# US 2017/0292334 A1 · Slingshot side saddle substructure

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0292334 A1
- Document ID: US20170292334A1
- Status: Published application
- Kind: A1
- Application number: 15/623,143
- Filed: 2017-06-14
- Published: 2017-10-12
- Earliest claimed: 2013-02-13
- Assignees: Nabors Drilling USA
- Applicants: Nabors Drilling USA, LP
- Inventors: Padira REDDY; Ashish GUPTA
- Web page: https://patentgrep.com/patent/US20170292334A1

## CPC

- E21B 15/003: {adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells}
- E21B 19/14: Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole (E21B19/20, E21B19/22 take precedence)
- E21B 21/065: {Separating solids from drilling fluids}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

The drilling rig includes a first substructure and a second substructure. The second substructure is positioned generally parallel to and spaced apart from the first substructure and generally the same height as the first substructure. The drilling rig further includes a drill floor coupled to the first and second substructures, where the drill floor positioned substantially at the top of the first and second substructures.

## Claims

### Claim 1

A land based drilling rig comprising:
a first and second lower box, the lower boxes positioned generally parallel and spaced apart from each other;
a drill floor coupled to the first lower box by a first strut, the first lower box and first strut defining a first substructure, the drill floor coupled to the second lower box by a second strut, the second lower box and second strut defining a second substructure, the struts hingedly coupled to the drill floor and hingedly coupled to the corresponding lower box such that the drill floor may pivot between an upright and a lowered position, the drill floor including a V-door, the V-door oriented perpendicularly to a long axis of one of the substructures; and
a first and second hydraulic cylinder, the first and second hydraulic cylinders connected to the drill floor and the lower box.

### Claim 2 (depends on 1)

The land based drilling rig of claim 1, further comprising a mast coupled to the drill floor.

### Claim 3 (depends on 2)

The land based drilling rig of claim 2, wherein the mast further comprises a V-door side and wherein the V-door side of the mast faces the first or second substructure.

### Claim 4 (depends on 1)

The land based drilling rig of claim 1, further comprising a tank support substructure coupled to the first or second substructure.

### Claim 5 (depends on 4)

The land based drilling rig of claim 4, wherein the tank support substructure further comprises a tank.

### Claim 6 (depends on 5)

The land based drilling rig of claim 5, wherein the tank is a mud tank.

### Claim 7 (depends on 4)

The land based drilling rig of claim 4, wherein the tank support substructure further comprises mud process equipment.

### Claim 8 (depends on 7)

The land based drilling rig of claim 7, wherein the mud process equipment comprises at least one of a shaker or a filter.

### Claim 9 (depends on 1)

The land based drilling rig of claim 1, further comprising a grasshopper positioned to carry cabling and lines to the drilling rig, the grasshopper positioned to couple to the drill floor generally at a side of the drill floor, and the side of the drill floor to which the grasshopper couples is oriented perpendicularly to a long axis of the first or second substructure.

### Claim 10 (depends on 1)

The land based drilling rig of claim 1, wherein the first and second substructures are adapted to be traveled through a wellsite.

### Claim 11 (depends on 1)

The land based drilling rig of claim 1, further comprising a choke manifold.

### Claim 12 (depends on 1)

The land based drilling rig of claim 1, further comprising an accumulator.

### Claim 13 (depends on 12)

The land based drilling rig of claim 12, wherein the accumulator comprises a Koomey Unit.

### Claim 14 (depends on 1)

The land based drilling rig of claim 1, further comprising one or more of a drill line spooler, an HPU, a VFD, a driller's cabin, hydraulic unit, trip tank, process tank, or mud gas separator adapted to be traveled with the land based drilling rig.

### Claim 15

(canceled)

### Claim 16 (depends on 14)

The land based drilling rig of claim 14, wherein the drill line spooler, HPU, VFD, driller's cabin, hydraulic unit, trip tank, process tank, or mud gas separator is mounted directly to the first substructure or second substructure.

### Claim 17 (depends on 1)

The land based drilling rig of claim 1, further comprising a diagonal coupled between the drill floor and the lower boxes.

### Claim 18

A method comprising:
positioning a first and second lower box generally parallel and spaced apart from each other;
coupling a drill floor to the first lower box by a first strut, the first lower box and first strut defining a first substructure, the drill floor including a V-door, the V-door oriented perpendicularly to a long axis of one of the substructures;
coupling the drill floor to the second lower box by a second strut, the second lower box and second strut defining a second substructure, the struts hingedly coupled to the drill floor and hingedly coupled to the corresponding lower box;
pivoting the drill floor between an upright and a lowered position using a first and second hydraulic cylinders, the first and second hydraulic cylinders connected to the lower box.

### Claim 19 (depends on 18)

The method of claim 18 further comprising:
pivoting the drill floor between the lowered position and the upright position using the first and second hydraulic cylinders.

### Claim 20 (depends on 19)

The method of claim 19 further comprising after the step of pivoting the drill floor between the lowered position and the upright position:
coupling a diagonal between the drill floor and the lower boxes.

### Claim 21 (depends on 18)

The method of claim 18, further comprising coupling a mast to the drill floor.

### Claim 22 (depends on 21)

The method of claim 21, wherein the mast further comprises a V-door side and wherein the V-door side of the mast is oriented perpendicularly to a long axis of one of the substructures.

### Claim 23 (depends on 18)

The method of claim 18, further comprising coupling a tank support substructure to the first or second substructure.

### Claim 24 (depends on 23)

The method of claim 23, wherein the tank support substructure further comprises a tank.

### Claim 25 (depends on 24)

The method of claim 24, wherein the tank is a mud tank.

### Claim 26 (depends on 23)

The method of claim 23, wherein the tank support substructure further comprises mud process equipment.

### Claim 27 (depends on 26)

The method of claim 26, wherein the mud process equipment comprises at least one of a shaker or a filter.

### Claim 28 (depends on 18)

The method of claim 18, further comprising positioning a grasshopper to carry cabling and lines to the drilling rig, the grasshopper positioned to couple to the drill floor generally at a side of the drill floor, and the side of the drill floor to which the grasshopper couples oriented perpendicularly to a long axis of the first or second substructure.

### Claim 29 (depends on 18)

The method of claim 18, further comprising traveling the first and second substructures through a wellsite.

### Claim 30 (depends on 18)

The method of claim 18, further comprising traveling one or more of an accumulator, choke manifold, drill line spooler, HPU, VFD, driller's cabin, hydraulic unit, trip tank, process tank, or mud gas separator with the first and second substructures.