# US 2017/0306580 A1 · Rapid-deployment oil spill containment boom and method of deployment

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0306580 A1
- Document ID: US20170306580A1
- Status: Published application
- Kind: A1
- Application number: 15/644,852
- Filed: 2017-07-10
- Published: 2017-10-26
- Earliest claimed: 2012-04-15
- Assignees: HARBO Technologies Ltd.
- Applicants: HARBO Technologies Ltd.
- Inventors: Arnon SHANY; Boaz UR; Haim GREENBERG
- Web page: https://patentgrep.com/patent/US20170306580A1

## CPC

- E02B 15/06: Barriers therefor (E02B15/08 takes precedence){construed for applying processing agents or for collecting pollutants, e.g. absorbent}
- E02B 15/08: Devices for reducing the polluted area {with or} without {additional devices for} removing the material
- E02B 15/0807: {with stabilising elements}
- E02B 15/0878: {Air and water}
- Y02A 20/204: Keeping clear the surface of open water from oil spills
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
- Y02A: TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE

## Abstract

A rapid-deployment system for containing oil spills and similar water contaminations comprises a pre-manufactured sleeve having air-inflatable or gas-inflatable compartments and water inflatable compartments. In some embodiments uninflated sleeve is stored as a reel of sleeve material, and the deployment system, optionally mounted in a small boat, comprises a machine for inflating the air and water compartments at the site of a spill. In some embodiments, air and/or water compartments may be self-inflating.

## Claims

### Claim 1

A method for limiting the spread of a spill of floating substances spilled into water, comprising:
utilizing a deployment craft to navigate around the spill while deploying a spill-blocking boom such that said boom surrounds the spill;
releasing said boom from said deployment craft to allow it to float freely with the spill, unattached to anything.

### Claim 2 (depends on 1)

The method according to claim 1, wherein said deploying comprises deploying a boom at least 200 meters long within 15 minutes of detecting the spill.

### Claim 3 (depends on 1)

The method according to claim 1, wherein said deploying begins within 5-20 minutes of detecting the spill.

### Claim 4 (depends on 1)

The method according to claim 1, wherein said releasing comprises encircling and entirely containing the spill within 30 minutes from detecting the spill.

### Claim 5 (depends on 1)

The method according to claim 1, wherein said deploying comprises allowing at least a portion of said boom to be filled with ambient water, stabilizing the boom.

### Claim 6 (depends on 1)

The method according to claim 1, wherein said boom, when deployed, behaves as part of the body of water surrounding it.

### Claim 7 (depends on 1)

The method according to claim 1, comprising dispensing an oil-absorbing layer along with said boom.

### Claim 8 (depends on 1)

The method according to claim 1, wherein said deploying is performed by no more than two operators working on said deployment craft.

### Claim 9 (depends on 1)

The method according to claim 1, further comprising locating said boom and contained spill after said boom has drifted using a navigational aid attached to the boom.

### Claim 10 (depends on 1)

The method according to claim 1, comprising selecting said boom out of a plurality of reels stored on said deployment craft, said selecting performed according to one or more of: spill material, spill size, temperature, wind conditions, wave conditions, water conditions.

### Claim 11 (depends on 1)

The method according to claim 1, further comprising treating said spill from within an area enclosed by said boom.

### Claim 12

A boom sleeve for limiting spread of a spill of floating substances spilled into water, said boom sleeve comprising:
a plurality of segments arranged to define an elongate structure, each of said segments comprising a floatation element and a water-containing compartment;
said boom sleeve configured to form a continuous barrier that surrounds said spill and floats freely when deployed, unattached to anything.

### Claim 13 (depends on 12)

The boom sleeve according to claim 12, comprising one or more navigational aids attached to the boom.

### Claim 14 (depends on 13)

The boom sleeve according to claim 13, wherein said navigational aid is a beacon or transmitter.

### Claim 15 (depends on 12)

The boom sleeve according to claim 12, wherein said boom sleeve is shaped and sized to be stored in a compressed format on a deployment craft which is at most 10 meters length.

### Claim 16 (depends on 12)

The boom sleeve according to claim 12, wherein a cross-sectional profile of flotation compartment has a width at least 1.5 times greater than its height.

### Claim 17 (depends on 12)

The boom sleeve according to claim 12, wherein said boom sleeve is configured to form a ring around said spill which drifts along with said spill.

### Claim 18 (depends on 12)

The boom sleeve according to claim 12, wherein at least a part of the material forming said boom sleeve is visible from a distance.

### Claim 19 (depends on 18)

The boom sleeve according to claim 18, comprising color indications for estimating a length of said boom sleeve and/or a circumference of said spill.

### Claim 20 (depends on 12)

The boom sleeve according to claim 12, wherein said water-containing compartment comprises a compressed sponge suitable for absorbing water.

### Claim 21 (depends on 12)

The boom sleeve according to claim 12, wherein the ends of the sleeve comprise connectors configured to connect to each other or to connectors of additional bosom sleeve portions.