# US 2018/0022420 A1 · Method for installing gantry tower crane for use in cargo tank checking

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2018/0022420 A1
- Document ID: US20180022420A1
- Status: Published application
- Kind: A1
- Application number: 15/540,118
- Filed: 2015-06-09
- Published: 2018-01-25
- Earliest claimed: 2014-12-29
- Assignees: Daewoo Shipbuilding & Marine Engineering Co., Ltd.
- Applicants: Daewoo Shipbuilding & Marine Engineering Co., Ltd.
- Inventors: Jeong Hyeong LEE; Dong Ho KIM; Ju Yi PARK; Dong Su KIM; Jin Cheol HONG
- Web page: https://patentgrep.com/patent/US20180022420A1

## CPC

- B63B 25/16: heat-insulated (insulating panelling B63B3/68; heating or cooling B63J)
- B63B 71/00: Designing vessels; Predicting their performance
- B63C 5/02: Stagings; Scaffolding; Shores or struts
- B66C 23/18: specially adapted for use in particular purposes
- B66F 11/04: for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations ({Working platforms on fork-lift trucks B66F9/127; } vehicle aspects of service vehicles B60P3/14; platforms for cleaning windows A47L3/02; devices for rescuing persons from buildings A62B1/02; liftable or lowerable platforms for use on ladders E06C7/16; maintenance travellers for bridges E01D19/10; scaffolds on an extensible sub-structure E04G1/22)
- B63B 81/00: Repairing or maintaining vessels
- B63C 2005/025: {Stagings, or scaffolding, i.e. constructions providing temporary working platforms on slipways, in building or repair docks, or inside hulls}
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)
- B63C: LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS (floating nets, floating slipways, or the like for recovering aircraft from the water B63B35/52)
- B66C: CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES ({specially adapted for lifting invalids A61G7/10;} rope, cable, or chain winding mechanisms, braking or detent devices therefor B66D; specially adapted for nuclear reactors G21)
- B66F: HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD ({invalid lifting devices A61G7/10; } mounting artificial islands on piles or like supports E02B17/00; scaffolding combined with lifting devices E04G1/22; lifting devices for sliding forms E04G11/24; lifting of buildings E04G23/06; shores or struts E04G25/00; lifts or other hoisting devices on ladders E06C7/12; props for mining E21D15/00)

## Abstract

A method for installing a gantry tower crane for use in cargo tank checking is provided. By using this method, a tower crane can be installed rapidly since tower units are lowered when assembling the tower units, the time required to install two prefabricated towers can be reduced, and all zones of the cargo tanks can be checked as baskets, and pedestrian overpasses can be installed.

## Claims

### Claim 1

A method for installing a gantry tower crane for use in cargo tank checking, the method comprising:
(a) installing an installation rail on a bottom surface of a cargo tank in a widthwise direction;
(b) movably installing a pair of mobile platforms, which are inserted into an interior of the cargo tank, on the installation rail;
(c) assembling a pair of prefabricated towers by coupling tower units to each of the mobile platforms;
(d) installing a driving rail on both ends of the installation rail in a longitudinal direction of the cargo tank; and
(e) installing a basket on each of the prefabricated towers such that the basket is movable up and down along the prefabricated tower.

### Claim 2 (depends on 1)

The method of claim 1, further comprising: (f) installing a protective cover on the floor surface of the cargo tank before step (a).

### Claim 3 (depends on 2)

The method of claim 2, wherein step (f) comprises:
(f1) installing a first protective cover at a position where the installation rail is installed in the widthwise direction of the cargo tank; and
(f2) installing a second protective cover at both ends of the first protective cover in the longitudinal direction of the cargo tank, and at a position where the driving rail is installed.

### Claim 4 (depends on 1)

The method of claim 1, further comprising: (g) installing a unit descending device in a gas dome of the cargo tank before step (a).

### Claim 5 (depends on 1)

The method of claim 1, wherein step (a) comprises:
(a1) lowering the installation rail inside the cargo tank; and
(a2) arranging installation rails, which are sequentially lowered, in a straight line and sequentially coupling the installation rails with each other.

### Claim 6 (depends on 1)

The method of claim 1, wherein step (a) comprises: (a3) installing an auxiliary installation rail such that the auxiliary installation rail is spaced apart from the installation rail in the widthwise direction of the cargo tank.

### Claim 7 (depends on 1)

The method of claim 1, wherein step (b) comprises:
(b1) seating the mobile platform on the installation rail;
(b2) engaging a pinion gear, which is mounted on the mobile platform during the seating of the mobile platform, with a rack mounted on the installation rail; and
(b3) adjusting guide rollers mounted on both side surfaces of the mobile platform such that the guide rollers make close contact with the driving rail.

### Claim 8 (depends on 1)

The method of claim 1, wherein step (c) comprises:
(c1) seating a lower truss unit on the unit descending device;
(c2) coupling at least one middle truss unit to an upper surface of the lower truss unit seated on the unit descending device;
(c3) coupling an upper truss unit to an upper end of the middle truss unit;
(c4) lowering the tower unit that has been assembled by the unit descending device; and
(c5) fixing the lower truss unit of the tower unit to a post of the mobile platform.

### Claim 9 (depends on 8)

The method of claim 8, wherein step (c3) comprises: coupling a fixing unit to an upper portion of the upper truss unit.

### Claim 10 (depends on 1)

The method of claim 1, wherein step (c) comprises: mounting an outrigger, which is able to drive along the auxiliary installation rail, on a side surface of the prefabricated tower.

### Claim 11 (depends on 1)

The method of claim 1, wherein step (e) comprises:
(e1) moving the prefabricated tower to a position of the gas dome of the cargo tank so as to install the basket on the prefabricated tower;
(e2) lowering a first frame of an up-down movement frame such that the first frame is movable along an outer surface of the prefabricated tower;
(e3) lowering a second frame of the up-down movement frame such that the second frame is movable along the outer surface of the prefabricated tower;
(e4) installing the first frame and the second frame to allow the first frame and the second frame to move up and down on an outside of the prefabricated tower; and
(e5) moving the prefabricated tower installed with the basket to the driving rail.

### Claim 12 (depends on 1)

The method of claim 1, further comprising: (h) installing a pedestrian overpass between the pair of prefabricated towers after step (e).

### Claim 13 (depends on 12)

The method of claim 12, wherein step (h) comprises:
(h1) assembling and descending the pedestrian overpass separated into a plurality of pieces;
(h2) connecting one side of the pedestrian overpass, which is inserted into the cargo tank, to one of the prefabricated towers; and
(h3) connecting an opposite side of the pedestrian overpass, which is inserted into the cargo tank, to a remaining one of the prefabricated towers.