# US 2018/0024000 A1 · System and method for monitoring and controlling underground drilling

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2018/0024000 A1
- Document ID: US20180024000A1
- Status: Published application
- Kind: A1
- Application number: 15/640,792
- Filed: 2017-07-03
- Published: 2018-01-25
- Earliest claimed: 2010-02-01
- Assignees: APS Technology, Inc.
- Applicants: APS Technology, Inc.
- Inventors: William Evans Turner; Mark Ellsworth Wassell
- Web page: https://patentgrep.com/patent/US20180024000A1

## CPC

- G05B 13/048: {using a predictor}
- E21B 44/00: Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B 47/00: Survey of boreholes or wells (monitoring pressure or flow of drilling fluid E21B21/08)
- G01H 1/003: {of rotating machines (G01H1/10 takes precedence)}
- G01V 9/00: Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00
- G05B 23/0243: {model based detection method, e.g. first-principles knowledge model}
- G06F 17/18: for evaluating statistical data {, e.g. average values, frequency distributions, probability functions, regression analysis (forecasting specially adapted for a specific administrative, business or logistic context G06Q10/04)}
- G05B 2219/24075: Predict control element state changes, event changes
- G05B 2219/2616: Earth moving, work machine
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G01H: MEASUREMENT OF MECHANICAL VIBRATIONS OR ULTRASONIC, SONIC OR INFRASONIC WAVES
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A system and method for monitoring underground drilling in which vibration is monitored by creating a model of the drill string using finite element techniques or finite difference techniques and (i) predicting vibration by inputting real time values of operating parameters into the model, and then adjusting the model to agree with measured vibration data, (ii) predicting the weight on bit and drill string and mud motor speeds at which resonance will occur, as well as when stick-slip will occur, so that the operator can avoid operating regimes that will result in high vibration, (iii) determining vibration and torque levels along the length of the drill string based on the measured vibration and torque at one or more locations, (iv) determining the remaining life of critical components of the drill string based on the history of the vibration to which the components have been subjected, and (v) determining the optimum drilling parameters that will avoid excessive vibration of the drill string.

## Claims

### Claim 1

A method of monitoring the operation of a drill string drilling into an earthen formation so as to form a bore hole using a drill bit, comprising the steps of:
(a) drilling a bore hole having a first diameter in said earthen formation by rotating said drill bit at a first rotary speed and applying a first weight on said bit;
(b) making a determination of the value of said first rotary speed at which said drill bit rotates;
(c) making a determination of the value of said first weight on said bit;
(d) making a determination of the value of said first diameter of said bore hole;
(d) measuring vibration in said drill string at least one predetermined location along said drill string while rotating said drill bit at said first speed and applying said first weight on said bit;
(e) using a finite element model of said drill string to predict the vibration in said drill string at said at least one predetermined location based on said determined values of said first rotary speed of said drill bit, said first weight on bit and said first bore hole diameter;
(f) comparing said measured vibration to said predicted vibration and determining the difference therebetween;
(g) revising said finite element model so as to reduce said difference between said measured vibration and said vibration predicted by said model;
(h) drilling a bore hole having a second diameter in said earthen formation by rotating said drill bit at a second rotary speed and applying a second weight on said bit;
(i) making a determination of the value of said second rotary speed at which said drill bit rotates;
(j) making a determination of the value of said second weight on said bit;
(k) making a determination of the value of said second diameter of said bore hole;
(l) using said revised finite element model of said drill string to predict the vibration in said drill string based on said determined values of said second rotary speed of said drill bit, said second weight on bit and said second bore hole diameter.

### Claim 2 (depends on 1)

The method according to claim 1, wherein said finite element model of said drill string predicts vibration based on a set of operating parameters, said set of operating parameters comprising rotary speed of said drill bit, weight on said bit, and diameter of said drill bit, and wherein the step of revising said finite element model so as to reduce said difference between said measured and predicted vibration comprises adjusting the value of a plurality of operating parameter in said set of operating parameters so as to identify an adjustment that reduces said difference between said predicted and measured vibration below a predetermined threshold.

### Claim 3 (depends on 2)

The method according to claim 2, wherein said plurality of operating parameters are adjusted one at a time so as to identify an adjustment that reduces said difference between said predicted and measured vibration below said predetermined threshold.

### Claim 4 (depends on 2)

The method according to claim 2, wherein said plurality of operating parameters are adjusted by adjusting two or more parameters at a time so as to identify an adjustment that reduces said difference between said predicted and measured vibration below said predetermined threshold.

### Claim 5 (depends on 1)

The method according to claim 1, wherein said first and second bore hole diameters are approximately equal.

