# US 2017/0288599 A1 · Automated commissioning and inspection for pv systems

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0288599 A1
- Document ID: US20170288599A1
- Status: Published application
- Kind: A1
- Application number: 15/087,594
- Filed: 2016-03-31
- Published: 2017-10-05
- Earliest claimed: 2016-03-31
- Assignees: SunPower Corporation
- Applicants: SunPower Corporation
- Inventors: Patrick L. Chapman; Anant Kumar Singh
- Web page: https://patentgrep.com/patent/US20170288599A1

## CPC

- H02S 10/00: PV power plants; Combinations of PV energy systems with other systems for the generation of electric power
- G05B 15/02: electric
- G06Q 30/018: Certifying business or products
- G06Q 50/06: Energy or water supply
- H02J 3/381: {Dispersed generators}
- H02J 13/1311: {using the power network as support for the transmission}
- H02J 13/1321: {using a wired telecommunication network or a data transmission bus}
- H02J 13/1337: {involving the use of Internet protocols}
- H02S 20/23: specially adapted for roof structures
- H02S 50/00: Monitoring or testing of PV systems, e.g. load balancing or fault identification
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 2101/22: Solar energy
- H02J 2101/24: Photovoltaics
- Y02B 10/10: Photovoltaic [PV]
- Y02E 10/56: Power conversion systems, e.g. maximum power point trackers
- Y02E 40/70: Smart grids as climate change mitigation technology in the energy generation sector
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/123: the energy generation units being or involving renewable energy sources
- Y04S 10/14: Energy storage units
- Y04S 10/30: State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
- Y04S 40/121: using the power network as support for the transmission
- Y04S 40/124: using wired telecommunication networks or data transmission busses
- H02S: GENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES (obtaining electrical energy from radioactive sources G21H1/12; light sensitive inorganic semiconductor devices H10F; light sensitive organic semiconductor devices H10K30/00; thermoelectric devices H10N10/00; pyroelectric devices H10N15/00)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

An electric system includes a local power controller and solar panel system that includes a plurality of solar modules on one or more branch circuits. A method for commissioning the electric system includes an installer using a commissioning device to send and receive information from a remote system and the local power controller performing an automatic self-test of the electric system. The results of the self-test may be packaged with photographs and measurements of the electric system and sent to a remote system where an inspector can inspect the electric system remotely. After receiving approval by the inspector, the local power controller may automatically activate each branch circuit of the electric system and thus enabling the electric system to generate electricity.

## Claims

### Claim 1

A method for commissioning an electric system comprising:
installing the electric system, wherein the electric system includes:
a local solar power controller, and
a first branch circuit in communication with the local solar power controller, wherein the first branch circuit includes a first branch controlled switch and a plurality of photovoltaic (PV) modules;
activating the local solar power controller;
receiving, at a commissioning device, an identifier of the electric system;
receiving, at the local power controller, site design data from a remote system, wherein the site design data relates to a predetermined electric system site design of the electric system;
activating, with the local solar power controller, the first branch circuit by closing the first branch controlled switch;
collecting, with the local solar power controller, first data relating to the PV modules of the first branch circuit;
deactivating, with the local solar power controller, the first branch circuit by opening the first branch controlled switch;
analyzing, with the local solar power controller, the first data and site design data to determine whether the electric system conforms to the predetermined electric system site design; and
when the electric system conforms to the predetermining electric system site design:
generating a self-test pass indicator,
transmitting the self-test pass indicator from the local solar power controller to the commissioning device,
receiving at the commissioning device one or more indicators of physical characteristics of the electric system, and
transmitting, with the commissioning device, the self-test pass indicator and the one or more indicators of physical characteristics of the electric system to the remote system.

### Claim 2 (depends on 1)

The method for commissioning an electric system of claim 1 further comprising:
receiving an inspector pass indicator from the remote system; and
activating, with the local solar power controller, the first branch circuit by closing the first branch controlled switch.

### Claim 3 (depends on 1)

The method for commissioning an electric system of claim 1 further comprising:
when the electric system does not conform to the predetermined electric system site design:
generating a self-test fail indicator,
transmitting the self-test fail indicator from the local solar power controller to the commissioning device,
modifying the electric system by one or more of adding additional components, removing components, or
rearranging components.

### Claim 4 (depends on 1)

The method for commissioning an electric system of claim 1 further comprising:
receiving an inspector fail indicator from the remote system; and
modifying the electric system by one or more of adding additional components, removing components, or rearranging components.

### Claim 5 (depends on 1)

The method for commissioning an electric system of claim 1 wherein the identifier of the electric system includes one or more of an electric system serial number, a street address of the electric system, a geolocation of the electric system, or a permit number.

### Claim 6 (depends on 1)

The method for commissioning an electric system of claim 1 wherein the electric system further comprises a second branch circuit in communication with the local solar power controller, wherein the second branch circuit includes a second branch controlled switch and a plurality of PV modules; the method further comprising:
activating, with the local solar power controller, a second branch circuit by closing a second branch controlled switch;
collecting, with the local solar power controller, second data relating to PV modules coupled to the second branch circuit;
deactivating, with the local solar power controller, the second branch circuit by opening the second branch controlled switch; and
analyzing, with the local solar power controller, the second data and site design data to determine whether the electric system conforms to the predetermined electric system site design.

