# US 2017/0362790 A1 · Method for tackling repelling of hammering during pipe pile driving

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0362790 A1
- Document ID: US20170362790A1
- Status: Published application
- Kind: A1
- Application number: 15/479,920
- Filed: 2017-04-05
- Published: 2017-12-21
- Earliest claimed: 2016-06-21
- Assignees: PoweChina Huadong Engineering Coporation Limited
- Applicants: PoweChina Huadong Engineering Coporation Limited
- Inventors: Wenhua CHEN; Haifeng QI; Jing HOU; Zhenqiang JIANG; Caiyun HUAN; Bo JIN
- Web page: https://patentgrep.com/patent/US20170362790A1

## CPC

- E02D 7/24: Placing by using fluid jets {(prefabricated concrete piles with arrangements therefor E02D5/32)}
- E02D 5/32: with arrangements for setting {or assisting in setting} in position by fluid jets {(placing piers by using fluid jets in general E02D7/24)}
- E02D 7/28: Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes {(E02D13/08 takes precedence)}
- E02D 7/02: Placing by driving {(E02D7/18 - E02D7/24 take precedence)}
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}

## Abstract

The present invention provides a method for tackling the repelling of hammering during pipe pile driving, which is of simply structure and can be carried out easily. The technical scheme of the present invention comprises: When repelling of hammering occurs in the process of piling through a sand layer, drill holes downwardly around and/or inside the pipe pile, and jet high-pressure water to the sand layer below to cut and disturb the sand layer, which consequently decreases the soil resistance to the pipe pile and increases the driveability. The present invention is applied to geotechnical engineering.

## Claims

### Claim 1

A method for tackling repelling of hammering during pipe pile driving, comprising:
drilling holes downwardly around and/or inside the pipe pile (1) until a drill head reaches a sand layer (3) when the repelling of hammering occurs in the process of piling through the sand layer (3);
jetting high-pressure water from a plurality of drill holes (2) to cut and disturb the sand layer (3) to decrease the soil resistance to the pipe pile (1); and
cease drilling and jetting until the drill head reaches a depth of 0.5-1.0 m below the sand layer (31);
wherein the high-pressure water is jetted when the plurality of drill holes arranged around the pipe pile (1) shaft reaches a depth of 0.5-1.0 m above the sand layer (31).

### Claim 2 (depends on 1)

The method of claim 1, wherein the drilling and jetting cease until the drill head reaches a depth of 3D below a tip of the pipe pile; the D is the diameter of the pipe pile (1).

### Claim 3 (depends on 1)

The method of claim 1, wherein the high-pressure water is jetted when the plurality of drill holes arranged around the pipe pile (1) reaches 0.5-1.0 m above the sand layer (31); keep drilling and jetting until the drill head reaches the depth 3D below the pipe pile (1) tip; drilling holes inside the pipe pile (1) to 0.5-1.0 m above the sand layer (32), and start jetting high-pressure water; keep drilling and jetting until the drill head reach the depth 3D below the pipe pile (1) tip; the D is the diameter of the pipe pile (1).

### Claim 4 (depends on 1)

The method of claim 1, wherein drill holes around the pipe pile (1) to 0.5-1.0 m above the sand layer (31), and start jetting high-pressure water, keep drilling and jetting until the drill head reach the depth 3D below the pipe pile (1) tip, removing both the soil inside the pipe pile (1) and the soil in the region from the pipe pile (1) tip to the depth 3D below the pipe pile (1) tip; the D is the diameter of the pipe pile (1).

### Claim 5 (depends on 1)

The method of claim 1, wherein a water pressure from the plurality of drill holes (2) is controlled in a range of 1˜25 MPa.

### Claim 6 (depends on 1)

The method of claim 1, wherein a diameter of the plurality of drill holes (2) is 76˜108 mm.

### Claim 7 (depends on 1)

The method of claim 1, wherein more than four drill holes (2) are arranged around the pipe pile (1) shaft to fully disturb the sand layer (31); and more than five drill holes (2) are arranged inside the pipe pile (1) to fully disturb the sand layer (32).