# US 2018/0023382 A1 · Systems and Methods for Determining and/or Using Estimate of Drilling Efficiency

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2018/0023382 A1
- Document ID: US20180023382A1
- Status: Published application
- Kind: A1
- Application number: 15/548,645
- Filed: 2016-02-23
- Published: 2018-01-25
- Earliest claimed: 2015-02-23
- Assignees: Geoservices Equipements
- Applicants: Geoservices Equipements
- Inventors: Maurice RINGER; Jacques LESSI; Charles TOUSSAINT
- Web page: https://patentgrep.com/patent/US20180023382A1

## CPC

- E21B 47/00: Survey of boreholes or wells (monitoring pressure or flow of drilling fluid E21B21/08)
- E21B 41/00: Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B 44/00: Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B 49/003: {by analysing drilling variables or conditions (E21B49/005 takes precedence; systems specially adapted for monitoring a plurality of drilling variables or conditions E21B44/00)}
- E21B 47/13: by electromagnetic energy, e.g. radio frequency
- E21B 47/18: through the well fluid {, e.g. mud pressure pulse telemetry}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

Systems and methods are provided for estimating and/or using drilling efficiency parameters of a drilling operation. A method for estimating drilling efficiency parameters may include using a borehole assembly that includes a drill bit to drill into a geological formation. A number of measurements of weight-on-bit and torque-on-bit may be obtained during a period in which weight-on-bit and torque-on-bit are non-steady-state. The measurements of weight-on-bit and torque-on-bit may be used to estimate one or more drilling efficiency parameters relating to the drilling of the geological formation during the period.

## Claims

### Claim 1

A method for estimating drilling efficiency parameters, the method comprising:
using a borehole assembly comprising a drill bit to drill into a geological formation;
obtaining a plurality of measurements of weight-on-bit and torque-on-bit during a period in which weight-on-bit and torque-on-bit are non-steady-state;
using the plurality of measurements of weight-on-bit and torque-on-bit to estimate one or more drilling efficiency parameters relating to the drilling of the geological formation during the period.

### Claim 2 (depends on 1)

The method of claim 1, wherein the period in which weight-on-bit and torque-on-bit are non-steady-state comprises:
a drill-on period in which in which weight-on-bit and torque-on-bit increase from an off state to a steady state; or
a drill-off period in which weight-on-bit and torque-on-bit decrease from the steady state to the off state.

### Claim 3 (depends on 1)

The method of claim 1, wherein the one or more drilling efficiency parameters comprise a friction parameter of the drill bit, a friction parameter of the geological formation, or an approximation of a wear state of the drill bit, or a rock strength or any combination thereof.

### Claim 4 (depends on 1)

The method of claim 1, wherein using the plurality of measurements of weight-on-bit and torque-on-bit to estimate the one or more drilling efficiency parameters comprises generating a crossplot of the plurality of the measurements of weight-on-bit and torque-on-bit over the period and identifying a best-fit curve relating to a predetermined drilling model, wherein the one or at least one of the drilling efficiency parameters are estimated based on one or more properties of the best-fit curve.

### Claim 5 (depends on 4)

The method of claim 4, wherein the drilling efficiency parameters are estimated on the crossplot by identifying a steady-state point in the best-fit curve, wherein, beyond the steady-state point, values of weight-on-bit and torque-on-bit increase substantially linearly with respect to one another at a first slope, and using the steady-state point and the first slope to estimate values of the one or more drilling efficiency parameters.

### Claim 6 (depends on 4)

The method of claim 4, wherein the drilling model accords with the following relationships:
WOB
=
ζ


ɛ


r
b

ROP
RPM
+
A
w

ɛ


f

(
ROP
RPM
)
;
and
TOB
=
1
2

ɛ


r
b
2

ROP
RPM
+
μ


r
b

A
w

ɛ


f

(
ROP
RPM
)
;
where
WOB represents weight-on-bit,
TOB represents the torque-on-bit;
ROP represents a rate of penetration of the drill bit into the geological formation;
RPM represents a rotation speed of the drill bit;
rb represents a radius of the drill bit;
ε represents an amount of energy used to cut into the geological formation, or rock strength;
Aw represents an area of wear flat on the drill bit, or bit wear; and
ζ and μ represent friction parameters relating to friction between the drill bit and the geological formation.

