# US 2017/0288455 A1 · Prediction of electrical power system behavior, and related systems, apparatuses, and methods

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2017/0288455 A1
- Document ID: US20170288455A1
- Status: Published application
- Kind: A1
- Application number: 15/474,743
- Filed: 2017-03-30
- Published: 2017-10-05
- Earliest claimed: 2016-04-01
- Applicants: Demand Energy Networks, Inc.
- Inventors: John Michael Fife
- Web page: https://patentgrep.com/patent/US20170288455A1

## CPC

- G06Q 10/06313: {Resource planning in a project environment}
- G01R 31/367: Software therefor, e.g. for battery testing using modelling or look-up tables
- G01R 31/392: Determining battery ageing or deterioration, e.g. state of health
- G05B 13/021: {in which a variable is automatically adjusted to optimise the performance}
- G05B 13/0265: {the criterion being a learning criterion}
- G05B 13/041: {in which a variable is automatically adjusted to optimise the performance}
- G05B 13/048: {using a predictor}
- G05B 17/02: electric
- G05F 1/66: Regulating electric power
- G06Q 10/06315: {Needs-based resource requirements planning or analysis}
- G06Q 30/0206: {Price or cost determination based on market factors}
- G06Q 50/06: Energy or water supply
- H02J 3/00: Circuit arrangements for AC mains or AC distribution networks
- H02J 3/004: {Generation forecast, e.g. methods or systems for forecasting future energy generation}
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 3/28: Arrangements for balancing of the load in networks by storage of energy
- H02J 3/46: Controlling the sharing of generated power between the generators, sources or networks
- H02J 13/00: Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
- H02J 13/1337: {involving the use of Internet protocols}
- H02J 7/585: {Sequential battery discharge in systems with a plurality of batteries}
- H02J 13/10: characterised by displaying of information or by user interaction, e.g. supervisory control and data acquisition [SCADA] systems
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- H02J 2105/55: according to an economic condition, e.g. tariff-based load management
- Y02B 10/30: Wind power
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- Y04S 50/10: Energy trading, including energy flowing from end-user application to grid
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G05F: SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Prediction of electrical power system behavior, and related systems, apparatuses, and methods are disclosed. A controller includes a data storage device configured to store model data for time points of a time period of operation. The controller also includes a processor configured to determine current data for time points of a current time period of operation. The current time period corresponds to an early portion of the time period of the model data. The controller is also configured to fit the model data to the current data to produce predicted data, a future portion of the predicted data corresponding to time points occurring after the early portion of the time period of the model data. The controller is further configured to determine values for a set of control variables to effectuate a change to operation of the electrical power system based on the future portion of the predicted data.

## Claims

### Claim 1

A controller of an electrical power system, the controller comprising:
a data storage device configured to store model data indicating, for time points of a time period of operation of the electrical power system, a model load power for one or more loads of the electrical power system; and
a processor operably coupled to the data storage device and configured to:
determine, based on information received from one or more sensors of the electrical power system, current data including a current load power for the one or more loads for time points of a current time period of operation of the electrical power system, the current time period corresponding to an early portion of the time period of the model data stored by the data storage device;
fit the model data to the current data to produce predicted data, a future portion of the predicted data corresponding to time points occurring after the early portion of the time period of the model data; and
determine a set of control values to effectuate a change to operation of the electrical power system based, at least in part, on the future portion of the predicted data.

### Claim 2 (depends on 1)

The controller of claim 1, wherein the processor is configured to fit the model data to the current data to produce the predicted data by performing a least squares regression to determine a scale and offset of the model data that minimize a sum of squares of error between the model data and the current data.

### Claim 3 (depends on 1)

The controller of claim 1, wherein the least squares regression comprises a weighted least squares regression that favors more recent samples of the current data than older samples of the current data.

### Claim 4 (depends on 1)

The controller of claim 1, wherein the processor is configured to interpolate the model data to have a same time step length between samples as the current data.

### Claim 5 (depends on 4)

The controller of claim 4, wherein the processor is configured to interpolate the model data using a linear interpolation.

### Claim 6 (depends on 4)

The controller of claim 4, wherein the processor is configured to interpolate the model data using a nonlinear interpolation.

