# US 2017/0293889 A1 · Method And Device For Determining An Area Cut With A Cutting Roll By At Least One Construction Machine Or Mining Machine

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0293889 A1
- Document ID: US20170293889A1
- Status: Published application
- Kind: A1
- Application number: 15/437,657
- Filed: 2017-02-21
- Published: 2017-10-12
- Earliest claimed: 2011-06-10
- Assignees: Wirtgen GmbH
- Applicants: Wirtgen GmbH
- Inventors: Sven Paulsen; Stefan Wagner; Cyrus Barimani
- Web page: https://patentgrep.com/patent/US20170293889A1

## CPC

- G06Q 10/103: {Workflow collaboration or project management}
- E01C 19/004: {Devices for guiding or controlling the machines along a predetermined path (for graders or bulldozers E02F3/841; for other soil-shifting machines E02F9/2045)}
- E01C 23/088: Rotary tools, e.g. milling drums {(for forming recesses to receive marking materials E01C23/0946)}
- E21C 35/00: Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
- G01B 21/28: for measuring areas
- G06Q 10/1091: Recording time for administrative or management purposes
- G06Q 10/1093: Calendar-based scheduling for persons or groups
- G06Q 10/1097: {using calendar-based scheduling for task assignment}
- G06Q 30/04: Billing or invoicing
- G06Q 50/08: Construction
- G07C 5/085: {using electronic data carriers}
- B60R 2300/302: combining image information with GPS information or vehicle data, e.g. vehicle speed, gyro, steering angle data
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- E01C: CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR (forming roads or like surfaces by compacting or grading snow or ice E01H)
- E21C: MINING OR QUARRYING
- G01B: MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G07C: TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- B60R: VEHICLES, VEHICLE FITTINGS, OR VEHICLE PARTS, NOT OTHERWISE PROVIDED FOR

## Abstract

In a method for determining an area milled by at least one construction machine or at least one mining machine by means of a milling drum (2) by means of working a predetermined area in several milling trajectories by at least one machine (1), determining the length of the milling trajectories along which a milling operation has taken place by evaluating the continuous machine positions, adding up the previously milled partial areas taking into account the length of the milling trajectory and the installed width of the milling drum (2), wherein the partial area currently milled along the milling trajectory is checked, either continuously or subsequently, for overlapping or multiple overlapping with any previously milled partial areas, and any partial areas which overlap are deducted, as overlapping areas, from the added-up previously milled partial areas, the total added-up partial areas milled minus the total overlapping areas established give the milled area.

## Claims

### Claim at position 1

1-15. (canceled)

### Claim 16

A method of determining a milled volume of a construction machine including a milling drum, the method comprising:
(a) milling a ground surface in a milling trajectory defined by travel of the construction machine across the ground surface;
(b) generating, with at least one sensor, data corresponding to a distance traveled by the construction machine;
(c) generating a milling depth signal corresponding to a current milling depth of the milling drum; and
(d) automatically determining the volume of material milled at least partially as a function of the data corresponding to the distance traveled and the milling depth signal.

### Claim 17 (depends on 16)

The method of claim 16, wherein steps (b), (c) and (d) are performed continuously during step (a).

### Claim 18 (depends on 16)

The method of claim 16, wherein:
step (a) includes milling the ground surface in a plurality of milling trajectories; and
step (d) further includes accounting for whether a portion of a current milling depth cross-section has been milled in a previous milling trajectory.

### Claim 19 (depends on 18)

The method of claim 18, wherein:
in step (d) the accounting further includes subtracting any overlapping milled volume of the previous milling trajectory.

### Claim 20 (depends on 18)

The method of claim 18, wherein steps (b), (c) and (d) are performed continuously during step (a).

### Claim 21 (depends on 18)

The method of claim 18, wherein step (d) is performed subsequently to step (a).

### Claim 22 (depends on 16)

The method of claim 16, wherein;
step (d) further comprises receiving in a computer located on the construction machine the data corresponding to the distance traveled and the milling depth signal, and determining with the computer the volume of material milled at least partially as a function of the data corresponding to the distance traveled and the milling depth signal.

### Claim 23 (depends on 16)

The method of claim 16, wherein:
in step (b) the sensor includes at least one GNSS receiver.

### Claim 24 (depends on 23)

The method of claim 23, wherein:
step (b) further includes using reference positioning data from a stationary GNSS receiver or a data reference service.

### Claim 25 (depends on 16)

The method of claim 16, wherein:
in step (b) the sensor includes a measuring prism associated with a total station.

### Claim 26 (depends on 16)

The method of claim 16, wherein:
step (d) further includes determining based at least in part on the milling depth signal whether a milling operation is currently taking place.