### Claim 7 (depends on 6)

The method for commissioning an electric system of claim 6 wherein the site design data includes one or more of:
a list of serial numbers of PV modules to be installed in the electric system,
a total number of PV modules to be installed in the electric system,
an expected voltage of the electric system,
an expected power output of the electric system,
a list of serial numbers of PV modules in the first branch circuit,
a list of serial numbers of PV modules in the second branch circuit,
a total number of PV modules in the first branch circuit,
a total number of PV modules in the second branch circuit,
an expected voltage of the first branch circuit,
an expected voltage of the second branch circuit,
an expected power output of the first branch circuit,
an expected power output of the second branch circuit;
an expected presence of an end cap on the first branch circuit,
an expected presence of an end cap on the second branch circuit,
a tilt angle of one or more PV modules in the first branch circuit,
a tilt angle of one or more PV modules in the second branch circuit,
a compass direction of one or more PV modules in the first branch circuit, or
a compass direction of one or more PV modules in the second branch circuit.

### Claim 8 (depends on 7)

The method for commissioning an electric system of claim 7 wherein:
the first data relating to the PV modules includes one or more of serial numbers for each PV module in the first branch circuit, a total number of PV modules in the first branch circuit, a voltage of the first branch circuit, a power output of the first branch circuit, or a presence of an end cap on the first branch circuit; and
the second data relating to the PV modules includes one or more of serial numbers for each PV module in the second branch circuit, a total number of PV modules in the second branch circuit, a voltage of the second branch circuit, a power output of the second branch circuit, or a presence of an end cap on the second branch circuit.

### Claim 9 (depends on 8)

The method for commissioning an electric system of claim 8 wherein analyzing, with the local solar power controller, the first data, second data, and site design data to determine whether the electric system conforms to the predetermining electric system site design includes one or more of:
determining whether the list of serial numbers of PV modules in the first branch circuit of the site design data matches the serial numbers for each PV module in the first branch circuit of the first data and the list of serial numbers of PV modules in the second branch circuit of the site design data matches the serial numbers for each PV module in the first branch circuit of the first data;
determining whether the total number of PV modules in the first branch circuit of the site design data matches the total number of PV module in the first branch circuit of the first data and the total number of PV modules in the second branch circuit of the site design data matches the total number of PV modules in the second branch circuit of the second data;
determining whether the expected voltage of the first branch circuit of the site design data matches the voltage of the first branch circuit of the first data and the expected voltage of the second branch circuit of the site design data matches the voltage of the second branch circuit of the second data;
determining whether the expected power output of the first branch circuit of the site design data matches the power output of the first branch circuit of the first data and the expected power output of the second branch circuit of the site design data matches the power output of the second branch circuit of the second data; or
determining, if the presence of an end cap is expected on one or more of the first branch circuit or second branch circuit, whether the expected end cap is present on one or more of the first branch circuit or second branch circuit.

### Claim 10 (depends on 1)

The method for commissioning an electric system of claim 1 wherein the one or more indicators of physical characteristics of the electric system includes one or more images of the electric system, wherein each image has one of more of a timestamp or location stamped.

### Claim 11 (depends on 1)

The method for commissioning an electric system of claim 1 wherein the one or more indicators of physical characteristics of the electric system includes one or more of a tilt angle or compass direction of one or more PV modules.

### Claim 12

An automatic site commissioning method for commissioning an electric system comprising:
receiving, at the local solar power controller, site design data relating to a predetermined electric system site design of the electric system;
activating, with a local solar power controller, a first branch circuit by closing a first branch controlled switch;
collecting, with the local solar power controller, first data relating to photovoltaic (PV) modules coupled to the first branch circuit;
deactivating, with the local solar power controller, the first branch circuit by opening the first branch controlled switch; and
analyzing, with the local solar power controller, the first data and site design data to determine whether the electric system conforms to the predetermining electric system site design.

### Claim 13 (depends on 12)

The automatic site commissioning method of claim 12 further comprising:
activating, with the local solar power controller, a second branch circuit by closing a second branch controlled switch;
collecting, with the local solar power controller, second data relating to PV modules coupled to the second branch circuit;
deactivating, with the local solar power controller, the second branch circuit by opening the second branch controlled switch; and
analyzing, with the local solar power controller, the second data and site design data to determine whether the electric system conforms to the predetermining electric system site design.

