# US 2017/0370156 A1 · Method of performing combined drilling, flushing, and cutting operations on coal seam having high gas content and prone to bursts to relieve pressure and increase permeability

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0370156 A1
- Document ID: US20170370156A1
- Status: Published application
- Kind: A1
- Application number: 15/548,060
- Filed: 2016-03-31
- Published: 2017-12-28
- Earliest claimed: 2015-11-30
- Assignees: China University of Mining and Technology
- Applicants: China University of Mining and Technology
- Inventors: Boquan LIN; TONG LIU; Yabin GAO; HE LI; Zhanbo HUANG; Rui WANG; Wei YANG
- Web page: https://patentgrep.com/patent/US20170370156A1

## CPC

- E21B 7/18: Drilling by liquid or gas jets, with or without entrained pellets (E21B7/14 takes precedence)
- E21B 7/046: {horizontal drilling (drilling with mechanical conveying means E21B7/003)}
- E21B 21/013: {by liquids}
- E21C 25/60: Slitting by jets of water or other liquid (picks with arrangement of fluid-spraying nozzles E21C35/187; distribution of spraying fluids in rotating cutter-heads E21C35/23)
- E21F 7/00: Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21C: MINING OR QUARRYING
- E21F: SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS

## Abstract

The present invention relates to a “drilling-flushing-slotting” coupled pressure relief and permeability increasing method for a high gas outburst coal seam, which is more particularly suitable for the pressure relief and permeability increasing when gas of a roadway band of the high gas outburst coal seam is pre-extracted through crossing boreholes. On the basis of the crossing borehole pre-extraction measures for the coal seam gas, the hydraulic flushing and the hydraulic slotting are reasonably combined, and a “drilling-flushing-slotting” dedicated device is utilized to implement the coupled operation of “low pressure drilling-medium pressure flushing-high pressure slotting” in a borehole, so that the coal in the pre-extraction area is deformed and moved to form network cracks, passages are provided to the desorption flow of the gas, and the gas is easier to extract. The method can enlarge the single-hole pressure relief influence range, increase the gas permeability of the coal seam, improve the gas extraction efficiency, reduce the number of pre-extraction boreholes, shorten the pre-extraction time and have good applicability to the coal seams in different occurrence states. The present invention can reduce the number of the crossing boreholes by 32.5% and can reduce the length of each crossing borehole by 42.9%, is remarkable in coal roadway regional outburst eliminating effect, and obviously increases the tunneling speed.

## Claims

### Claim 1

A “drilling-flushing-slotting” coupled pressure relief and permeability increasing method for a high gas outburst coal seam, comprising
adjusting a water inlet pressure of a water jet at different stages according to different positions where a borehole construction is carried out, wherein
when in drilling, the water jet is controlled to respectively perform a low pressure water flow drilling and a medium pressure water flow flushing;
when a drill bit is withdrawn, a high pressure water flow slotting is performed; and
the water inlet pressure is gradually released level by level according to the low pressure water flow, the medium pressure water flow and the high pressure water flow, thereby implementing the “drilling-flushing-slotting” coupled pressure relief and permeability increasing integrated method inside a crossing borehole (3); and
the method comprising the following steps:
a. arranging multiple crossing boreholes (3) to a pre-extraction area of a coal seam (2) from a floor rock roadway (1);
b. constructing the multiple crossing boreholes (3) arranged in the pre-extraction area one by one by utilizing a pressure control integrated drill bit (7), wherein when the pressure control integrated drill bit (7) does not drill to reach the coal seam (2), a low-pressure water jet of 3 to 5 MPa is utilized to assist the drilling and the slagging, so that while the drilling speed is increased, a dust-fall effect is achieved;
c. increasing the pressure of the water jet to 8 to 12 MPa when the pressure control integrated drill bit (7) drills to reach a coal seam floor (5) and enters the coal seam (2), and flushing the borehole by utilizing a medium-pressure water jet at the coal seam (2), wherein since a front portion of the pressure control integrated drill bit (7) is pressed in the drilling process, a side spray nozzle of the pressure control integrated drill bit (7) is closed under the pressure, the water jet flushes the front coal only through a front spray nozzle, as the broken coal is discharged, a pressure relief hole (9) is formed in the coal seam (2), and the internal energy of the coal is primarily released;
d. observing a coal output situation at a drilling opening,
determining an occurrence condition of the coal seam (2), and
stopping the drilling when the borehole (3) runs through the coal seam (2);
e. withdrawing the drill bit, further
increasing the water pressure of the water jet in the withdrawing process, and
adopting a high-pressure water jet of 15 to 25 MPa to cut the coal, wherein
since the front portion of the pressure control integrated drill bit (7) is not pressed,
the front spray nozzle is closed, the side spray nozzle is opened, the water jet is sprayed out only from the side spray nozzle, and a lot of hydraulic cutting slots (10) are formed in the coal seam (2) in the withdrawing process, so that the homogeneous pressure relief of the coal is realized; and
f. forming a crossing extraction borehole (11) of a particular shape after the hydraulic slotting is completed in the coal seam (2), stopping conveying high-pressure water to the pressure control integrated drill bit (7), and withdrawing the pressure control integrated drill bit (7) and a drill stem (8) from the borehole (3) while keeping rotating.
