# US 2018/0022424 A1 · Offshore material handling system and material handling method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2018/0022424 A1
- Document ID: US20180022424A1
- Status: Published application
- Kind: A1
- Application number: 15/547,191
- Filed: 2016-01-29
- Published: 2018-01-25
- Earliest claimed: 2015-01-30
- Assignees: Kværner AS
- Applicants: Kværner AS
- Inventors: Knut ENGENE; Trond GRANLI; Odd Inge STUEDAL
- Web page: https://patentgrep.com/patent/US20180022424A1

## CPC

- B63B 27/30: {Arrangement of ship-based loading or unloading equipment} for transfer at sea between ships or between ships and off-shore structures
- B63B 27/08: of winches
- B63B 27/10: of cranes
- B63B 27/12: of gantry type
- B63B 27/16: of lifts or hoists {(pilot lifts B63B27/146)}
- B63B 35/44: Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices {(construction methods for floating offshore platforms B63B75/00)}
- E02B 17/0034: {Maintenance, repair or inspection of offshore constructions}
- E02B 17/027: {steel structures (E02B17/021 takes precedence)}
- Y02E 10/727: Offshore wind turbines
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

An offshore material handling system including an offshore crane carrying vessel(4), an installation structure (1) fixed to the seabed and projecting above the sea level is described. The installation structure(1) includes a material handling distribution system on board the installation structure(1). The material handling system includes an independent platform structure(3) for temporary attachment to the installation structure(1) and temporary use on the installation structure (1) for load transfer.

## Claims

### Claim 1

An offshore material handling system comprising:
a suitable offshore crane carrying vessel;
an installation structure fixed to the seabed and projecting above the sea level, which installation structure includes a material handling distribution system on board said installation structure; and
wherein said material handling system includes a crane onboard said vessel arranged to lift an independent platform structure from said vessel and onto said installation structure for temporary attachment to said installation structure and temporary use on said installation structure.

### Claim 2 (depends on 1)

The offshore material handling system according to claim 1, wherein said material handling distribution system onboard the installation structure includes lifting appliances able to elevate or lower a load from or to said independent platform structure.

### Claim 3 (depends on 1)

The offshore material handling system according to claim 1, wherein said lifting appliances onboard the installation structure is either a gantry crane, slewing crane, alternative crane structure, winches, or other lifting appliances able to elevate or lower a load from or to different levels internally on the installation structure.

### Claim 4 (depends on 1)

The offshore material handling system according to claim 1, wherein said offshore crane carrying vessel is a supply vessel, a service vessel or any suitable vessel.

### Claim 5 (depends on 1)

The offshore material handling system according to claim 1, wherein said installation structure is either an unmanned wellhead platform (UWP), or any offshore installation fixed to the seabed.

### Claim 6 (depends on 1)

The offshore material handling system according to claim 1, wherein said independent platform structure is a corner platform structure.

### Claim 7 (depends on 1)

The offshore material handling system according to claim 1, wherein said independent platform structure is attached to the installation structure some distance above the sea level.

### Claim 8

A method for offshore material handling between an offshore crane carrying vessel and an installation structure fixed to the seabed and projecting above the sea level, which installation structure includes a material handling distribution system on board said installation structure, characterized in that said method comprises the following steps:
a) the offshore crane on said crane carrying vessel brings an independent platform structure from said vessel onto said installation structure for temporary use as a load station on said installation structure;
b) said crane on said offshore crane carrying vessel brings a load from said vessel onto said independent platform structure; and
c) said material handling distribution system brings said load to predetermined level and location on said installation structure.

### Claim 9 (depends on 8)

The method according to claim 8, wherein said method includes the following step:
d) said crane on said offshore crane carrying vessel brings a second load from said vessel onto said independent platform structure and continues according to step c) above.

### Claim 10 (depends on 8)

The method according to claim 8, wherein said method includes the following step:
e) said crane on said offshore crane carrying vessel releases and brings said independent platform structure back from said installation structure and onto said vessel.

### Claim 11 (depends on 1)

Independent platform structure for temporary attachment to said installation structure and use on said installation structure according to claim 1, wherein said independent platform structure includes attachment means in form of hooks or other fixation means to be attached onto said installation structure.

### Claim 12 (depends on 11)

The independent platform structure according to claim 11, wherein said independent platform structure includes a ladder or gangway to enable forming a walkway from said platform structure onto said installation structure.

### Claim 13 (depends on 11)

The independent platform structure according to claim 11, wherein said independent platform structure is a corner platform structure.

### Claim 14

(canceled)