a) the determined respective water forebay, volume and tailwater at the multiple dams comprising the multi-dam hydropower generation system combined with volume, inflow, discharge, spill and turbine flow for each respective dam comprising the hydropower generation system;
(b) time dependent generation targets for specifying an amount of power generation requested on a time dependent basis by a consumer of power generated by the hydropower generation system; and
(c) market and physical data representing forecasted power and capacity prices, load forecast, and non-load obligations for the user;
converting the set of input data (a) through (c), using the computer-based optimizer engine, from real-world metrics into a uniform metric such that the uniform metric is characterized in consistent units;
providing to the computer-based optimizer engine at least a first user adjustable penalty parameter, wherein the first user adjustable penalty parameter prioritizes a metric related to a power generation use of at least a portion of the serial dam hydro generation system;
compiling, using the computer-based optimizer engine, a mixed integer linear programming model based on the uniform metric;
modeling Bonneville Power Administration (BPA) environmental constraints within the computer-based optimizer engine, including constraints on discharge, turbine flow, slack variables and associated penalties;
modeling operator constraints within the computer-based optimizer engine including a dollar penalty for violating a given constraint;
modeling a daily generation target;
producing a power generation schedule including an amount of energy in megawatts that may be generated by each specific dam for the series of hydroelectric generators comprising serial dam hydro generation system, based upon the input data(a) through (c) and the mixed integer linear programming model;
generating feasibility regions based upon volume ramp environmental constraints;
allocating the daily generation target based upon a change in inflows, an effect of the user adjustable penalty parameter, and one or both of the BPA constraints and modeled operator constraints; and
controlling hydro parameters at each dam including an amount of water that flows through turbines associated with each respective dam included in the serial dam hydro generation system, based upon the power generation schedule and feasibility regions.

### Claim 8 (depends on 1)

The method of claim 1, wherein the step of computing a set of optimized results derived from optimizing the mixed integer linear programming model in relation to a utility function further comprises the steps of:
designating the set of optimized results as a first optimization of power generation during an optimization time interval; and
deploying a stitching optimization, wherein the stitching optimization comprises the steps of:
defining a stitching period as a sub-time interval of the optimization time interval;
identifying as stitching variables one or more variables that fall within the stitching period;
identifying as fixed variables each variable falling inside the optimization time interval and outside the stitching period;
introducing adjustments to the stitching variables while holding the fixed variables constant;
compiling a revised mixed integer linear programming model based on the adjustments to the stitching variables; and
computing a second optimization based on the revised mixed integer linear programming model in relation to the utility function, wherein the second optimization is optimized only for the stitching period.

### Claim 9 (depends on 1)

The method of claim 1, wherein the power generation use comprises optimizing a price performance for generated power, wherein the power generation use requires a timed flow to generate power at an optimal benefit.

### Claim 10 (depends on 9)

The method of claim 9, wherein the optimizing of a power generation use involves an increase of water flow through a power generating turbine at a current time and a decrease of water flow through a power generating turbine at a future time.

### Claim 11 (depends on 9)

The method of claim 9, wherein the optimizing of a power generation use involves an increase of water flow through a power generating turbine at a current time and a decrease of water flow through a power generating turbine at a future time.