### Claim 6

A method of monitoring the operation of a drill string drilling into an earthen formation so as to form a bore hole using a drill bit located in a bottom hole assembly, comprising the steps of:
a) determining the values of a plurality of operating parameters associated with said underground drilling operation by taking measurements from a plurality of sensors, at least a portion of said sensors located in said bottom hole assembly;
b) determining from said determined values of said operating parameters whether each of a plurality of predetermined symptoms of lost drilling performance are present in said drilling operation;
c) identifying the probability that each of said parameters determined to be present in said drilling operation are caused by each of a plurality of predetermined causes of lost drilling performance;
d) combining said identified probabilities for each of said predetermined causes of lost drilling performance so as to determine the most likely cause of lost drilling performance present in said drilling operation.

### Claim 7 (depends on 6)

The method according to claim 6, further comprising the step of:
e) adjusting at least one operating parameter associated with said drilling operation based on said cause of lost drilling performance determined to be most likely present in said drilling operation.

### Claim 8 (depends on 6)

The method according to claim 6, wherein said plurality of operating parameters comprises the vibration of said drill string.

### Claim 9 (depends on 10)

The method according to claim 10, wherein said plurality of operating parameters comprises the amplitude of vibration of said drill string in the axial and lateral and torsional vibratory modes.

### Claim 10 (depends on 6)

The method according to claim 6, wherein said plurality of operating parameters comprises the frequency of the vibration of said drill string.

### Claim 11 (depends on 6)

The method according to claim 6, wherein said plurality of operating parameters comprises the weight on said drill bit and the rotary speed of said drill bit.

### Claim 12 (depends on 6)

The method according to claim 6, wherein the plurality of predetermined symptoms of lost drilling performance comprises vibration of said drill string.

### Claim 13 (depends on 6)

The method according to claim 6, wherein the plurality of predetermined symptoms of lost drilling performance comprises stick-slip.

### Claim 14 (depends on 6)

The method according to claim 6, wherein the step of combining said identified probabilities for each of said predetermined causes of lost drilling performance comprises summing said identified probabilities.

### Claim 15 (depends on 6)

The method according to claim 6, wherein the step of identifying the probability that each of said parameters determined to be present in said drilling operation are caused by each of a plurality of predetermined causes of lost drilling performance comprising retrieving said probabilities from a data base in which said probabilities are stored.

### Claim 16

A non-transitory computer-readable storage medium having stored thereon computer-executable instructions for performing a method of monitoring the operation of a drill string drilling into an earthen formation so as to form a bore hole using a drill bit, the method comprising the steps of:
a) determining the values of a plurality of operating parameters associated with said underground drilling operation by taking measurements from a plurality of sensors, at least a portion of said sensors located in said bottom hole assembly;
b) determining from said determined values of said operating parameters whether each of a plurality of predetermined symptoms of lost drilling performance are present in said drilling operation;
c) identifying the probability that each of said parameters determined to be present in said drilling operation are caused by each of a plurality of predetermined causes of lost drilling performance;
d) combining said identified probabilities for each of said predetermined causes of lost drilling performance so as to determine the most likely cause of lost drilling performance present in said drilling operation.

### Claim 17 (depends on 16)

The computer-readable storage medium according to claim 16, wherein the step of identifying the probability that each of said parameters determined to be present in said drilling operation are caused by each of a plurality of predetermined causes of lost drilling performance comprising retrieving said probabilities from a data base in which said probabilities are stored.

### Claim 18

A method of monitoring the operation of a drill string drilling into an earthen formation so as to form a bore hole using a drill bit, comprising the steps of:
a) operating said drill string at a first set of operating parameters, said first set of operating parameters comprising the speed at which said drill bit rotates;
b) determining the values of said parameters in said first set of operating parameters;
c) inputting said determined values of said parameters in said first set of operating parameters into a finite element model of said drill string;
d) using said finite element model of said drill string with said inputted values of said parameters to determine at least a portion of the vibratory mode shape of said drill string when operating at said first set of operating parameters;
e) using said portion of said vibratory mode shape to determine the relationship between the amplitude of vibration at said first location to the amplitude of vibration at a second location when operating at said first set of operating parameters;
f) measuring the amplitude of vibration of said drill string at said second location when operating at said first set of operating parameters;
g) determining the amplitude of vibration of said drill string at said first location by applying to said measured vibration at said second location said relationship between the amplitude of vibration at said first location to said amplitude of vibration at a second location determined from said portion of said vibratory mode shape.

### Claim 19 (depends on 18)

The method according to claim 18, wherein using said portion of said vibratory mode shape to determine the relationship between the amplitude of vibration at said first location to the amplitude of vibration at a second location comprises determining the ratio of said amplitude of vibration at said first location to said amplitude of vibration at said second location.

### Claim 20 (depends on 19)

The method according to claim 19, wherein the step of applying to said measured vibration at said second location said relationship comprises multiplying said amplitude of vibration measured at said second location by said ratio.