### Claim 27 (depends on 16)

The method of claim 16, wherein:
step (d) further includes determining based at least in part on a switch-on signal for the milling drum whether a milling operation is currently taking place.

### Claim 28 (depends on 16)

The method of claim 16, wherein:
step (d) further includes determining based at least in part on a switch-on signal for a transport conveyor for removal of milled material whether a milling operation is currently taking place.

### Claim 29 (depends on 16)

The method of claim 16, wherein:
step (d) further includes determining based at least in part on a signal from an engine control system whether a milling operation is currently taking place.

### Claim 30 (depends on 29)

The method of claim 29, wherein:
step (d) further includes the signal from the engine control system being representative of a torque of an engine driving the milling drum.

### Claim 31 (depends on 16)

The method of claim 16, wherein:
the current milling depth of the milling drum in step (c) is controlled via a machine control system of the construction machine.

### Claim 32

A construction machine, comprising:
a milling drum;
a sensor configured to generate data corresponding to a distance traveled by the construction machine along a milling trajectory defined by travel of the construction machine across a ground surface; and
a machine control system operatively associated with the sensor, the machine control system being configured to:
receive the data corresponding to the distance traveled;
receive a milling depth signal corresponding to a current milling depth of the milling drum; and
determine the volume of material milled at least partially as a function of the data corresponding to the distance traveled and the milling depth signal.

### Claim 33 (depends on 32)

The construction machine of claim 32, wherein the machine control system is configured to control the current milling depth of the milling drum.

### Claim 34 (depends on 32)

The construction machine of claim 32, wherein:
the sensor includes at least one GNSS receiver.

### Claim 35 (depends on 32)

The construction machine of claim 32, wherein:
the sensor includes a measuring prism associated with a total station.

### Claim 36 (depends on 32)

The construction machine of claim 32, wherein:
the sensor is configured such that the positioning data is based on at least one reference point on the construction machine.

### Claim 37 (depends on 32)

The construction machine of claim 32, wherein:
the machine control system is configured such that the determination of the volume of material milled is performed continuously during the travel of the construction machine along the milling trajectory.

### Claim 38 (depends on 32)

The construction machine of claim 32, wherein:
the machine control system is configured such that the determination of the volume of material milled includes accounting for whether a portion of a current milling depth cross-section has been milled in a previous milling trajectory.

### Claim 39 (depends on 38)

The construction machine of claim 38, wherein:
the machine control system is configured such that the accounting for whether a portion of a current milling depth cross-section has been milled in a previous milling trajectory includes subtracting any overlapping milled volume of the previous milling trajectory.

### Claim 40 (depends on 32)

The construction machine of claim 32, wherein:
the machine control system is configured such that the determination of the volume of material milled is performed subsequently to the travel of the construction machine along a plurality of milling trajectories.

### Claim 41

A construction machine, comprising:
a milling drum;
a sensor configured to generate data corresponding to a distance traveled by the construction machine along a milling trajectory defined by travel of the construction machine across a ground surface; and
a computer operatively associated with the sensor, the computer being configured to
receive the data corresponding to the distance traveled,
receive a milling depth signal corresponding to a current milling depth of the milling drum, and
determine the volume of material milled at least partially as a function of the data corresponding to the distance traveled and the milling depth signal; and
a machine control system configured to control the current milling depth of the milling drum.

### Claim 42 (depends on 41)

The construction machine of claim 41, wherein the computer is integrated in the machine control system.

### Claim 43 (depends on 41)

The construction machine of claim 41, wherein the computer is located on the construction machine.

### Claim 44 (depends on 41)

The construction machine of claim 41, wherein:
the sensor includes at least one GNSS receiver.

### Claim 45 (depends on 41)

The construction machine of claim 41, wherein:
the sensor includes a measuring prism associated with a total station.

### Claim 46 (depends on 41)

The construction machine of claim 41, wherein:
the sensor is configured such that the positioning data is based on at least one reference point on the construction machine.

### Claim 47 (depends on 41)

The construction machine of claim 41, wherein:
the computer is configured such that the determination of the volume of material milled is performed continuously during the travel of the construction machine along the milling trajectory.

### Claim 48 (depends on 41)

The construction machine of claim 41, wherein:
the computer is configured such that the determination of the volume of material milled includes accounting for whether a portion of a current milling depth cross-section has been milled in a previous milling trajectory.

### Claim 49 (depends on 48)

The construction machine of claim 48, wherein:
the computer is configured such that the accounting for whether a portion of a current milling depth cross-section has been milled in a previous milling trajectory includes subtracting any overlapping milled volume of the previous milling trajectory.

### Claim 50 (depends on 41)

The construction machine of claim 41, wherein:
the computer is configured such that the determination of the volume of material milled is performed subsequently to the travel of the construction machine along a plurality of milling trajectories.