### Claim 7 (depends on 1)

The controller of claim 1, wherein an amount of time corresponding to the early portion of the time period is about three (3) hours to about eighteen (18) hours.

### Claim 8 (depends on 1)

The controller of claim 1, wherein:
the model data indicates a plurality of different load power profiles of power for the one or more loads of the electrical power system; and
the processor is configured to select one of the different load power profiles that fits the current data better than the others of the different load power profiles to fit to the current data to produce the predicted data.

### Claim 9 (depends on 8)

The controller of claim 8, wherein one of the different load power profiles corresponds to a weekday and another of the different load power profiles corresponds to a weekend day.

### Claim 10 (depends on 1)

The controller of claim 1, wherein:
the model data also indicates a model generator power provided by one or more generators of the electrical power system for the time points of the time period of operation of the electrical power system; and
the processor is configured to determine, based on the information received from the one or more sensors of the electrical power system, current generator data of the current data including a current generator power provided by the one or more generators for the time points of the current time period of operation of the electrical power system.

### Claim 11 (depends on 1)

The controller of claim 1, wherein the time period of operation of the electrical power system corresponding to the model data spans twenty-four (24) hours.

### Claim 12

An electrical power system, comprising:
one or more loads;
one or more sensors operably coupled to the one or more loads and configured to measure power for the one or more loads; and
a controller operably coupled to the one or more sensors, the controller configured to:
store model data indicating, for time points of a time period of operation of the electrical power system, a model load power of the one or more loads;
determine, based on information received from the one or more sensors, current data including a current load power consumed by the one or more loads for time points of a current time period of operation of the electrical power system, the current time period corresponding to an early portion of the time period of the model data stored by the data storage device;
fit the model data to the current data to produce predicted data, a future portion of the predicted data corresponding to time points occurring after the early portion of the time period of the model data; and
determine a set of control values to effectuate a change to operation of the electrical power system based, at least in part, on the future portion of the predicted data.

### Claim 13 (depends on 12)

The electrical power system of claim 12, further comprising:
one or more generators operably coupled to the one or more sensors and configured to provide power;
wherein:
the one or more sensors are configured to measure power provided by the one or more loads;
the model data also indicates, for the time points of the time period, a model generator power provided by the one or more generators; and
the current data also indicates a current generator power provided by the one or more generators for the time points of the current time period.

### Claim 14 (depends on 13)

The electrical power system of claim 13, wherein the one or more generators include one or more of a solar photovoltaic (PV) system, a wind generator, a combined heat and power (CHP) system, or a diesel generator.

### Claim 15 (depends on 12)

The electrical power system of claim 12, wherein the one or more loads include one or more of an air conditioning system, a motor, or an electric heater.

### Claim 16

A method of operating an electrical power system, the method comprising:
storing current data indicating power for the one or more loads at a first plurality of different points of time over a previous number of hours of operation;
interpolating model data indicating a historic average power for the one or more loads at a second plurality of different points of time over a time span to have an interval of discretization that is the same as that of the current data, a subset of the time span corresponding to the previous number of hours of operation;
determining a scale and an offset of the interpolated model data that fits a subset of the interpolated model data corresponding to the subset of the time span to the current data;
scaling and offsetting the interpolated model data to produce predicted data, a future portion of the predicted data comprising future data; and
determining a set of control values to effectuate a change to operation of the electrical power system based, at least in part, on the future data.

### Claim 17 (depends on 16)

The method of claim 16, wherein storing current data indicating power for the one or more loads at a first plurality of different points of time over a previous number of hours of operation comprises storing the current data indicating the power for the one or more loads over a period of about three (3) to eighteen (18) hours.

### Claim 18 (depends on 16)

The method of claim 16, wherein interpolating model data includes interpolating the model data from having the interval of discretization between five (5) minutes and 120 minutes.

### Claim 19 (depends on 16)

The method of claim 16, wherein interpolating model data includes linearly interpolating the model data.

### Claim 20 (depends on 16)

The method of claim 16, wherein determining a scale and an offset of the interpolated model data comprises performing a weighted least squares regression that favors more recent observations of the current data.