### Claim 7 (depends on 1)

The method of claim 1, wherein at least part of the plurality of measurements of weight-on-bit and torque-on-bit are obtained by a downhole tool of the bottom hole assembly.

### Claim 8 (depends on 7)

The method of claim 7, wherein the plurality of measurements of weight-on-bit and torque-on-bit are obtained by the downhole tool at a sampling rate higher than an immediately available data transfer rate of a telemetry system associated with the downhole tool, and wherein the plurality of measurements of weight-on-bit and torque-on-bit are transferred to a data processing system by the telemetry system at least partly during a steady-state period of drilling over a longer time than was taken to obtain the plurality of measurements of weight-on-bit and torque-on-bit.

### Claim 9 (depends on 1)

The method of claim 1, comprising:
repeating the method during a plurality of additional periods of drilling in which weight-on-bit and torque-on-bit are non-steady-state to estimate the one or more drilling efficiency parameters at a plurality of depths; and
interpolating interim values of the one or more drilling efficiency parameters for depths between the plurality of depths to obtain a depth log of the one or more drilling efficiency parameters.

### Claim 10 (depends on 1)

The method of claim 1, comprising:
obtaining an estimation of a rock strength ε via a log performed downhole, such as a sonic log; and
estimating the drill bit wear via the drilling model and the drilling efficiency parameters determined during the non-steady state period and the rock strength determined by the downhole log.

### Claim 11 (depends on 1)

The method of claim 1, comprising:
taking additional measurements of weight on bit and/or torque on bit, and further measurements of rate of penetration (ROP) and rotation speed (RPM) during periods of drilling in which weight-on-bit and torque-on-bit are in a steady state;
comparing, at a plurality of depths and for a plurality of predetermined drill bit wear values, a value of weight on bit and/or torque on bit estimated via the drilling efficiency model with the already determined drilling efficiency parameters and measured ROP and RPM and a measured value of the weight on bit and/or torque on bit during a steady state period; and
determining an estimated drill bit wear at the plurality of depths based on the comparison.

### Claim 12 (depends on 10)

The method of claim 10, comprising:
determining a matrix of likelihoods of possible drill bit wear at a plurality of depths of the geological formation based on the comparison;
wherein determining an estimated drill bit wear at the plurality of depths is based on the matrix, and takes into account, for determining the drill bit wear at at least one depth, the drill bit wear at at least one other depth.

### Claim 13 (depends on 12)

The method of claim 12, wherein determining the estimated bit wear comprises determining a best-fit path through the matrix of likelihoods in which drill bit wear does not decrease with increasing depth.

### Claim 14

A system comprising:
a borehole assembly comprising a drill bit configured to drill into a geological formation as a weight-on-bit and a torque-on-bit is applied, wherein the drill bit wears down as the drill bit drills through depths of the geological formation to a greater extent through parts of the geological formation having a greater intrinsic energy;
a measuring assembly for obtaining a plurality of measurements of weight-on-bit and torque-on-bit, at least during a period in which weight-on-bit and torque-on-bit are non-steady-state; and
a data processing system configured to use the plurality of measurements of weight-on-bit and torque-on-bit to estimate one or more drilling efficiency parameters relating to the drilling of the geological formation during the period.

### Claim 15 (depends on 14)

The system of claim 14, wherein at least part of the measuring assembly is situated in the borehole assembly, wherein the borehole assembly also comprises a telemetry system for transferring the measurements to the data processing system, wherein the telemetry system is configured to send the measurements at least partly during a steady-state period of drilling over a longer time than was taken to obtain the plurality of measurements of weight-on-bit and torque-on-bit.