### Claim 14 (depends on 13)

The automatic site commissioning method of claim 13 wherein the site design data includes one or more of:
a list of serial numbers of PV modules to be installed in the electric system,
a total number of PV modules to be installed in the electric system,
an expected voltage of the electric system,
an expected power output of the electric system,
a list of serial numbers of PV modules in the first branch circuit,
a list of serial numbers of PV modules in the second branch circuit,
a total number of PV modules in the first branch circuit,
a total number of PV modules in the second branch circuit,
an expected voltage of the first branch circuit,
an expected voltage of the second branch circuit,
an expected power output of the first branch circuit,
an expected power output of the second branch circuit, or
an expected presence of an end cap on the first branch circuit,
an expected presence of an end cap on the second branch circuit,
a tilt angle of one or more PV modules in the first branch circuit,
a tilt angle of one or more PV modules in the second branch circuit,
a compass direction of one or more PV modules in the first branch circuit, or
a compass direction of one or more PV modules in the second branch circuit.

### Claim 15 (depends on 14)

The automatic site commissioning method of claim 14 wherein:
the first data relating to the PV modules includes one or more of serial numbers for each PV module in the first branch circuit, a total number of PV modules in the first branch circuit, a voltage of the first branch circuit, a power output of the first branch circuit, or a presence of an end cap on the first branch circuit; and
the second data relating to the PV modules includes one or more of serial numbers for each PV module in the second branch circuit, a total number of PV modules in the second branch circuit, a voltage of the second branch circuit, a power output of the second branch circuit, or a presence of an end cap on the second branch circuit.

### Claim 16 (depends on 15)

The automatic site commissioning method of claim 15 wherein analyzing, with the local solar power controller, the first data, second data, and site design data to determine whether the electric system conforms to the predetermining electric system site design includes one or more of:
determining whether the list of serial numbers of PV modules in the first branch circuit of the site design data matches the serial numbers for each PV module in the first branch circuit of the first data and the list of serial numbers of PV modules in the second branch circuit of the site design data matches the serial numbers for each PV module in the first branch circuit of the first data;
determining whether the total number of PV modules in the first branch circuit of the site design data matches the total number of PV module in the first branch circuit of the first data and the total number of PV modules in the second branch circuit of the site design data matches the total number of PV modules in the second branch circuit of the second data;
determining whether the expected voltage of the first branch circuit of the site design data matches the voltage of the first branch circuit of the first data and the expected voltage of the second branch circuit of the site design data matches the voltage of the second branch circuit of the second data;
determining whether the expected power output of the first branch circuit of the site design data matches the power output of the first branch circuit of the first data and the expected power output of the second branch circuit of the site design data matches the power output of the second branch circuit of the second data; or
determining, if the presence of an end cap is expected on one or more of the first branch circuit or second branch circuit, whether the expected end cap is present on one or more of the first branch circuit or second branch circuit.

### Claim 17

An electric system comprising:
a first branch circuit, wherein the first branch circuit includes a first branch controlled switch and a plurality of photovoltaic (PV) modules; and
a local solar power controller including:
a processor, and
a tangible, computer-readable memory storing instructions that when executed by the processor cause the local solar power controller to:
receive site design data relating to a predetermined electric system site design of the electric system,
activate the first branch circuit by closing the first branch controlled switch,
collect first data relating to PV modules coupled to the first branch circuit,
deactivate the first branch circuit by opening the first branch controlled switch, and
analyze the first data and site design data to determine whether the electric system conforms to the predetermined electric system site design.

### Claim 18 (depends on 17)

The electric system of claim 17 further comprising:
a second branch circuit, wherein the second branch circuit includes a second branch controlled switch and a plurality of PV modules;
wherein the tangible, computer-readable memory further stores instructions that when executed by the processor cause the local solar power controller to:
activate the second branch circuit by closing the second branch controlled switch,
collect second data relating to PV modules coupled to the second branch circuit,
deactivate the second branch circuit by opening the second branch controlled switch, and
analyze the second data and site design data to determine whether the electric system conforms to the predetermined electric system site design.

### Claim 19 (depends on 17)

The electric system of claim 17:
wherein the first branch circuit controlled switch comprises a first branch circuit relay transistor in communication with a first branch circuit relay;
wherein the second branch circuit controlled switch comprises a second branch circuit relay transistor in communication with a second branch circuit relay; and
wherein the first branch controlled switch and the second branch controlled switch are disposed in an aggregation panel switcher, the aggregation panel switcher including:
a controller in communication with the first branch circuit relay transistor and the second branch circuit relay transistor, the relay housing controller including:
a processor;
a tangible, computer-readable memory storing instructions that when executed by the processor cause the controller to:
receive a command from the local power controller to activate one or more of the first branch circuit relay or second branch circuit relay,
receive a command from the local power controller to deactivate one or more of the first branch circuit relay or second branch circuit relay,
activate the first branch circuit relay by outputting an ON signal to the gate of the first branch circuit relay transistor,
deactivate the first branch circuit relay by outputting an OFF signal to the gate of the first branch circuit relay transistor,
activate the second branch circuit relay by outputting an ON signal to the gate of the second branch circuit relay transistor, and
deactivate the second branch circuit relay by outputting an OFF signal to the gate of the second branch circuit relay transistor.

### Claim 20 (depends on 19)

The electric system of claim 19 wherein:
the first branch controlled switch is a normally-on type controlled switch; and
the second branch controlled switch is a normally-off type controlled switch.