# US 2017/0292999 A1 · Transformer monitoring and data analysis systems and methods

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0292999 A1
- Document ID: US20170292999A1
- Status: Published application
- Kind: A1
- Application number: 15/357,766
- Filed: 2016-11-21
- Published: 2017-10-12
- Earliest claimed: 2014-03-31
- Applicants: GRID20/20, Inc.
- Inventors: Randall Turner; Michael Vandenberg; Joseph Beaudet; Qi Fan Lu
- Web page: https://patentgrep.com/patent/US20170292999A1

## CPC

- G01R 31/42: AC power supplies
- G01R 19/2513: {Arrangements for monitoring electric power systems, e.g. power lines or loads; Logging}
- G01R 21/133: by using digital technique
- G01R 31/62: Testing of transformers
- G06F 11/0796: {Safety measures, i.e. ensuring safe condition in the event of error, e.g. for controlling element}
- H02H 3/165: {for three-phase systems}
- H02H 7/04: for transformers
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H02H: EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS (indicating or signalling undesired working conditions G01R, e.g. G01R31/00, G08B; locating faults along lines G01R31/08; emergency protective devices H01H)

## Abstract

The present disclosure is a transformer monitoring system that has a transformer monitoring device that reads a measurement on at least one node of a transformer. Additionally, the system has a processor that analyzes the measurement and compares the measurement to a threshold value. In addition, the processor transmits an alert to utility personnel if the comparison indicates that the system is not operating properly.

## Claims

### Claim 1

A transformer monitoring system, comprising:
a transformer monitoring device configured for reading a measurement on at least one node of a transformer;
a processor configured to analyze the measurement and compare the measurements to a threshold value, the processor further configured for transmitting an alert to utility personnel if the comparison indicates that the system is not operating properly.

### Claim 2 (depends on 1)

The transformer monitoring system of claim 1, wherein the transformer monitoring device comprises a control box and at least one satellite unit coupled to the control box via a wire.

### Claim 3 (depends on 1)

The transformer monitoring system of claim 1, wherein the transformer monitoring device comprises at least one main unit coupled to a satellite unit via a cable.

### Claim 4 (depends on 1)

The transformer monitoring system of claim 1, wherein the processor operates in a computing device communicatively coupled to the transformer monitoring device.

### Claim 5 (depends on 4)

The transformer monitoring system of claim 4, wherein the processor is further configured for transmitting a Web page over an Internet to a user, the Web page comprising data indicative of the values analyzed.

### Claim 6 (depends on 4)

The transformer monitoring system of claim 4, wherein the processor is further configured for exporting raw data containing data indicative of a plurality of measurements made by the transformer monitoring device.

### Claim 7 (depends on 1)

The transformer monitoring system of claim 1, wherein the processor is configured for calculating high and low root mean square voltages and the processor is further configured to transmit the alert if the RMS voltages indicate that the system is not working properly.

### Claim 8 (depends on 1)

The transformer monitoring system of claim 1, wherein the measurement is a temperature and the processor is configured for determining whether the temperature is too high or too low.

### Claim 9 (depends on 1)

The transformer monitoring system of claim 1, wherein the processor calculates a power factor and the processor is configured for determining whether the calculated power factor indicates that the system is working properly.

### Claim 10 (depends on 1)

The transformer monitoring system of claim 1, wherein the processor is configured for calculating line frequency and determining if the line frequency indicates that the system is working properly.

### Claim 11 (depends on 1)

The transformer monitoring system of claim 1, wherein the processor is configured for determining if there is a power outage or power restoration.

### Claim 12 (depends on 11)

The transformer monitoring device of claim 11, wherein the processor is further configured for transmitting a notification to a utility personnel the duration of an outage.

### Claim 13

A transformer monitoring method, comprising:
reading a measurement on at least one node of a transformer;
analyzing the measurement;
comparing the measurement to a threshold value;
transmitting an alert to utility personnel if the comparison indicates that the system is not operating properly.

### Claim 14 (depends on 13)

The transformer monitoring method of claim 13, further comprising operating the processor in a computing device communicatively coupled to the transformer monitoring device.

### Claim 15 (depends on 4)

The transformer monitoring method of claim 4, further comprising:
transmitting a Web page over an Internet to a user, the Web page comprising data indicative of the measurement analyzed.

### Claim 16 (depends on 13)

The transformer monitoring method of claim 13, further comprising exporting raw data containing data indicative of a plurality of measurements made by the transformer monitoring device.

### Claim 17 (depends on 13)

The transformer monitoring method of claim 13, further comprising calculating low, high, and root mean square (RMS) voltages and transmitting the alert if the low, high and RMS voltage indicates that the system is not working properly.

### Claim 18 (depends on 13)

The transformer monitoring method of claim 13, wherein the measurement is a temperature, further comprising determining whether the temperature is too high or too low.

### Claim 19 (depends on 13)

The transformer monitoring method of claim 13, further comprising calculating a power factor and determining whether the calculated power factor indicates that the system is working properly.

### Claim 20 (depends on 13)

The transformer monitoring method of claim 13, further comprising calculating line frequency and determining if the line frequency indicates that the system is working properly.

### Claim 21 (depends on 13)

The transformer monitoring method of claim 13, further comprising determining if there is a power outage or power restoration.

### Claim 22 (depends on 21)

The transformer monitoring method of claim 21, further comprising transmitting a notification to a utility personnel the duration of an outage.
