Forecasting net load in a distributed utility grid
AssigneeGreen Power Labs Inc.
InventorsAlexandre PAVLOVSKI, Dmitriy ANICHKOV
Life of this patent
Estimating the term…
Loading patent…
AssigneeGreen Power Labs Inc.
InventorsAlexandre PAVLOVSKI, Dmitriy ANICHKOV
Estimating the term…
A method for generating a net load forecast for a utility grid, the grid including intermittent distributed energy resources and loads, comprising: defining two or more load forecast zones, each zone being associated with a load profile type and a climate zone type; assigning each of the loads to one of the zones based on the load profile and climate zone types associated with the load; assigning each of the energy resources to at least one of the zones based on the climate zone type associated with the energy resource; for each zone, generating an electrical energy consumption forecast for loads, an electric power generation forecast for energy resources, and a net load forecast from the electrical energy consumption and electric power generation forecasts; combining the net load forecast for each zone to generate the net load forecast for the grid; and, presenting the net load forecast on a display.
A method for generating a net load forecast for a utility grid, the utility grid including one or more intermittent distributed energy resources and one or more loads, the method comprising:
A net load forecasting system for generating a net load forecast for a utility grid, the utility grid including one or more intermittent distributed energy resources and one or more loads, the net load forecasting system comprising:
A method for virtually monitoring power output from non-metered distributed energy resources (“DERs”), the non-metered DERs being DERs at premises supplied by a feeder that do not have individual meters or for which access to metered data at a required temporal resolution is not available, the method comprising:
A method for forecasting load at premises in distribution grids having limited availability of or access to metering infrastructure and where load measurements and distributed energy resource (“DER”) output measurements at the premises are not available, the method comprising:
A method for forecasting load at premises in distribution grids having limited availability of or access to metering infrastructure and where only selected load measurements and distributed energy resource (“DER”) output measurements at the premises are available, the method comprising:
Dependencies are inferred from the claim text.