# US 2017/0363765 A1 · Method for Minimization of Borehole Effects for Multicomponent Induction Tool

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0363765 A1
- Document ID: US20170363765A1
- Status: Published application
- Kind: A1
- Application number: 15/544,838
- Filed: 2015-02-19
- Published: 2017-12-21
- Earliest claimed: 2015-02-19
- Assignees: Halliburton Energy Services, Inc.
- Applicants: Halliburton Energy Services, Inc.
- Inventors: Junsheng Hou; John Andrew Quirein
- Web page: https://patentgrep.com/patent/US20170363765A1

## CPC

- G01V 3/28: using induction coils
- E21B 47/0228: using electromagnetic energy or detectors therefor
- E21B 47/092: by detecting magnetic anomalies
- E21B 49/00: Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- G01V 3/38: Processing data, e.g. for analysis, for interpretation, for correction
- G01V 20/00: Geomodelling in general
- E21B 47/16: through the drill string or casing {, e.g. by torsional acoustic waves}
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method to minimize borehole effects upon a multi-component induction tool within a well and borehole with water-based mud includes measuring parameters of the reservoir with the induction tool to create an array of measured components. The method further includes comparing a measured component from the array of measured components with a corresponding model component from an array of model components for a reservoir model with known parameters and no borehole effects, and determining the parameters for the reservoir based upon the comparison of the measured component and the corresponding model component.

## Claims

### Claim 1

A method to minimize borehole effects upon a multi-component induction tool within a well and borehole comprising water-based mud, the method comprising:
measuring parameters of a reservoir with the induction tool to create an array of nine measured components;
comparing a measured component from the array of measured components with a corresponding model component from an array of model components for a reservoir model with known parameters and no borehole effects; and
determining the parameters for the reservoir based upon the comparison of the measured components and the corresponding model components.

### Claim 2 (depends on 1)

The method of claim 1, wherein the comparing comprises comparing a plurality of the measured components with a corresponding plurality of the model components.

### Claim 3 (depends on 1)

The method of claim 1, wherein the comparing comprises comparing only one or some of the measured components with a corresponding only one or some of the model components.

### Claim 4 (depends on 1)

The method of claim 1, further comprising:
computing the array of model components for the reservoir model with known parameters and no borehole effects.

### Claim 5 (depends on 1)

The method of claim 1, wherein the determining comprises:
determining the parameters for the reservoir based upon the known parameters from the reservoir model if the measured component and the corresponding model component are within a predetermined range of each other;
adjusting the array of model components from the reservoir model with different known parameters and no borehole effects if the measured component and the corresponding model component are not within the predetermined range of each other; and
repeating the comparing and the adjusting until the measured component and the corresponding adjusted model component are within the predetermined range of each other.

### Claim 6 (depends on 5)

The method of claim 5, wherein the determining further comprises selecting the known parameters from the reservoir model as the parameters for the reservoir if the measured component and the corresponding model component are within the predetermined range of each other.

### Claim 7 (depends on 1)

The method of claim 1, further comprising at least one of printing and displaying on a screen the parameters for the reservoir.

### Claim 8 (depends on 1)

The method of claim 1, wherein the parameters of the reservoir comprise at least one of a horizontal formation resistivity, a vertical formation resistivity, a formation dip, and a formation azimuth.

### Claim 9 (depends on 1)

The method of claim 1 wherein a resistivity for the water-based mud is as low as about 0.1 ohm-meter.

### Claim 10 (depends on 1)

The method of claim 1, wherein the comparing comprises: comparing a combination of the measured components from the array of measured components with a corresponding combination of the model components from the array of model components.

### Claim 11 (depends on 10)

The method of claim 10, wherein the combination of the measured components and the corresponding combination of the model components comprise a linear combination.

### Claim 12 (depends on 11)

The method of claim 11, wherein the array of measured components and the array of the model components comprise a nine-component measurement, and wherein the linear combination comprises at least one of a xx-component and a yy-component combination, a xx-component and a zz-component combination, and a xz-component and a zx-component combination.

### Claim 13

A system to minimize borehole effects upon a multi-component induction tool within a well and borehole reservoir comprising water-based mud, the system comprising the multi-component induction tool, a processor, and a memory, wherein the memory stores a program comprising instructions for:
measuring parameters of the reservoir with the induction tool to create an array of measured components;
comparing a measured component from the array of measured components with a corresponding model component from an array of model components for a reservoir model with known parameters and no borehole effects; and
determining the parameters for the reservoir based upon the comparison of the measured component and the corresponding model component.

### Claim 14 (depends on 13)

The system of claim 13, wherein the comparing comprises comparing only one or some of the measured components with a corresponding only one or some of the model components.

### Claim 15 (depends on 13)

The system of claim 13, wherein the determining comprises:
selecting the known parameters from the reservoir model as the parameters for the reservoir if the measured component and the corresponding model component are within the predetermined range of each other;
adjusting the array of model components from the reservoir model with different known parameters and no borehole effects if the measured component and the corresponding model component are not within the predetermined range of each other; and
repeating the comparing and the adjusting until the measured component and the corresponding adjusted model component are within the predetermined range of each other.

### Claim 16 (depends on 13)

The system of claim 13, wherein the parameters of the reservoir comprise at least one of a horizontal formation resistivity, a vertical formation resistivity, a formation dip, and a formation azimuth.

### Claim 17 (depends on 13)

The system of claim 13, wherein the comparing comprises:
comparing a combination of the measured components from the array of measured components with a corresponding combination of the model components from the array of model components.

### Claim 18 (depends on 17)

The system of claim 17, wherein the combination of the measured components and the corresponding combination of the model components comprise a linear combination.

### Claim 19

A method to minimize borehole effects upon a multi-component induction tool within a well and borehole comprising water-based mud, the method comprising:
measuring parameters of a reservoir with the induction tool to create an array of measured components;
determining an array of model components from a reservoir model with known parameters and no borehole effects;
comparing a combination of the measured components from the array of measured components with a corresponding combination of the model components from the array of model components;
determining the parameters for the reservoir based upon the comparison of the combination of the measured components and the corresponding combination of the model components; and
outputting the parameters for the reservoir.

### Claim 20 (depends on 19)

The method of claim 19, wherein the determining comprises:
selecting the known parameters from the reservoir model as the parameters for the reservoir if the combination of the measured components and the corresponding combination of the model components are within the predetermined range of each other;
adjusting the array of model components from the reservoir model with different known parameters and no borehole effects if the combination of the measured components and the corresponding combination of the model components are not within the predetermined range of each other; and
repeating the comparing and the adjusting until the combination of the measured components and the corresponding combination of the adjusted model components are within the predetermined range of each other.
